Horticulture<br />

<strong>DETAILED</strong> <strong>PROJECT</strong> <strong>REPORT</strong> <strong>FOR</strong> <strong>IWMP‐I‐WAKRO</strong> <strong>CD</strong> <strong>BLOCK</strong><br />

UNDER LOHIT DISTRICT, ARUNACHAL PRADESH<br />

Forestry<br />

Agriculture on<br />

bench terraces<br />

Water Harvesting<br />

Pond<br />

Valley Land for<br />

Paddy<br />

UNDER INTEGRATED WATERSHED MANAGEMENT PROGRAMME<br />

‐ 1 ‐


INTRODUCTION:<br />

Chapter I<br />

Arunachal Pradesh is situated in the North Eastern Border of India stretching between longitude 90 0 to 30 ’ E and 97 0 30 ’ E and latitude<br />

26 0 28 ’ N and 29 0 31’ N. It spreads over an area of 83,743 sq. km touching the international boundary with Bhutan in the West, China in<br />

the North and Myanmar in the South­East. On the south, it is linked with Assam & Nagaland. The State consists of 16 District,45 Sub­Divisions<br />

and 172 administrative circles with population of is 10,97 ,968 as per 2001 census The State registered a decadal population growth rate<br />

of 27.0 during the decade 1991­01.<br />

Lohit district is the largest district of Arunachal Pradesh with an area of 5212 sq.km . This district is named after popular river, Lohit. It<br />

is situated between 27 0 30 ’ to 28 0 21’N & 94 0 18 ’ to 95 0 45’ E .It borders Lower Dibang Valley on West, Changlang on the East & China on<br />

the North. It has 2 subdivisions, 6 administrative circles with 5 <strong>CD</strong> Blocks with population of 1,25,086 as per 2001 Census. The district<br />

registered a decadal growth rate of 30.8 during the decade 1991­01. The district Hq is located at Tezu. Important places for tourists in the<br />

district are Parashuram Khund, Glow Lake & Lohit View etc.<br />

TOPOGRAPHY:<br />

Lohit District is a mountainous tract. On account of the existence of the hill ridges and the valleys its topography assumes typical<br />

character. The hill ridges are situated haphazardly. As soon as one ends the other ridge starts either parallel or in opposite direction. At these<br />

intervals the wide or narrow valleys get the foothills constituting 20 per cent to total geographical area of district. The wide and narrow<br />

valleys share 35 per cent each to total geographical area. The rest about 10 percent is the snow clad peaks. Due to typical topography the<br />

rivers are undulated. There are numerous streams and rivers and are drained by principal riverLohit, Naodihing etc. These principal rivers<br />

of the district are drained by the westerly flowing Brahmaputra. These rivers have rendered the human habitations into geographical<br />

isolations. At the same time these rivers possess high hydro­power potential. It could be developed as a good industry. The vast natural<br />

resources have drawn the attention of the Government during recent years.<br />

POPULATION CHARACTERISTICS:<br />

‐ 2 ‐


Lohit under present reference is exclusively a tribal district. Major tribes are: Taraon Mishmis,Kaman Mishmis, Khamptis, Singphos &<br />

Zakhrings & other tribes of districts engaged as Govt. servant and floating population of of general category engaged exclusively on business<br />

& labour classes.<br />

LAND USE:<br />

The land – based enterprises support a large segment of population in the district. The land­based enterprises particularly the<br />

cultivation of field crops as well as horticulture crops is considered a critical determinate of the pace of overall economic development. The<br />

efficient use of land resource, therefore, assumes singular significance with respect to planning of economic activities.<br />

It is sparsely populated with 13 persons per sq.km. Plenty of land is available to the tribesman as natural gift although there is no<br />

land record, the land ownership can be classified under three broad heads: (1) community ownership (2) clan/Individual ownership<br />

and (3) Govt. Ownership.<br />

DRAINAGE SYSTEM:<br />

The drainage system of Arunachal Pradesh is still in an evolutionary stage and, therefore, is immature and is controlled by the main<br />

ranges of the Greater as well as Lesser Himalayas in the Western parts and the frontal ranges and Mishmi hills of the Eastern parts of the<br />

State. The main ranges, peaks, passes, escarpments of these mountains of the Greater Himalayas play a great role in developing the drainage<br />

patterns and acting as ‘water divide’ by following the National as well as International boundary between India and China (Tibet). There are<br />

five well –delineated boundary river system which are the part of Brahamputra system. The administrative boundaries at district level cincide<br />

with the river­basin boundaries in the state. The Kameng, Subansiri, Siang, Dibang and Lohit­Tellu river system cover most of the part of the<br />

State. But they have different characteristics. The Kurung & kumey rivers form also a part o<br />

The drainage pattern is radial specially in the upper parts of the Greater Himalayan zone of Indo­Tibetan border. The radial patterns<br />

evolve because of their conical hills and round mountan peaks.<br />

LOHIT RIVER BASIN:<br />

It also has a transitional character developed between the Tirap lineament of the eastern extension of the Himalayas and the Mismi<br />

thrust hills aligning in a NW­SE direction through which Krawnaan river passes its water to the Brahmaputra river system. The Lohit river<br />

basin is well­ developed by the erosional activities of rivers. It is quite large in its size i.e. more than 10,000 sq.km and has a variety of<br />

‐ 3 ‐


topographic features with well drained eight sub­basins and two interfluves as the Digaru, the Tiding, the Delei, the middle Lohit, the Upper<br />

Lohit, the Beiang, the Bara Tenga and the Lohit lowland which include two interfluves as the Lohit and the Tellu interfluves<br />

Tellu is main River which forms a well­ developed rriver system in the area. It flows in the Mismi thrust alongwith the Eastern border of<br />

the state. It enters into Arunachal Pradesh through Du pass of about 2,200, elevation and merges in Brahamputra only at 100m height from<br />

m.s.l. It has gentle slope in almost all its sections with a 2,100m vertical interval at 200 km of total length of the river section.<br />

Overview of the District:<br />

District Profile:<br />

1 2 3 4 5 6 7<br />

Sl.<br />

No.<br />

Name of<br />

District<br />

No. of<br />

Blocks<br />

Total<br />

no. of<br />

villages<br />

Total<br />

no. of<br />

Gram<br />

Panch­<br />

ayats<br />

1. Lohit 5 223 761 521200<br />

Geogr­<br />

aphical<br />

area in<br />

Ha. SC ST<br />

97<br />

3<br />

‐ 4 ‐<br />

Population (As per the 2001 Census)<br />

Male Female Total<br />

Ot<br />

her<br />

s<br />

SC ST<br />

20532 823 20020<br />

(Source: Directorate of Economics & Statistics/Rural Development / Panch ayat, Itanagar)<br />

Ot<br />

he<br />

rs<br />

SC ST<br />

179<br />

6<br />

Othe<br />

rs<br />

% of BPL<br />

to total<br />

popul­<br />

ation<br />

40,552 63.16


Economic Development<br />

The developmental experience of the district has been full of challenges. Apart from its late start, geographical remoteness<br />

and inaccessibility, hilly terrain, lack of infrastructure, population composition, and scarce resource base, the district has indirect<br />

effect of continuous insurgency at two districts (Tirap & Changlang), spending much of its resources on administration and related<br />

costs at the expense of development. Despite the progress made in a span of 37 years. Lohit economy still confronts many<br />

developmental challenges. Foremost among them are the difficult terrain, and inaccessibility to the rest of the world and continued<br />

insurgency at Tirap & Changlang ­ where huge chunk of resources are drained. These handicap the District’s endeavors towards<br />

industrial and entrepreneurial development, private sector partnership in spearheading development initiatives and all round<br />

planning.<br />

The Gross District Domestic Product for the year 2007­08 is estimated at Rs.46,635 lakhs with a per capita income of<br />

Rs.29,952 against state per capita income of Rs 24,264.The infrastructure Development Index (IDI) of the district is low with the<br />

state at 140.22 against the all India average of 138. It continues to confront with many inadequacies in the areas of physical and<br />

social infrastructure. The pattern of infrastructure elements for socio­economic development in the district as on 2006­07 are­<br />

Educational institutions: 174, No. of Medical (allopathetic): 55, Postal facilities: Headpost­NIL, sub­post office­5 & EDBPO’s­29,<br />

Market/haat facilities: At Rural/Urban areas,Cooperative­3 nos & others­102 nos, no. of Commercial banks: 27 nos which includes<br />

SBI &Co­operative Apex Bank branches etc.<br />

For the development of such essential and critical areas, the district is constantly faced with acute financial and resource<br />

problems. One of the reasons for this state of affairs is the almost non­existent Tax base of the state. The tribal traditions and<br />

customs of the inhabitants have also been protected by special provisions in the constitution of India as a result of which, the state<br />

does not own any land unless purchased from the people or on compensation for specific purposes by the government.<br />

Agriculture & Horticulture:<br />

Lohit district has a gross cropped area of 30,959 ha & net irrigated area of 1243 ha as per census 2001. Though there<br />

have been remarkable achievement in the field of agriculture but the target of growth rate (in terms of value added) envisaged for<br />

the Xth plan could not be achieved due to unfavorable rain and other factors in the form of excess rain or no rain and drought like<br />

situation over the years. The average annual growth during the 2007­08 was estimated much below targeted growth rates of 4%.<br />

‐ 5 ‐


The average annual plan growth of food grains production has shown a declining trend over the yeas on account of following<br />

reasons:<br />

• Recurring crop losses due to natual calamities in form of heavy rain, flood & moisture stress condition.<br />

• Low irrigation intensity.<br />

• Unavailability of terraced land in border and inaccessible areas.<br />

The cropping pattern of the district is charaterised by the dominance of food­grain crops. Paddy is a prinicipal foodgrain<br />

which occupies a major share of GCA (48.99% in 2006­07). Maize and Millets are also important foodgrains which account for<br />

37.43 % and 0.40 % of the GCA in the district, while Wheat accounts for 1.96 % & Pulses at 7.78 % in the cropping pattern.<br />

Because of Subtropical climate condition and fertile alluvial wet soils in the Lohit plains, oilseeds make up 11.64 % of commercial<br />

crops with Potato as the major crops which are grown for fulfilling the domestic demand. Zinger is also a commercial crop which<br />

occupies more than 1.119 % area of GCA & Chillies in 2006­07 in the district. The District & the Wakro <strong>CD</strong> block has the cropping<br />

pattern­single/double/multiple as per statements issued by the authority of the Agriculture/ Horticulture departments as follows­<br />

?<br />

&<br />

It recorded an average yield rate per hectare of 24.30 on HYV crops with Consumption of fertilizers 65.45 (NPK).It had a<br />

production of N.A MT (N.A hectare) of fruits & NA MT( in NA ha) of Species during 2006­07, which exhibited decline in production<br />

due to discontinuation of maintenance related schemes like rejuvenation of old orchard, manures & fertilizers, P.P measures etc<br />

In the light of growing economy, high population growth and food, nutritional and environmental security, priority in the<br />

coming years (XI th plan) will be concentrated to following objectives / development issues in order to achieve desire growth rate.<br />

• Productivity to profitability through diversification.<br />

• Subsistence to commercial agriculture.<br />

• Bring more area under assured irrigation by creating additional irrigation facility.<br />

• Commodity oriented to farming system approach.<br />

• Local markets to export oriented.<br />

‐ 6 ‐


Power:<br />

• Technology to eco­technology.<br />

• Mono­cropping to crop diversity by enhancing cropping intensity.<br />

• Exploitative to sustainable agriculture.<br />

• Raw material to value additional by creating processing facilities.<br />

• Technology generation and dissemination.<br />

Lohit District has 2 town, 156 nos of villages electrified which comes to the tune of 71.49 % as per 2001 census.<br />

The state still suffers from shortfall in its generation of power. Against the present requirement of 105 MW, the state’s own<br />

generation is a mere 66.33 MW only with a shortfall of 38.67 MW. This shortfall is presently met through purchases from other<br />

neighbouring states. State has also launched the Hydropower policy’2008 for development of 56,151 MW potential in a very eco­<br />

environment & people­friendly manner with no disturbance to ecology, avoiding submergence, displacement of people &<br />

consequent rehabilitation & resentment problems. The total number of villages electrified as on 2001­2002 was 2195 constituting<br />

56.82 % of the inhabited villages. Per capita consumption of electricity was 95.63 Kws during 1996­97, as compared to the<br />

minimum of 80.4 Kws by Tripura and maximum of 192.80 Kws by Meghalaya among the north­eastern states<br />

Transport & Communication:<br />

During 2004­05 Lohit (Combined with Anjaw) had 424.314 km of road length constructed by PWD with 235.617 km black<br />

topped, 83.663 km Water bound macadam & unsurfaced road length of 105.034 km constituting around 6.31 % of state<br />

road length. The road density per thousand sq.km of geographical area was 3.3041 km. Whereas, the length of road<br />

constructed by BRTF / RWD / Forest Departments as on 2006­07 comes to 511.16 km ( B/T­ 222.10, WBM­69.34,<br />

‐ 7 ‐


Gravelled­40.31 km and unsurface – 190.54 km respectively). This gives additional road density per thousand Sq. KM of<br />

6.72 km thereby, the total density goes up by 13.03 km per thousand sq km.<br />

This is against total length of the roads in the state of Arunachal Pradesh during 2004­05 as 6724.140 Km. Of this, the total<br />

length of surface roads was 2081.122 Km, Water bound macadam was 1693.691 km and unsurfaced roads was 2916.805 Km<br />

constituting 30.95% and 25.188% & 43.37% respectively of the total road length in the state. The road density per thousand Sq.<br />

Km. of geographical area was 80.2 Km. The state has 32.522 Km. of National Highways The current status of road network in the<br />

state is very poor as on 31 st March 2009 which stands at 21066.36 km with lowest road density of 25.16 km per 100 sq km.<br />

The only means of intra­District movement being roads, paucity of all weather roads causes delay in supply of essential<br />

commodities leading to cost escalation particularly during monsoon. Connectivity to Administrative centres and far­flung remote<br />

and inaccessible areas are established by maintaining helipads and ALGs. The Pawn Hans, jagson and army sortie services are<br />

pressed into for these jobs. There is heavy involvement on account of flying, upliftkeepment and maintenance of existence helipads<br />

by District administration.<br />

As of 2006­07, the district had only 45 nos of suspension bridges to water gap constructed by RWD with no of bridges<br />

constructed by PWD / BRTF but much more is still needed to be done. The Issues for concern are temporary bridges (log / Bailey/<br />

steel) water gaps require RCC bridges to facilitate movement for heavy vehicles which would boast development for tourism and<br />

exploration of mineral for the District.<br />

Quality of Drinking Water Supply:<br />

Initially potable water supply used to be provided to the villages by RWD & PWD to urban ares which contained<br />

impurities. As of now the rural & urban areas are provided potable water supply through gravity with purification by Public Health<br />

Engineering Deptt. Although the department has geared up to provide adequate supply without impurities but still lot more is yet<br />

‐ 8 ‐


to be done. As intimated by the PHE & WS department, the supply to project areas ( Wakro,Kathan, Cibi, Tilangkyong, Old<br />

Pukhuri, Towam,Tamliang & Mawai­I Villages under wakro <strong>CD</strong> Block) are having sources at ­­stream & the status of<br />

supplied water is as follows­<br />

Irrigation:<br />

Lohit has 226 ha irrigation potential created with 7 nos of canals, 12 ha of area irrigated more than once,87 ha net area irrigated<br />

& 99 ha of gross area irrigation as as on 2006­07. District economy being largely agrarian, irrigation is to play vital input, increased<br />

agricultural output to keep pace with food requirement and population. Owing to frequent occurrence of natural calamities – heavy<br />

rainfall, land slides, flood etc. emphasis is to be given to creation of extensive irrigation facilities so that dependence on nature and<br />

uncertainty in agricultural production would be minimized. This is against State irrigation potential of 1.03 lakh hectare created<br />

since inception. Expansion of irrigation facilities and control of flood menace, utilization of ground water potential tapping thereof<br />

at higher scale and common area development works need be taken up in a big way to bridge the huge gap of above 60%<br />

between creation and utilization of irrigation potential in the State.<br />

The district in addition to the state has prioritized­<br />

• Adaptation of technically advanced moisture conservation method of irrigation like sprinklar and Drip in water scare<br />

area for orchards, tea and vegetable garden.<br />

• Undertaking Ground water survey and exploitation of ground water for irrigation in the foothill areas of the State.<br />

• Maximizing utilization of created potential through augmentation, renovation and proper maintenance of irrigation<br />

projects and other Command Area Development works.<br />

• Peoples’ participation in the management of M.I. Projects for better utilization of potential.<br />

• Survey of flood zones for involving comprehensive flood management – long / short term.<br />

‐ 9 ‐


Large irrigation in a compact area for the district is not possible owing to undulating topography. However medium irrigation<br />

projects at foot hill belts are to be taken up. There is acute need of resource support of centre for reconstruction and rejuvenation<br />

of irrigation structures along with taping of ground water potential and appropriate centrally sponsored scheme is imperative<br />

Role of watershed management in the District:<br />

In Lohit District, the high prevalence of shifting cultivation, also known as Jhum, forms the major cause of wastelands. With<br />

the rapid increase in population, the jhum cycle has now been reduced to 5­8 years and the previously uncultivated and steep land<br />

is being taken into the jhum system. This results in accelerating both on site and off site degradation due to erosion, runoff,<br />

nutrient losses, siltation, loss of bio­diversity and disruption in watershed hydrology. In spite of several attempts made in the past<br />

by the State Government to wean people away from this practice, majority of the people continue to practice jhum and the total<br />

area put under this system continue to increase rapidly, thereby causing natural resource degradation.<br />

Having realized the gravity of the problem of natural resource degradation and the urgency of evolving a strategy for<br />

management of the land, various Centrally Sponsored Schemes of Watershed Programme has been taken up in the district. With<br />

the implementation of Watershed Programmes, the vast jhum land which lies barren, are being reclaimed for afforestation,<br />

horticulture, cash crop cultivation thereby providing subsistence for the farmers and also various soil and moisture conservation<br />

measures are being incorporated in the programme. The programme being community­based, a sustained community action for<br />

operation and maintenance of assets have been created and further development of the potential of the natural resources in the<br />

watershed is encouraged. The poorer sections of the society are also benefited by enrolling themselves as part of the Self Help<br />

Group, User group whereby various income generating activities are taken up.<br />

The DRDATezu with Block Development officers as PIAs under department of Rural Development has been implementing<br />

Centrally Sponsored Scheme of Integrated Wastelands Development Programme (IWDP) under which grant­in­aid is provided from<br />

the Ministry of Rural Development, Department of Land Resources, for development of wastelands on watershed basis directly to<br />

‐ 10 ‐


DRDAs. This is one of the major watershed programme implemented in the state. Under District Agriculture Department watershed<br />

projects have also been taken up, viz.,NWDPRA ­ 9 nos (4500 ha) & WDPSCA­ NIL nos( NIL ha).<br />

A total of 5 projects have been sanctioned so far by the Government of India covering total watershed area of 24,500 ha.<br />

Out of which, two projects cover Wakro <strong>CD</strong> Block covering an area of 6000 ha.<br />

Chapter 2<br />

The expected outcomes as a result of the implementation of the watershed programmes are as follows :<br />

Agro­climatic zones :<br />

1. Increase in productivity of the land.<br />

2. Create employment opportunities<br />

3. Raise rural incomes and living standard<br />

4. Reduction in migration from rural areas<br />

5. Increase in water table in the area<br />

6. Restore ecological balance and overall environmental improvement.<br />

Lohit District Hq at Tezu at 690 km from Itanagar & situated at 210 m (Tezu) above mean sea level has a climate<br />

characterized by mild summers & moderate to Severe Winters. The mean annual precipitation ranges from 2700 to 4300 mm.<br />

Generally there is no period when the water requirement is more than the water supply (precipitation). The availability of moisture<br />

to the crops generally exceeds 270 days a year.The region is typified by ‘ Udic’ soil moisture regime. The mean annual soil<br />

temperature (MAST) varies between 18 degree centigrade to 22 degree centigrade, the region qualifies for ‘Thermic’ temperature<br />

regimes.<br />

The climate prevailing at the district experience sub­tropical at different administrative locations.At Wakro we come across<br />

Sub­tropical climate which affects the project area also. 50 % of the district falls under Thermic Humid (Mid­Hills &<br />

‐ 11 ‐


Valleys& 30 % under Alpine & High Hills & 20 % under Prehumid hyperthermic (foothills) agro­climatic sub­<br />

regions. It has summits & ridges,Steep side slope, moderately sloping side slope & narrow interhill valleys.<br />

Shifting cultivation is the traditional farming practice of tribal community in the region. Rice is the dominant crop grown in<br />

narrow valleys & hill terraces followed by maize, millet ,pea, beans, potato & vegetables.<br />

Rainfall Distribution:<br />

Precipitation is the most important element of climate which accelerates hydrological processes and also generates<br />

water resource in an area. Its seasonal variations and distributional pattern are of vital concern to assess the amount and quality of<br />

the available water for various users. The district with continuous supply of water in the main river channels with a more than<br />

three­fourth share of annual rain precipitation during the Summer (may to September). As a result, there are significant seasonal<br />

imbalances recorded in the spatial distribution of rainfall.<br />

On account of complexity prevailing in the relief features and drainage systems, the distributional pattern of annual<br />

rainfall are also complex. The low land areas receive annual rainfall exceeding 2454.47 mm on an average. Even the close valley in<br />

the lower parts of Lohit receive more than 1105 mm of average annual rainfall.<br />

Soil:<br />

The district has soil strongly to moderately acidic in nature ( PH 4 to 7) which are loamy sand­sandy loam, rich in organic matter<br />

content (0.3 to 3.31% OC) which declines sharply with depth. The soils of Summit to ridges are mostly shallow to deep, loamy<br />

skeletal to sandy­sketal excessively drained & subject to severe erosion hazards. Soil shows lack of profile development (A/C<br />

horizons) .On moderately steep side slopes of hills, moderately shallow to deep, well to somewhat excessively drained, loamy­<br />

skeletal/clayey, fine­loamy to fine particle classes with very severe to moderate erosion hazards. On moderate slopes are deep,<br />

well drained, fine/ fine­loamy, clayey/loamy skeletal in particle size classes & moderately eroded. Soil are well developed.<br />

‐ 12 ‐


Due to excessive precipitation & low temperature, Steep hill slopes & tectonically disturbed in conjunction with human<br />

interference on vegetative cover for long, these soil suffer from 1). Soil erosion & landslides,2).Limiting soil depth in steep hill<br />

slopes,3).Soil acidity & 4). Low CEC & poor base­status of the soil.<br />

These acidic soils are rich in organic matter with high rainfall & cold climate favour the plantation of different temperate & sub­<br />

tropical fruits like pears, Peech, Plum, Apple, Tea & Pineapple cultivation at foothill in addition to vegetables<br />

Details of Agro­climatic zones in the District:<br />

1 2 3 4 5 6<br />

S.No<br />

Name of the Agroclimatic<br />

zone<br />

Area in<br />

Ha.(<br />

State)<br />

Area in<br />

Ha(<br />

Distt.)<br />

Major crops (2006­07)<br />

b)Area<br />

a)Name<br />

in Ha.<br />

1.<br />

2.<br />

3.<br />

Prehumid<br />

Hyperthermic (foothill)<br />

Thermic Humid(Mid­<br />

Hills & Valley)<br />

Alpine & High Hills<br />

1508928<br />

1410436<br />

.7<br />

986775<br />

Lohit­<br />

62,544<br />

Lohit­<br />

2,60,600<br />

Lohit­<br />

1,56,360<br />

Average<br />

rainfall in<br />

mm<br />

(preceding<br />

4 years<br />

average):<br />

2454.475<br />

Paddy<br />

Maize<br />

Millet<br />

Pulses<br />

Wheat<br />

Oilseeds<br />

Potato<br />

Ginger<br />

10500<br />

8023<br />

90<br />

1669<br />

420<br />

85<br />

80<br />

240<br />

Chillies<br />

Turmeric<br />

225<br />

(Source: Directorate of Agriculture, Naharlagun, Soils of AP by SLUB, Itanagar ,Statistical Abstract of<br />

‐ 13 ‐


Rainfall<br />

AP’2007,Resource Atlas of AP’1999.)<br />

Lohit falls within the range of heavy rainfall as compared to the average of the country. Usually the rain sets in from the<br />

month of March and lasts upto September. The month of December usually escapes rainfall. During January the rainfall is<br />

experienced. In the month of February there is comparatively more rainfall as compared to January. The months of June and July<br />

experience the highest rainfall. In this regard may be noted that 90% of total rainfall is experienced during the monsoon i.e. from<br />

May to September. The rest 10% rainfall is spread over from December to April.<br />

Details of average rainfall and altitude recorded at the District headquarters<br />

1 2 3 4<br />

S.No.<br />

Name of the<br />

District<br />

Average rainfall in<br />

mm (preceding 4<br />

years average)<br />

Altitude ( in m<br />

above sea<br />

level)<br />

1 Lohit(tezu) 2454.47 210<br />

(Source: D.E&S/ C.E., RWD,Itanagar.)<br />

‐ 14 ‐


Chapter 3<br />

Demography and land distribution – an overview<br />

The population of Lohit is 1,25,086 according to 2001 census and is scattered over 2 subdivisions, 5 administrative circles with 5 <strong>CD</strong><br />

Blocks and 223 villages. It has the density of 13 persons per sq. km. The population of the District had a decadal growth rate of 30.8 over<br />

the period 1991­2001. The sex ratio of the district is at 863 females to 1000 males is lower than the state average of 893. The literacy rate<br />

of is 58.7 as per 2001 census against 54.3 of the state. The rural population constitutes about 78.61 % against state average of 79.3 % in<br />

2001 indicating no migration taken place from rural to urban areas. The main reasons for migration observed in the recent past are better<br />

job opportunities, access to educational institutions and health care facilities. The total work force in various categories in the District is<br />

about 38,770 nos as per 1991 & density is 22.79 nos per sq.km with dependency ratio of 3.98 nos non­workers per worker. There are many<br />

distinct tribes inhabiting the area comprising tribes from all 16 districts with Taraon Mishmis, Kaman Mishmis, Singhpos& zakhriangs as<br />

main local inhibitants of the district.<br />

Sl. No. Demographical features<br />

1 Population<br />

1981­District<br />

1981­Wakro<br />

Block<br />

1991­ Distt.<br />

1981­Wakro<br />

block<br />

2001­Distt.<br />

2001­Wakro<br />

‐ 15 ‐<br />

55,047<br />

3319<br />

92,517<br />

4745<br />

1,25,086<br />

6809<br />

2 Per capita availability of land 4.167 Ha.


3 Sex Ratio 863<br />

4 Population age group All ages for Distt :1,25,086<br />

(M­67150 & F­57,936)<br />

All Ages in block6809 (M­<br />

3654 & F­3155).<br />

5 Literacy 58.7<br />

Migration N.A.<br />

6 Work force available in different sectors of Main workers 36,417<br />

economy (1991)<br />

Marginal<br />

Workers<br />

2353<br />

Non­Workers 53,747<br />

Work force<br />

Density<br />

(workers/<br />

sq.km)<br />

22.79<br />

7 ST Population(Census 2001) 40,552<br />

8 BPL: Distt & Wakro 63.16% & 52.46%<br />

9 Landless families NIL but marginal farmers<br />

are available.<br />

(Source: Directorate of Economics & Statistics, Itanagar & Resource Atlas of A.P’1999.)<br />

Land reform measures & Operational land holdings in the disrict :<br />

In Lohit Distric Wakro <strong>CD</strong> Blocks in particular the problem of fragmentation of land holdings is not an issue on account of the<br />

peculiar pattern of land­ownership, tenure and land use prevalent. The ownership of land and the individual rights are governed by<br />

‐ 16 ‐


customary laws of the community. Due to the unique ownership and management system of the Arunachalees, there is little or no alienation<br />

of the people from their land and resources and therefore, even farmers, despite their poor economic condition can be considered resource­<br />

rich. A comparatively low population pressure, high regeneration rate of natural resources, community­based natural resource management<br />

initiatives and projects like the watershed programmes have all further created opportunities for other economic activities to take place and<br />

contribute to the overall development of the district.<br />

The cultivable land is the most valued form of property for its economic and symbolic significance. It is a productive, wealth­creating<br />

and livelihood­sustaining asset. It also provides a sense of identity and rootedness because it has durability and permanence, which no<br />

other asset possesses. Over and above this, the ancestral land has a symbolic meaning, which purchased land does not. Moreover, there<br />

are different rules for devolution of ancestral and self­acquired land. The society is based on patrilineal descent; hence children take their<br />

social identity from their father and are placed in his agnatic group and familial unit. A female child’s membership of her father’s agnatic unit<br />

is neither permanent nor complete. Gender differences in group membership and social identity are closely connected with the patterns of<br />

inheritance and resource distribution. Property is inherited by the male heirs and transmitted through them. They have legal rights in<br />

ancestral property. The women have no share in such inheritance although acquired properties can be gifted to daughters also. It is widely<br />

believed that the daughters after their marriage come under the care of the husband’s clan and family. Largely because of this, in practice,<br />

no landed property was gifted to women although most of the work on the land was done by the womenfolk. In recent times, through the<br />

pioneering initiatives undertaken by few private and official, women are being allowed to own land.<br />

Details of land holding pattern in the district:<br />

Sl. No Name of<br />

district<br />

Type of Farmers (No of Household) Total<br />

No.<br />

‐ 17 ‐<br />

No. of<br />

BPL<br />

Land Holding in Ha


district Large Medium Small Marginal Landless No. BPL<br />

household<br />

Irrigated Rainfed Total<br />

1. Lohit<br />

­<br />

1068<br />

(State)<br />

5076 1244 1033.80 2277.80<br />

Chapter 4<br />

Land Use Pattern<br />

The land ownership and management systems of the Arunachalee are unique and different from the rest of the country, where local<br />

customary laws govern the land. Such laws are tribe­specific where each tribe or even village has its own unique customary laws and<br />

traditions. These customary laws are usually not codified but have the constitutional sanction. The enforcement of these traditional laws and<br />

regulations rests on traditional village’s institutions such as village councils headed by Head Gaon Burah.<br />

In Lohit vast area of land is unclassified and are under the community ownership, which may fall under any one of the recognized<br />

categories­ Private land, Clan land and Common land. The state government owns just remaining area.<br />

Amongst tribe, the land either belongs to the community or individual as custodian. In most community land, all members have a<br />

right to use it freely but with prior consent of the custodians. There are, however, restrictions on transfer or even use of traditional land by<br />

outsiders. Outsiders are people who do not belong to the community or clan. Jhum lands are usually owned by the community/ Clan/private<br />

gifted down by forefaters but regulated by the respective village councils for any dispute on account of boundary/ownership where the<br />

village elders inspect & provide views based on their knowledge of boundary & then village council under Head gam give the final decision<br />

which is allowed under Assam Frontier Regulation Act of 1845 & ratified by the Judiciary.<br />

‐ 18 ‐


There is already increased privatization and individual ownership, especially of land under permanent cultivation such as wet rice<br />

cultivation, terraced lands, orchards, gardens, tree farming, bamboo grooves, etc., in the district. The practices and trends of land<br />

ownership differ largely depend on existing traditions, availability of land and interpersonal relationship with the traditional institutions .<br />

Land Use status in the District :<br />

1<br />

Sl.<br />

No. District<br />

The district has forest cover which may be either under forest Department, individual /clan /Community possession<br />

‐ 19 ‐<br />

(Area in Ha)<br />

2 3 4 5 6 7 8 9 10 11 12 13<br />

Geogr<br />

a­<br />

phical<br />

Area<br />

Lohit 5212<br />

00<br />

Forest<br />

Area<br />

3,20,<br />

777.<br />

32<br />

Land<br />

under<br />

Non­<br />

Agril.<br />

use<br />

616.<br />

556<br />

Total<br />

rainfed(Agri)<br />

area<br />

a)culti<br />

vated<br />

20,7<br />

52.0<br />

7<br />

b)culti<br />

vable<br />

waste<br />

251.2<br />

0<br />

Perm­<br />

anent<br />

pasture<br />

s<br />

340.1<br />

74<br />

Land under<br />

miscellan­<br />

eous tree<br />

crops and<br />

groves<br />

103720.4<br />

6<br />

Current<br />

fallow<br />

Oth<br />

er<br />

fallo<br />

w<br />

2596 35<br />

51<br />

(Source: Statistical Handbook of A.P­2007, Directorate of Economics & Statistics, Itanagar)<br />

Net<br />

sown<br />

area<br />

19,1<br />

63<br />

Net area<br />

sown<br />

more<br />

than once<br />

12,742.<br />

22<br />

Net irrig­<br />

ated<br />

area<br />

14<br />

Gross<br />

croppe<br />

d area<br />

1243 30,95<br />

9


Irrigated areas:<br />

Lohit is basically an agricultural district and all the resources depend upon the agricultural output. Water is evidently<br />

the most vital element in the plant life and is normally supplied to the plants by natural rain. However, the total rainfall in a<br />

particular area may be either inadequate or is ill­timed. Therefore in order to get the maximum yield from a crop, it is<br />

essential to supply optimum quantity of water to the crop and to maintain correct timings of water. This is possible only<br />

through a systematic irrigation system by collective water during rainfall and from natural sources and to release it to the<br />

crops as and when it is needed.<br />

The district does not have major or medium irrigation project . The department of Water Resources Development in the<br />

district has undertaken the Minor Irrigation schemes which are most vital and very suitable for the district. The irrigation<br />

works are mostly meant to divert small hill streamlets to irrigate valleys used for rice cultivation. Most of the villages are<br />

scattered and perched on the hill­top and the cultivators traditionally cultivate the hill slopes either by making terraces or by<br />

jhumming. Irrigation is provided only in terraced fields wherever the facilities exist to bring water from the sources by<br />

gravity system through M.I. Channels. Due to non­availability of well organized irrigation system, a vast area of land both<br />

under forest and jhumlands, which if brought under permanent irrigation, the food grain production in the district could be<br />

raised enormously.<br />

‐ 20 ‐


Irrigation Status (Area in Ha.) :<br />

1<br />

Sl.<br />

No.<br />

A comparative irrigation status of the district & source­ wise area irrigated in the state can be had as under­<br />

2 3 4 5 6 7 8<br />

District<br />

Gross<br />

cultivated<br />

area<br />

Net<br />

cultivated<br />

area<br />

Gross<br />

irrigated<br />

area(Utilised)<br />

‐ 21 ‐<br />

Net irrigated<br />

area(Utilised)<br />

Net<br />

irrigated<br />

%<br />

Area<br />

Rainfed<br />

% of net<br />

cultivated<br />

area<br />

Lohit 33,547.5 12,460.67 8670.9522 2768.211 22.2 3973.30 77.78<br />

(Source: Statistical Abstract of Arunachal Pradesh ‘2007)<br />

Source­wise Area Irrigated (Area in Ha.) :<br />

1<br />

Sl.<br />

No.<br />

2 3 4 5 6 7 8 9<br />

Distri<br />

ct<br />

1. Arunac<br />

hal<br />

Prades<br />

h<br />

Canal<br />

Tanks<br />

Open<br />

wells<br />

Bore wells Lift irrigation<br />

Others (Pl.<br />

specify)<br />

(Area)<br />

No<br />

Are<br />

a<br />

No Area No Area No Area No<br />

Are<br />

a<br />

8735 117 57 24 100 ­ ­ 33336 3558<br />

(8375<br />

nos)<br />

6<br />

(Source: Statistical Abstract of Arunachal Pradesh ‘2007)<br />

Total<br />

No Area<br />

418<br />

52<br />

44478


Common Property Resources (CPR) :<br />

A major strength that Lohit society has inherited is the 'social capital'. There is strong social bonding and community spirit, and<br />

absence of caste and social discrimination. There is no landless household although the major proportion of land is held as either jhum land or<br />

community forestland which is regulated by the owner with village councils. The people have a strong bonding with the social institutions and<br />

resources which occupies the centre­stage of their daily life. The community resources and institutions such as forests, woodlots,<br />

ponds/tanks, community halls, churches, community grounds, Schools, Healthcare units, power, etc., are maintained in each and every<br />

village. The resources and institutions are managed by separate representative committees empowered to lay down rules and regulations for<br />

effective management and development. The resources and institutions are for common use subject to prior consent of the owner within the<br />

ambit of traditional laws and regulations of the respective village/tribe. The Villages under the project ( Wakro, Kathan, Cibi, Tilangkyong,<br />

Old Pukhuri, Towam, Tamiliang & mawai­I) and Assam Frontier Regulation Act’1845 also strive to exploit the traditional administration<br />

abilities of Village Councils for decentralization of developmental responsibilities to the local bodies. As envisaged in the Act, the constitution<br />

of Village Council to take on these responsibilities was formalized. The Village Council in collaboration with the Panchayats & elders formulate<br />

development priorities for the village, prepare action plans and execute them, using the village community or other funds. The Village Council<br />

provide elderly advices to village PRI/leaders in formulation of various developmental works in addition to conflict resolution of any property­<br />

individivual/community,social disputes etc & their decision is final & binding. The PRI is the authority to initiate steps for development works ,<br />

grants­in­aid, matching cash grants, Jawahar Rozgar Yojana, NREGA, and other development and welfare programmes. In many places, the<br />

PRI/Village council’s performance has been exemplary. They have played a pivotal role in creation and maintenance of infrastructure in the<br />

villages– community halls, village roads, schools, water tanks, toilets, granaries, rice mills, community fishery ponds, community wells/tanks,<br />

culverts and suspension bridges, etc. Building on the rich social capital of the village communities and benefiting from this structural linkage,<br />

the Village council member and office bearers of traditional institutions can be involved in IWMP as they would be more devoted compared to<br />

elected/politically affiliated PRI members for pioneering micro­level development in imaginative, culturally appropriate and resource­efficient.<br />

‐ 22 ‐


Details of Common Property Resources in the State ( Area in Ha)<br />

2 3 4 5<br />

Name<br />

of<br />

District<br />

Arunac<br />

hal<br />

Prades<br />

h<br />

CPR particulars<br />

i. Wasteland/<br />

Degraded land<br />

Pvt.<br />

persons<br />

Total area owned/in possession of Area available for treatment<br />

Govt.<br />

(specify<br />

dept.)<br />

PRI Any<br />

other (pl.<br />

specify)<br />

7,27038 0 0 1090557.<br />

00<br />

Pvt.<br />

persons<br />

Govt.<br />

(specify<br />

dept.)<br />

‐ 23 ‐<br />

PRI Any<br />

other (pl.<br />

specify)<br />

727038 0 0 689595<br />

ii. Pastures 0 2056 0 1000 0 0<br />

iii. Orchards 1145 0 0 572 0 0<br />

iv. Village<br />

woodlot<br />

0 0 0 0 0 0 0<br />

v. Forest 1471457 22,49,152 0 1471457 735728 562288 0 70728<br />

vi. Village<br />

ponds/ tanks<br />

vii.<br />

Community<br />

buildings<br />

viii. Weekly<br />

markets<br />

ix. Permanent<br />

markets<br />

2550 0 0 0 0 1550 0 0<br />

2973.6 2478 2478 0 0 0 0<br />

1982.4 0 0 0 0 0<br />

0 0 0 0 0 0 0


x. Temples/<br />

places of<br />

worship<br />

0 0 0 0 0 0 0<br />

xi. Others 0 0 0 13,51,03<br />

2<br />

TOTAL 22,02,19<br />

0<br />

22,54,108 2478 39,15,52<br />

4<br />

1,60,000 0 0 2,76,433<br />

1622766 59410 0 1036756<br />

Details of Common Property Resources in the districts ( Area in Ha)<br />

1 2 3 4 5<br />

Sl.<br />

N<br />

o.<br />

Name<br />

of<br />

District<br />

1 Lohit<br />

CPR particulars<br />

i. Wasteland/<br />

Degraded land<br />

Pvt.<br />

persons<br />

Total area owned/in possession of Area available for treatment<br />

Govt.<br />

(specify<br />

dept.)<br />

PRI Any other<br />

(pl.<br />

specify)<br />

Pvt.<br />

persons<br />

23,188.04 25188.04 23,188.0<br />

4<br />

Govt.<br />

(specify<br />

dept.)<br />

‐ 24 ‐<br />

PRI Any<br />

other<br />

(pl.<br />

specify)<br />

15,600<br />

ii. Pastures 45,188.04 22,000 20,000 32000 11,550 14,660<br />

iii. Orchards 300 408.832<br />

iv. Village<br />

woodlot<br />

25,008 20,180.04 13,636


v. Forest 46,647.4 46,647.4 46,647.4<br />

vi. Village<br />

ponds/ tanks<br />

vii.<br />

Community<br />

buildings<br />

viii. Weekly<br />

markets<br />

ix. Permanent<br />

markets<br />

x. Temples/<br />

places of<br />

worship<br />

24,190.72 10,190.72 20,190<br />

17095.36 17095.36 15000<br />

34,190.7<br />

2<br />

24,190.72 10,000<br />

34,190.7<br />

2<br />

xi. Others 18,721.44. 4002.8 44,561.1 70809.0<br />

48<br />

Chapter 5<br />

Trends in agriculture and food productivity<br />

Lohit is an agricultural state. Agriculture falls in the priority sector in the district. Agriculture has traditionally been<br />

and continue to be the mainstay of the inhabitants. The numerous festivals are centered around agriculture and have their<br />

roots in cultivation practices. More than 80 % percent of the people are engaged in agriculture. Rice is the staple food. It<br />

‐ 25 ‐


occupies about 55.5 percent of the total cultivated area and constitutes about 75 percent of the total food grain production.<br />

Other crops include maize, Wheat, Milllet, linseed, potato, pulses, soyabean, sugarcane, jute, Ginger, Turmeric, chilly, etc.<br />

However, it is not self­sufficient in food and still depends on the import of food supplies from other states.<br />

Agriculture is one of the significant contributors to the net district domestic product and is the largest employer of the<br />

workforce. It was the mainstay of the people of during 1950s, when almost 96.5 percent of the population was dependent<br />

on agriculture which has come down to 60.36 % during 1991 of the state. Though the dependency for employment on<br />

agriculture has declined it continues to be the main source of livelihood. Shifting and terrace cultivations remain the<br />

dominant forms of land use practice.<br />

The widespread practice of Shifting/Jhum cultivation have caused the fallow, or idle period to be cut to a couple of<br />

years which has led to soil erosion and loss of soil fertility. Shifting cultivation covers over 50.03 percent of the total arable<br />

area of the State. It is concentrated in all the districts of the State except Tawang. In other areas, terraced rice cultivation<br />

(TRC) or combined Jhum and TRC are practiced in a limited scale. The food grain production in District has shown an<br />

upward trend with 39,826 MT in 2006­2007 with 1923.775 kg per hectare as against 604153 MT with 1612.2 kg /<br />

hectare of the state. Non­traditional crops such as barley, spices, rubber are also gaining popularity in recent years,<br />

promising to convert agriculture from subsistence farming to commercially viable activity.<br />

The land is extremely fertile and can produce the best quality of agro­based, horticulture and floriculture products<br />

through organic farming. The potential of the district becoming an ‘organic state’, and for exports and foreign exchange, is<br />

real. Strategic initiatives in the fields of animal husbandry, fishery and sericulture could result in generation of resources and<br />

overall development of the rural economy.<br />

The major cash crops in the district are paddy,maize,millet,pulses, oilseeds, potato, ginger, chilly. The marketing of<br />

the cash crops are through local markets, entrepreneurs and APMCs in the state.<br />

Crop production and productivity :<br />

1. 2 3 4 5 6<br />

Sl. Name of Name of Kharif Rabi Zaid<br />

‐ 26 ‐


No. the District. crops<br />

Area<br />

(ha)<br />

Average<br />

Yield (Qtl)<br />

per ha.<br />

Total<br />

Production<br />

(Qtl)<br />

‐ 27 ‐<br />

Area<br />

(ha)<br />

Average<br />

Yield per<br />

ha (qtl)<br />

Total<br />

production<br />

(qtl)<br />

Area<br />

(ha)<br />

Average<br />

Yield per<br />

ha (qtl)<br />

Total<br />

producti<br />

on (qtl)<br />

Irri Rf. Irri Rf. Irri Rf. Irri Rf. Irri Rf. Irri Rf. Irri Rf. Irri Rf. Irri Rf.<br />

1 Lohit Rice 10500 24.30 25515<br />

2 Wheat<br />

3 Pulses 1669 13.34 2228<br />

4 Maize 8023 13.98 11,221<br />

5 Millet 90 10 90<br />

6 Tur<br />

7 Potato 80 91.50 400<br />

8 Oil seed 85 8.73 50<br />

9 Ginger 240 91.50 1200<br />

10 Chillies 225 15.50 112<br />

11<br />

Sugarcane<br />

(Source: Details of 2006­07 as per Statistical Abstract of Arunachal Pradesh­2007, Directorate of Economics & Statistics<br />

,Itanagar)<br />

Chapter 6<br />

Implementation of watershed programmes in the District at present<br />

a). Administrative structure for implementing watershed programmes in the District.


The Nodal agency for implementation of IWDP in the District level is headed by DC­cum­CEO with Project Director,<br />

DRDA assisted by Assistant Project Officers, Technical Assistants and other staffs. PIA is the BDO, <strong>CD</strong> Block assisted by<br />

Watershed Development Team Members.<br />

Watershed programmes of other Ministries are implemented by other line departments such as NWDPRA & WDPSCA.<br />

b). Area covered under watershed programmes in the District:<br />

Under IWDP, a total of 05 projects have been sanctioned so far by GOI covering 15 villages across 5 Blocks covering<br />

a total watershed area of 24,300 Ha.<br />

Status of district area covered under the watershed programme (ha)<br />

1 2 3 4<br />

Micro­watersheds covered so far<br />

5<br />

Sl.<br />

No.<br />

Name of<br />

district<br />

Total microwatersheds<br />

in the<br />

District<br />

Dept. of Land<br />

Resources<br />

Pre­IWMP projects<br />

(DPAP +DDP +IWDP)<br />

Other Ministries/<br />

Depts.<br />

Any other watershed<br />

project<br />

Total<br />

watersheds<br />

covered<br />

Net watersheds to<br />

be covered<br />

1. Lohit 530 3,97,115.23<br />

No. Area (ha.) No. Area (ha.) No. Area (ha.) No.<br />

IWDP­5<br />

Projects 24,300<br />

NWDPRA<br />

:<br />

9 nos<br />

(IX,X<br />

&XIth<br />

Plan)<br />

WDPSCA:<br />

‐ 28 ‐<br />

4500<br />

NIL<br />

15+<br />

9=2<br />

4<br />

Area<br />

(ha.)<br />

24300+4<br />

500=28,8<br />

00<br />

No. Area (ha.)<br />

530­<br />

24=5<br />

06<br />

3,97,115.23<br />

­<br />

28,800=3,6<br />

8,315.23


NIL nos Total­<br />

4500<br />

(Note: The area delineated is less than the total geographical area as watershed boundaries cover less areas of<br />

districts)<br />

Details regarding the watershed projects sanctioned by DoLR in the district:<br />

1 2 3 4<br />

S.No. Item Total<br />

DPAP<br />

Pre­IWMP scheme details<br />

DDP IWDP<br />

1 Area sanctioned in ha. (as per<br />

column 4 of DoLR area in ha.)<br />

24,300 24,300<br />

2 Names of the District covered 1 Lohit<br />

3 No. of Blocks covered 05 05 (Wakro,Lekang,<br />

4 No. of watershed projects sanctioned<br />

by DoLR<br />

05<br />

Chowkham,Namsai & Tezu)<br />

05 nos<br />

5 No. of projects completed out of<br />

those taken at Row (4)<br />

NIL<br />

6 No. of projects foreclosed of Row (4) NIL<br />

7 No. of on­going projects of Row (4) 13 13 nos<br />

8 Area already treated by completed<br />

projects of Row (5)<br />

NIL NIL<br />

9 Area for treatment by on­going<br />

projects of Row (5)<br />

24,300 24,300 ha<br />

10 Total area treated and under 24,300+4500=28,800 24,300(IWDP)+4500(NWDPRA<br />

treatment (8)+ (9)<br />

& WPSCA)<br />

‐ 29 ‐


11 Area yet to be treated and proposed<br />

to be treated by DoLR<br />

(column 1­column 10)<br />

NIL NIL<br />

Details of the watershed projects implemented in the Distric with the financial assistance other than DoLR<br />

1 2 3 4<br />

Watershed schemes of other Ministries<br />

S.<br />

No<br />

Item Total<br />

Ministry<br />

of<br />

Agricultur<br />

e GoI<br />

Ministry<br />

of E &<br />

F, GoI<br />

Planning<br />

Commission<br />

NABAR<br />

D<br />

State<br />

Govt. EAP<br />

#Others<br />

(Pl.<br />

Specify)<br />

1 Area sanctioned in ha. 4500 NWDPRA<br />

WDPSCA<br />

NA NIL NIL NIL NIL NIL<br />

2 Names of the districts covered 05 05<br />

3 No. of Blocks covered 05 05<br />

4 No. of watershed projects 09 09<br />

5<br />

sanctioned other than DoLR<br />

No. of projects completed out of<br />

those taken at Row (4)<br />

09 09<br />

6 No. of projects foreclosed of Row<br />

(4)<br />

­ ­<br />

7 No. of on­going projects of Row<br />

(4)<br />

NIL NIL<br />

8 Area already treated by 4500 4500<br />

9<br />

completed projects of Row (5)<br />

Area for treatment by on­going<br />

projects of Row (5)<br />

10 Total area treated and under<br />

treatment (8)+ (9)<br />

4500 4500<br />

11 Area yet to be treated and<br />

proposed to be treated by other<br />

than DoLR resources<br />

NA NA<br />

‐ 30 ‐


S.<br />

No.<br />

(column 1­column 10)<br />

Details of pending UCs of the District as on 11/2009 :<br />

1 2 3 4 5 6 7 8 9 10 11<br />

District Project<br />

Instl<br />

l no.<br />

Financi<br />

al year<br />

of<br />

release<br />

of fund<br />

Amount<br />

release<br />

d (Rs.<br />

in lakh)<br />

Amount<br />

utilized<br />

(Rs.in<br />

lakhs)<br />

‐ 31 ‐<br />

Submission of<br />

UC<br />

Due<br />

date<br />

Amount<br />

(Rs. in<br />

lakhs)<br />

Date of<br />

submission of<br />

UC<br />

Date<br />

Amou<br />

nt<br />

(Rs. in<br />

lakhs)<br />

Reasons for<br />

not<br />

submitting/<br />

delayed<br />

submission of<br />

UC<br />

Pending UCs<br />

1 Lohit Lohit­III 2 07­08 97.97 MTE entrusted 07­08 97.97<br />

2 Lohit Lohit­IV 2 07­08 32.82 MTE entrusted 07­08 32.82<br />

3 Lohit Lohit­V 2 07­08 65.81 MTE entrusted 07­08 65.81<br />

4 Lohit Lohit­VII 2 07­08 65.81 MTE entrusted 07­08 65.81<br />

Period<br />

Amo<br />

unt<br />

(Rs.<br />

in<br />

lakhs<br />

)


Details of Unspent balance as on Sept’ 2009 :<br />

S. No. District Project<br />

( Financial figures indicate cumulative releases made)<br />

Instal­<br />

ment no.<br />

Financial year of<br />

release of fund (<br />

latest release)<br />

‐ 32 ‐<br />

Amount<br />

released<br />

(Rs. in<br />

lakh)<br />

Amount<br />

utilized<br />

(Rs.in lakhs)<br />

Unutilised<br />

funds (Rs. In<br />

lakhs)<br />

1 Lohit Lohit­I 08­09 269.56 261.94 7.62<br />

2 Lohit Lohit ­ III 07­08 147.47 143.29 4.18<br />

3 Lohit Lohit­IV 07­08 49.32 45.28 4.04<br />

4 Lohit Lohit ­ V 08­09 98.81 95.9 2.91<br />

5 Lohit Lohit­ VI 08­09 98.81 95.83 2.98<br />

6 Lohit Lohit ­ VII 07­08 98.81 89.91 8.90


Chapter 7<br />

Strategy for implementation of Integrated Watershed Management Programme :<br />

(IWMP)<br />

a) Prioritization of available area based on the criteria as per the Operational Guidelines of DoLR<br />

Micro­watershed delineation of Lohit District gave rise to total watershed area of 3,97,115.23 ha with<br />

530 nos of micro­watersheds ( MWS) which ranged from micro­watershed areas in hectares of > 500,<br />

>500100015002000 ha respectively.<br />

Based on the parameters envisaged in the guideline for implementation of Integrated Watershed Management<br />

Programme (IWMP), the available watersheds of the district were ranked according to priority. For determining the<br />

parameters, peoples participation, Scope for developing Water Harvesting Structures (WHS), availability of work<br />

force, numbers of people living Below Poverty Lines, Prevalence of wastelands, common land and Jhum lands and<br />

Jhumians etc. were taken into consideration.<br />

The net area available for treatment in the district is 2,45,811.9 ha and proposed accordingly for implementation<br />

under IWMP in the next 18 years in the State Perspective & Strategic Plan ( SPSP) duly approved by DOLR, GOI is shown<br />

as under :<br />

‐ 33 ‐


Sl.no Plan wise treatment to be<br />

taken up as per SPSP<br />

approved .<br />

1 XI Plan (2009­2010 to 2011­<br />

2012)<br />

2 XII Plan (2012­2013 to 2016­<br />

2017)<br />

3 XIII Plan(2017­2018 to 2021 ­<br />

2022)<br />

Area to be<br />

treated (ha).<br />

51,200<br />

‐ 34 ‐<br />

Remarks<br />

Block wise<br />

proposal for<br />

treatment<br />

available in<br />

the<br />

watershed<br />

map<br />

enclosed.<br />

76,800 ­do­<br />

72,192 ­do­<br />

4 XIV (2022­2023 to 2026­2027) 45,619.9 ­do­<br />

Total for 18 years 2,45,811.9<br />

Out of 14,999 ha finalized & submitted for sanction during 2009­2010 at 2 nos of <strong>CD</strong> Block under the district same ,<br />

i.e.,14,999 ha (9955 ha at Wakro & 5044 ha under Namsai <strong>CD</strong> Block ) has been allowed for sanction in the<br />

Steering Committee Meeting Dated 28/10/2009 conducted at DOLR, GOI. The Steering Committee has reasoned non­<br />

performance (delay in implementation, UCs not forth coming, need of closing pre­hariyali dormant projects etc) of the<br />

DRDAs in the State as the obstacles in allowing more projects. The SLNA has sanctioned the project vide NO.SLNA / ITA /01


Dated 05/11/2009 based on Minutes of the Eight Meeting of the Steering Committee on IWMP held on 28/10/2009<br />

circulated vide NO.Z­11011/23/2009­PPC Dated 03/11/2009 ( copies enclosed ) .<br />

The sanctioned project gives scopes of treatment of 12 nos of MWS (watershed polygon nos­<br />

4149,4150,4168,4178,4193,4194,4212,4214,4228,4233,4241,4248) as indicated in the watershed map enclosed &<br />

strictly as per work­plan & activities identified as annexed in the DPR. The activities are to be concentrated on compact basis<br />

at Wakro, Kathan, Cibi, Tilangkyong, Old Pukhuri, Towam, Tamiliang & mawai­I. Nature of activities to be for<br />

common use of people for income /employment generation of landowner & people also. The lists of SHGs & UGs are given<br />

in this DPR. The latitudes­Longitude project sites are to be taken by the GPS instrument as a data base & deterrent to<br />

manipulation at the time of implementation­which will commensurate to the identified areas & to be exercised in the<br />

presence of Watershed Committee & it’s Secretary with WDT representative. As the implementation will take place at<br />

cluster, the tentative areas (as watershed polygon areas may not conform) & costs thereof will be 9955 ha respectively<br />

with expenditure accordingly.<br />

The watersheds have been rationally & logically ranked in order of priority based on the parameters envisaged<br />

in the Common Programme Guidelines. For the hilly states in the NER, shifting cultivation is predominant. As the<br />

programme is meant for such areas, it also becomes a determining technical parameter for prioritization. Thirteen<br />

parameters have been formulated and weight ages are also conceptualized as hereunder­<br />

‐ 35 ‐


Prioritized list of projects proposed for sanction during the financial year 09­10*<br />

1 2 3 4 5 6 7 8<br />

S.<br />

o.<br />

Weightage under the criteria#<br />

District<br />

Name<br />

of the<br />

project<br />

No. of<br />

microwatersheds<br />

proposed<br />

to be<br />

covered<br />

Proposed<br />

project<br />

area (ha)<br />

Type of<br />

project<br />

(Hilly/<br />

Desert/<br />

Others)<br />

Proposed<br />

cost (Rs.<br />

In lakh) i ii iii<br />

i<br />

vii<br />

v vi vii ix x<br />

v i<br />

x<br />

xii<br />

i<br />

xii<br />

i<br />

Total<br />

. Lohit IWMP­ 12 nos Wakro, Hilly:9955 1493.25 7.5 10 5 5 0 0 5 5 15 10 0 5 10 77.5<br />

I ­<br />

Kathan,<br />

wakro<br />

Cibi<br />

<strong>CD</strong><br />

Tilang<br />

Block<br />

Kyong,<br />

Old<br />

Pukhuri,<br />

Towam,<br />

Lamliang<br />

& Mawai­<br />

I:<br />

‐ 36 ‐


# Criteria and weightage for selection of watershed<br />

S.<br />

No<br />

Criteria<br />

.<br />

i Poverty index (% of poor<br />

to population)<br />

Maximum<br />

score<br />

‐ 37 ‐<br />

Ranges & scores<br />

10 Above 80 % (10) 80 to 50 % (7.5) 50 to 20 % (5) Below 20<br />

% (2.5)<br />

ii % of SC/ ST population 10 More than 40 % (10) 20 to 40 % (5) Less than 20 % (3)<br />

iii Actual wages 5 Actual wages are<br />

significantly lower than<br />

minimum wages (5)<br />

Actual wages are<br />

equal to or higher<br />

than minimum wages<br />

(0)<br />

iv % of small and marginal<br />

farmers<br />

10 More than 80 % (10) 50 to 80 % (5) Less than 50 % (3)<br />

v Ground water status 5 Over exploited (5) Critical (3) Sub critical (2) Safe (0)<br />

vi Moisture index/<br />

15 ­66.7 & below (15) ­33.3 to ­66.6 (10) 0 to ­33.2 (0)<br />

DPAP/ DDP Block<br />

DDP Block<br />

DPAP Block<br />

Non DPAP/ DDP Block<br />

vii Area under rain­fed<br />

15 More than 90 % (15) 80 to 90 % (10) 70 to 80% (5) Above 70<br />

agriculture<br />

% (Reject)<br />

viii Drinking water 10 No source (10) Problematic village Partially covered (5) Fully<br />

(7.5)<br />

covered<br />

(0)<br />

ix Degraded land 15 High – above 20 % (15) Medium – 10 to 20 % Low­ less than 10 %<br />

(10)<br />

of TGA (5)<br />

x Productivity potential of 15 Lands with low<br />

Lands with moderate Lands with high<br />

the land<br />

production & where production & where production & where<br />

productivity can be productivity can be productivity can be<br />

significantly enhanced enhanced with marginally enhanced<br />

with reasonable efforts reasonable efforts (10) with reasonable<br />

(15)<br />

efforts (5)<br />

xi Contiguity to another 10 Contiguous to previously Contiguity within the Neither contiguous to


watershed that has<br />

already been developed/<br />

treated<br />

xii Cluster approach in the<br />

plains (more than one<br />

contiguous micro­<br />

watersheds in the project)<br />

Cluster approach in the<br />

hills (more than one<br />

contiguous micro­<br />

watersheds in the project)<br />

treated watershed &<br />

contiguity within the<br />

microwatersheds in the<br />

project (10)<br />

15 Above 6 micro­<br />

watersheds in cluster<br />

(15)<br />

Above 5 micro­<br />

watersheds in cluster<br />

(15)<br />

‐ 38 ‐<br />

microwatersheds in<br />

the project but non<br />

contiguous to<br />

previously treated<br />

watershed (5)<br />

4 to 6<br />

microwatersheds in<br />

cluster (10)<br />

3 to 5<br />

microwatersheds in<br />

cluster (10)<br />

previously treated<br />

watershed nor<br />

contiguity within the<br />

microwatersheds in<br />

the project (0)<br />

2 to 4<br />

microwatersheds in<br />

cluster (5)<br />

2 to 3<br />

microwatersheds in<br />

cluster (5)


For assigning the weightages under different parameters for different projects quantitative data already compiled and<br />

tabulated in the previous chapters qualitative information provided by project implementation agencies and also obtained<br />

from local enquiries are used rationally and carefully.<br />

The status with regard to peoples’ participation and contribution are decided based on the present situation in Hariyali<br />

projects as well as other projects implemented in the village areas. Scope for water harvesting is decided from the stream<br />

network, flow available in the streams as well as feed back given by the WDTs of the project implementation agencies. The<br />

availability of safe drinking water to the concerned watershed community has been assessed from the data base of PHE<br />

Department and general views of the District Administrations and traditional institutions.<br />

The Census of India 2001 is utilized to know the workers population, agricultural labours and an understanding about<br />

the poverty level was made using such census data .<br />

Wasteland statistics is taken as the base for grading the watersheds which is amply explained and also provided in<br />

tables in the earlier chapters. Similarly the settlement areas mapped during wasteland survey was used to give weight ages.<br />

The wage rate in specific locations of the district is considered as per the information’s provided by the project<br />

implementing agencies, district authority and the local people. Need for wage employment is assessed from the above<br />

informations. The wage rate prevailing in some of the villages are Rs.80/­ to 90/­ for easy & tough places.<br />

The jhum area both current and abandoned is available in terms of hectares within the project boundaries. The<br />

weightages given linearly proportionate the area under jhuming. Scope for weaving away of jhumias from jhuming was<br />

given as feed back by the W<strong>CD</strong>C, DRDA,Tezu/PIA (BDO,Wakro <strong>CD</strong> Block) and these informations are used for<br />

assigning weight ages corresponding to the parameters.These information which are both quantitative and qualitative have<br />

been used for assigning the weight ages for different projects.<br />

‐ 39 ‐


S.No<br />

District<br />

1. Lohit<br />

Plan­wise phasing of physical (area in ha)<br />

& financial (Rs. in Crore) targets of IWMP for next 18 years<br />

Remaining period<br />

of XI Plan<br />

(2009­10 to 2011­<br />

12)<br />

XII Plan<br />

(2012­13 to<br />

2016­17)<br />

‐ 40 ‐<br />

XIII Plan<br />

(2017­18 to<br />

2021­22)<br />

XIV Plan<br />

(2022­23<br />

to 2026­<br />

27)<br />

Total for 18<br />

years<br />

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.<br />

51200 73.728 76800<br />

110.<br />

592 72192<br />

103.<br />

9565<br />

Year­wise phasing of physical (area in ha) &<br />

45619<br />

.9<br />

65.6<br />

926<br />

6<br />

24581<br />

1.9<br />

financial (Rs. in lakh) targets of IWMP for remaining period of XI Plan<br />

1 2 3<br />

Remaining period of XI Plan<br />

2009­10 2010­11 2011­12 Total<br />

Phy. Fin. Phy. Fin. Phy. Fin. Phy.<br />

S.<br />

No District<br />

1. Lohit<br />

No. of<br />

projects<br />

H&<br />

D<br />

Area<br />

O H&D O<br />

2 1 14000<br />

1<br />

0<br />

0<br />

No. of<br />

project<br />

s<br />

H<br />

Area<br />

&<br />

D<br />

O H&D O<br />

2220 2 2<br />

810<br />

0<br />

81<br />

00<br />

No. of<br />

projects<br />

Area<br />

H&D O H&D O<br />

218<br />

7 4 1<br />

160<br />

00<br />

40<br />

00<br />

No. of<br />

projects<br />

H&<br />

D<br />

288<br />

0 8 4<br />

353.<br />

9691<br />

Area<br />

O H&D O<br />

3810<br />

0<br />

Fin.<br />

13<br />

10<br />

0 7287


H&D­ Hilly & Difficult area; O­ Others<br />

0<br />

Details of Lohit and category‐wise<br />

area proposed to be taken up under IWMP during next 3 years i.e upto 11 th Five Year Plan.<br />

1 2 3 4 5 6<br />

S. No. District<br />

1. Lohit<br />

Year<br />

(2009 to<br />

2012)<br />

Total area<br />

available<br />

for<br />

treatment<br />

Total area<br />

proposed to take<br />

up under IWMP in<br />

the next 3 years<br />

60200 60200 41100<br />

‐ 41 ‐<br />

(Area in Ha.)<br />

Terrain of the proposed area Land use type of proposed area<br />

Hilly Desert<br />

Others<br />

(Pl.<br />

specify)<br />

cultivated<br />

rainfed area<br />

NIL 19100(P<br />

lain) 60200<br />

7<br />

Uncultivated<br />

Wasteland<br />

NIL


Details of Papum Pare and category­wise area<br />

proposed to be taken up under IWMP during next 3 years i.e upto 11 th Five Year Plan.<br />

‐ 42 ‐<br />

( Area in ha)<br />

8 9 10<br />

Ownership pattern of the proposed area No. of beneficiaries covered<br />

Identified DPAP/ DDP Blocks<br />

covered<br />

Private Commu­<br />

nity<br />

17766 95256.0<br />

0<br />

Forest<br />

24180<br />

0.00<br />

Others<br />

(pl.<br />

specify)<br />

Total<br />

area<br />

MF SF LF<br />

35178.00 39000<br />

0 560 749 211<br />

( Ref: Statistical abstract of AP’2007)<br />

Land<br />

less<br />

Total<br />

DPAP<br />

No. of<br />

Area<br />

blocks<br />

DDP<br />

No. of<br />

Area<br />

blocks<br />

NIL 3991 NIL NIL NIL NIL


Public ­ Private Partnership :<br />

Economic growth and human development are interlinked. Lohit by focusing on economic growth can expect to reap benefits through increased levels<br />

of income, employment generation and reduction in economic disparities within the different regions of the district and the populace. Government’s role in<br />

making the investments cannot be understated but the limited availability of financial resources with the Government necessitates that private investment,<br />

both from within and outside the State, is encouraged. Harnessing of the resources and potentials of watershed programme require not only investments but<br />

also policy interventions to encourage such investments.<br />

Out of the total geographical area of the district of 521200 Ha, about 1,80,752.16 Ha is degraded and 32,604.31 Ha is rain fed arable land. This<br />

includes degraded land not only under private ownership, but also with the clans. All these lands are prioritized for development projects under Integrated<br />

Watershed Management Programme (IWMP).<br />

The watershed area to be covered under IWMP programme is not sufficient to meet the required treatment demand of the district. The degraded areas<br />

which require immediate intervention for treatment cannot be executed by government alone within the plan period; therefore, innovative strategic planning is<br />

initiated with the simultaneous involvement of both government and private agencies. The integration of government and private agencies will results into<br />

maximum area coverage within plan period with substantial development in the micro­watershed.<br />

The W<strong>CD</strong>C under DRDA,Tezu & PIA (BDO, wakro) & Watershed Committee under the guidance of SLNA will initiate public private partnership<br />

with private business houses with considerable expertise related to watershed development projects. The W<strong>CD</strong>C, DRDA (on advice of SLNA) and the private<br />

agencies can enter into agreement through a legally enforceable Memorandum of Understanding (MoU) between the partners with clear entitlements and<br />

obligations of each partner. The private agencies with better access to marketing and financial institution can play vital role in technological inputs and<br />

scientific planning with their long time tested experience in project management.<br />

Lack of marketing linkages has been one of the key disincentives to farmers in producing surplus. The private agencies can formulate marketing strategy<br />

to source out the products from the watershed areas to prospective markets, creating avenue for residual income.<br />

Watershed Committee (WC) formed in the micro­watershed villages can be sensitized to implement the proposed projects and encourage for optimum<br />

utilization and management of resources in a sustainable manner.


However, the caution to be exercised while embarking on the path of economic development is to ensure that the resources available are used<br />

efficiently and in a sustainable and planned manner for equitable economic growth within a reasonable time­frame of 4 years which can be extended to a<br />

maximum period of 7 years subject to implementation as per provisions made in this DPR without any change once approved by SLNA.<br />

Planning Process ­ Details of Scientific criteria/Inputs used in Planning<br />

(A) PLANNING<br />

Cluster approach:<br />

A cluster of 12 nos of MWS (watershed polygon nos3358,3361, 7923,7936,7941,7948,7952 & 7958 ) totaling to an area 9955 hectare<br />

as indicated in the watershed map enclosed has been earmarked for treatment under thre project. This cluster of watershed area are identified as per the land<br />

capability, classification for undertaking various activities such as afforestation; horticulture development, soil & water conservation measures, WHS, Livelihood<br />

component & so on. The approach taken is on sustainability mode and not project oriented.<br />

Technical Back­stopping:<br />

The process of planning and management of micro­watershed activities are implemented with the technical inputs from renowned institutions.<br />

Institutions providing technical supports are SIRD,Itanagar, ICAR,Basar, NERIST,Nirjuli, NESAC, Megalaya ,NIRD, Guwahati,KVK, Itanagar,KVIC,<br />

Itanagar,District Industrial Training Centre, Tezu etc.<br />

Baseline Survey:<br />

‐ 44 ‐


In all the micro­watersheds, survey were conducted by the WDTs on demography, livelihood patterns, economic activities, major agricultural crops, soil<br />

types, climates and natural vegetations. The indigenous technical knowledge’s will be incorporated with modern technology in the process of planning and<br />

management.<br />

Hydro­geological survey:<br />

Hydro­geologically, the district is underlain by unconsolidated and semi­consolidated formations ranging in age from Upper Cretaceous to Recent. Some<br />

ofl the micro­watersheds in the project are situated on plain areas & some on hill tops, the ground water resources cannot be tapped for various use. The<br />

main source of water is from rainwater and few perennial and seasonal rivers. The rainwater is harnessed for use by constructing water harvesting structures,<br />

which serves as source for both drinking and recharging groundwater. The water from perennial and seasonal rivers is use for minor irrigation by cutting<br />

channels through the ridges. Mechanism of harvesting water by mini storage tanks will be explored under the project.<br />

Contour mapping:<br />

Contour mapping will be done for all the Watershed areas as identified for implementation with the help of theodolite and dumpy level equipments. All<br />

the activities of the watershed will be carried out as per the contour mapping.<br />

Participatory Net Planning (PNP):<br />

Work Plan for IWMP is prepared on the basis of information generated from the baseline survey of the watershed areas and detailed PRA exercise.<br />

Assessment of needs of the watershed areas and the wishes and aspirations of the farmers/ village communities are taken into account. This programme being<br />

a bottom up planning is carried out in consultation with the village authority, Watershed Committee, Village Council and Watershed Association. While keeping<br />

in mind to adhere to the guidelines, in certain cases the need arose to exercise flexibility and adaptability to the local conditions, needs and social structure.<br />

Remote sensing data­especially soil/ crop/ run­off cover:<br />

‐ 45 ‐


The remote sensing data on all the aspects of micro­watershed planning will be sourced from North East Space Application Centre (NESAC), Shillong,<br />

SRSAC, Itanagar & under technical guidance of Indian Institute of Technology, New Delhi.<br />

Ridge to Valley treatment:<br />

Ridge to valley treatment approach proposed to be designed with the help of contour mapping and identification according to land capability<br />

classification. The top steep slopes will be treated with different tree species for both protective and productive purposes (afforestation) horticultural and<br />

fodder crops in the middle areas with contour bundings and half moon terraces and in the valley the land shall be developed for permanent farming of cereal<br />

crops and other perennial crops on a sustainable basis.<br />

Online IT connectivity:<br />

The SLNA will maintain IT cell through NIC which is in direct online connectivity with the Ministry of RD, GOI and the PIA/W<strong>CD</strong>C in all the district<br />

headquarters through CIC. Regular monitoring of the projects and effective dissemination of information to the PIA/DWDUs through high speed<br />

Intranet/internet access and e­mail including proposal of uninterrupted connectivity through V­Set.<br />

Availability of GIS layers:<br />

The GIS maps of cadastral, village boundaries, drainage, soil, land use, ground water status, and watershed boundaries of all micro­watersheds were all<br />

sourced from GIS/Remote Sensing Application Centre, Govt. of Arunachal Pradesh, Itanagar, IIT Delhi, NESAC,Megalaya.<br />

(B) INPUTS<br />

Bio­pesticides:<br />

Locally available Bio­pesticide plants like neem, tobacco and chilly,Cucumber, ginger will be promoted along with Synthetic bio­pesticides such as<br />

nicotine, pyrethrum and rotenone and discourage the indiscriminate use of inorganic fertilizers and pesticides.<br />

‐ 46 ‐


Organic manures:<br />

The organic manure is derived from biological sources like plant, animal and human residues. It includes FYM, compost and Green<br />

manure. Some of the commonly use plants to prepare organic manures are sunhemp, dhaincha, cow pea, etc., and concentrated manures<br />

are also prepared from oilcakes, blood meal, fishmeal, meat meal and horn and hoof meal. The stakeholders shall be encouraged to use<br />

organic manures prepared locally as well as externally to generate organic farm produce.<br />

Vermicompost:<br />

It is organic manure produced by the activity of earthworms. It is a method of making compost with the use of earthworms that<br />

generally live in soil, eat biomass and excrete it in digested form. A vermicompost unit in every micro­watershed shall be established to<br />

encourage organic farming.<br />

Bio­fertilizer:<br />

Bio­fertilizers like rhizobium, aztobacter, azospirillium, azolla and mycorhizae will be utilized wherever needed.<br />

Water saving devices:<br />

Water saving devices such as agri­film/polythene, check dam, farm pond, gully plug, dry stone pitching, etc., will be employed according to the location<br />

and site of the watershed areas.<br />

Mechanized tools/ implements:<br />

Mechanized tools/implements shall be used to enhance the value of the farm produce and also to improve the efficiency and productivity of the land.<br />

The following tools like ginger, turmeric, chilly grinder, cardamom dryer, sugarcane crusher, power tiller, pumping set, etc.<br />

‐ 47 ‐


Bio­fencing:<br />

Agave Erythrina, Thysanolaena maxima, Euphorbia nerifolia, Hisbiscus rosa­sinensis, Lantana camara, etc.<br />

Nutrient budgeting:<br />

Deficiency of macro and micro nutrients shall be analyzed and supplemented by application of macro nutrients like NPK. and other essential nutrients.<br />

Automatic water level recorders & sediment samplers:<br />

District department of Irrigation & Flood Control shall be responsible for undertaking automatic water level recording and sediment sampling. The SLNA<br />

will also make it’s arrangement of rainfall gauging at state HQ.<br />

Chapter 8<br />

Livelihood concerns:<br />

Agriculture has traditionally been and continues to be the main source of livelihood of Lohit life. It is one of the significant contributors to the net<br />

district domestic product and is the largest employer of the workforce in the district. Majority of the total workforce in the district are engaged in agricultural<br />

activities. Rearing of livestocks like cattle, poultry, and piggery is another important livelihood. Traditional cottage industries like weaving, carpentry,<br />

handicrafts and blacksmith are also taken up.<br />

‐ 48 ‐


The district is not self sufficient in production of food grains which is managed through supply of Rice & Wheat by FCI & distributed by Airfed & road<br />

distribution centres. Non­traditional crops such as spices &rubber and sugarcane are also gaining popularity in recent years, promising to convert agriculture<br />

from subsistence farming to commercially viable activity. The land is extremely fertile and can produce the best quality of agro­based, horticulture and<br />

floriculture products through organic farming.<br />

Alike other district of Arunachal Pradesh it has followed the practice of raising crops under organic conditions since time immemorial. In the context of<br />

the globalization of agriculture, organic products have higher market value & the district is in a unique position to take advantage of this.<br />

Lohit has a highly congenial agro­climatic condition for cultivation of a wide range of fruits, vegetables, plantation crops and flowers. The area under<br />

horticulture is 3.526 % of the total cropped area. Among the commercial crops, nearly 11.64 % of the area is occupied by Oilseeds, Potato with 10.95%,<br />

Ginger (32.87 %) & Chillies (30.82%) as per 2006­07 are the major spices grown. Meanwhile, it has been estimated that the district imports 60% to<br />

70% of the vegetable requirements. Systematic harnessing of this environment for growing high value crops will open up new dimensions for improving the<br />

income and livelihood of the farmers.<br />

Livestock provides additional income and employment to the farmers. It is rich in its livestock population & has around 1,95,515 livestock population in<br />

2003 as per Live Stock census., out of which cattle population is 93329 , Goats­37988,Pigs­35102, Mithun­7394, Horses/Ponies­­430, Dogs­13767 with<br />

Poultry of 1,88,802 nos respectively. Dairy, milk production and sale of meat are the main activities related to livestock. Import of meat and meat products not<br />

only increases the cost of food but also results in outflow of resources. There are also 9 nos Veterinary Dispensary,14 nos Veterinary Aid centres , 16<br />

no cattle up grading centres with nil Cattle Breeding Farm, 2 nos Poultry Breeding Farms & nil Pig Breeding Farm. District witnessed Milk<br />

production of N.A litres during 2006­07.<br />

Local Fish & Fish Seed production is also done in the district which accounts for 2770 tonnes with fish seed ( fry) of 30 million nos & Fingerling­10<br />

million nos during 2006­07 of the State. Fish production is also insufficient hence need be imported from nearby towns of Assam.<br />

Although agro­produce, handlooms and handicrafts enjoy recognition in both national l markets but have not been able to take full advantage of the<br />

potential and existing demand due to limited quantities, marketing linkages, quality and standardization concerns.<br />

Other raw materials and potentials available:<br />

‐ 49 ‐


• Lohit is richly endowed with unutilized and unexploited mineral resources­ Coal, Dolomite,Graphite, limestone, marble, Ferro­Silicon Quartzite, Oil &<br />

Natural Gas, Lead & Zinc. Department. of Geology & Mining is the highest revenue earning one in the State. It had achieved a royalty of Rs.17592.88<br />

crore from 1995­96 till 2008­09 as assessment in the annual plan 2009­10 of Planning Deptt, Itanagar.<br />

• Lohit has tremendous forest resources. Its forest cover is 3231.44 sq km & above 62 percent. As such, forests represent the richest natural resource.<br />

The District has a wealth of herbal, medicinal and aromatic plants with tremendous economic potentials. The rich forest cover holds tremendous<br />

potential for bio­technological manipulations and also indicates strength for a sustainable timber industry, especially through tree cultivation. Therefore,<br />

biotechnology, which also represents one of the sunshine sectors, presents with a unique opportunity. There is great urgency, therefore, in this age of<br />

globalization, for the government to immediately institute measures of protection for these riches and also to find adequate funding for research and<br />

documentation in order to reap benefits for the people.<br />

• Bamboo, the fastest growing and highest yielding renewable natural resource, growing extensively all over the State, constitutes one of the most<br />

important resources of Arunachal Pradesh, The State has set up a Bamboo Mission to exploit the resources.<br />

• The other sunshine sector, IT, also has potential for district. One of the advantages the State has is that its medium of instruction in schools is English.<br />

With adequate and appropriate training programmes, the district could take advantage of this sector.<br />

• With all the natural advantages and beauty of district, including cultural diversity of the tribes, eco­ and community­based tourism presents great<br />

potential.<br />

• The district has a number of fascinating tourist spots scattered all over. But due to inadequate facilities yet to come up, only 1143 foreign tourists and<br />

50612 domestic tourists arrived as on 31­03­2007.. The landscape and topography of the district offers ideal locations for developing mountaineering,<br />

trekking, adventure tourism, water sports, aero sports, rafting, gliding, hiking, skiing as well as mere site seeing facilities<br />

It is industrially backward region, compared to the rest of the country. There is no large­scale industry of industrial unit and cottage and small scale<br />

industrial structures have craft and sericulture because of availability of raw material for handicraft development and favorable climate for the growth of silk<br />

worms feed plants. No. of Villages & SSI units registered in the district is 108 with total employment of 1500 nos as on 31/03/07 & with an investment Rs.2500<br />

lakhs during 06­07.<br />

‐ 50 ‐


The developmental experience of district has been full of challenge. The geographical remoteness and inaccessibility, hilly terrain, lack of infrastructure,<br />

population composition, scarce resources base, disruption of road network due to frequent occurrences of landslides during summer season are the biggest<br />

problem hampering developments.<br />

Harnessing of the resources and potentials—mineral, forest, agriculture, land, industry—and the opportunities in trade, the new sectors of IT or<br />

biotechnology require not only investments but also policy interventions to encourage such investments. Government’s role in making the investments cannot<br />

be understated but the limited availability of financial resources with the Government necessitates that private investment, both from within and outside the<br />

district is encouraged. By focusing on economic growth, district can expect to reap benefits through increased levels of income, employment generation and<br />

reduction in economic disparities within the different regions of the district and the populace.<br />

The State Govt has initiated development of craft by establishment of craft centres, emporium, show room – cum­ sale counter in the district, State as<br />

well as out side the State. Last 25 years witnessed annual turn out of craft centres @ 37.26% from Rs. 3.493 lakhs (1970­71) to Rs. 36.03 lakhs (1995­96)<br />

with marketable sale increase at an average annual rate of 93.34% from its very low level of Rs. 2.891 lakhs (1970­71) to 70.35 lakhs of rupees (1995­96). It<br />

means sale of craft products has been rising very fast. The infrastructure created is 81(1995­56) which has gone up to 616 SSI units (2006­07) which provide<br />

employment in the rural areas. Sericulture development has 28­ sericulture demonstration centres, 5­ sericulture relling units, 79­ weaving units in 226 villages.<br />

Varities of silk rearres like 3578­ Eri, 620­ Mulbarry, 120­ Muga and 30­ Oak Tasar which occupied 7464130 and 220 accars of land for development of these<br />

silkworm rears respectively.3 ITI, 14 Industrial estates at 211.5 accars of land have been raised for a development under the sector.<br />

During 2007–08, per capita net domestic product (at current prices) of the district was 42,149 lakh against per capita income during ’2001 as Rs.<br />

27,071 (at constant 1999–00 prices) as against Rs. 10,306 for the country as a whole.<br />

Details of livelihoods created for landless people:<br />

Lohit is inhabited by tribal population (S/T) with floating population who are businees man, labourers who have come from outside the state in search of<br />

employment & Govt. officials . A cross­section of tribal population inhahibiting the project area although possess small plot of land inherited from forefathers<br />

are very poor & marginal farmers who remain hand to mouth through out the year. They grow paddy & other crops which can sustain the family members for<br />

‐ 51 ‐


a maximum period of 6 months & remaining period by daily wages in other well­ to­do farmers & thereby remain insufficient to feed their families throughout<br />

the year in terms of food requirements .<br />

The amount of livelihood available to the common masses are in use for these class of poor people with S/T population getting<br />

certain extra benefits under different progamme of central/state govt as BPL category. Certain subsidized rates of foodgrains/execution under different<br />

programme are allowed. The present labour rates as approved by Labour Deptt. is Rs.80/­& Rs.90/­ for Soft & hard areas respectively. Whereas,skilled<br />

labourers are not readily available for different categories of works. These manpower have to be paid exorbitantly for getting the jobs done & put along with<br />

local labourers. With the present watershed interventions it is expected that the household income is brought up to Rs.3345/­ from Rs.2737/­ per month.<br />

Chapter 9<br />

Institutional arrangements :<br />

The institutional model and implementation arrangements have been developed to ensure the achievement of the project objectives in efficient way.<br />

In view of common guidelines for watershed development projects the institutional arrangement at State, District, PIA and Panchayat level have been<br />

designed.<br />

STATE LEVEL NODAL AGENCY:<br />

State level<br />

Rural Development Directorate in Arunachal Pradesh has been declared as a Nodal department and State Level Nodal Agency (SLNA) has also been<br />

constituted on 03­11­2008 under the chairmanship of Secretary & Commissioner (RD) to implement watershed projects under new Common Guidelines vide<br />

para­28. The SLNA will be having an independent bank account. Central assistance for SLNA will be transferred directly to the account of SLNA. The SLNA will<br />

sign an MOU with the Departmental Nodal Agency setting out mutual expectations with regard to performance, timelines and financial parameters including<br />

conditions related to release of funds to SLNA. The SLNA will be required to review the programme and provide enabling mechanism to set up State Data Cell<br />

and ensure regular reporting to the Central Government/ Nodal Agency at the central level in the Department. There would be multidisciplinary professional<br />

support team at the State level to implement the programme. The State Level Nodal Agency is having a full­time CEO who is a serving Government officer<br />

(Director, Rural Development) and a Secretary/Commissioner(RD) as Chairman with professional experts.<br />

‐ 52 ‐


The SLNA consists of one representative from the NRAA, one representative from the Central Nodal Ministry (DOLR), one representative from NABARD,<br />

one representative each from the State Department of Rural Development, Agriculture, Animal Husbandry, Works Deptt. and allied sector, one representative<br />

from Ground Water Board and .one representative from an eminent voluntary organization and two professional experts from research institutes / academia of<br />

the state. There is also representation from NREGA and other related implementing agencies at the state level.<br />

The SLNA will sanction watershed projects for the State on the basis of approved state perspective and strategic plan as per procedure in vogue and<br />

oversee all watershed projects in the state within the parameters set out in these Guidelines.<br />

State Level Monitoring / Evaluation Cell:<br />

As per 26 & 27 of common guideline for Watershed Development project a team of 4 to 7 professionals from disciplines like agriculture,Engineering,<br />

water management, capacity building social mobilization, economic information technology, administration and finance and accounts will be engaged to assist<br />

the State Level Nodal Agency. Requisite number of administrative staff will support this team of experts. The numbers of officers / officials to be engaged will<br />

be decided in view of the admissibility of the funds. Apart from above a State level data centre will be created for technical support to district watershed cell &<br />

data centre units all over the State and to ensure the regular and quality on line monitoring of Watershed projects. The State Level data Centre will be<br />

connected online with National Level data Centre<br />

The main functions of the SLNA :<br />

a) Prepare a perspective and strategic plan of watershed development for the state on the basis of plans prepared at the block and district level and<br />

indicate implementation strategy and expected outputs/outcomes, financial outlays and approach the Nodal Agency at the central level in the<br />

Department for appraisal and clearance.<br />

b) Establish and maintain a state level data cell from the funds sanctioned to the States, and connect it online with the National Level Data Centre.<br />

c) Provide technical support to District Watershed Development Units (DWDU)/watershed Cell cum Data centre at DRDAs of the state.<br />

d) Approve a list of independent institutions for capacity building of various stakeholders within the state and work out the overall capacity building<br />

strategy in consultation with NRAA/Nodal DOLR.<br />

e) Approve Project Implementing Agencies identified/selected by DWDU/ District Level Committee by adopting appropriate objective selection criteria and<br />

transparent systems.<br />

‐ 53 ‐


f) Establish monitoring, evaluation and learning systems at various levels (Internal and external/ independent systems).<br />

g) Ensure regular and quality on­line monitoring of watershed 'projects in the state in association with Nodal Agency at the central level and securing<br />

feedback by developing partnerships with independent and capable agencies.<br />

h) Constitute a panel of Independent Institutional Evaluators for all watershed projects within the state, get this panel duly approved by the concerned<br />

Nodal Agencies at the central level and ensure that quality evaluations take place on a regular basis.<br />

i) Prepare State Specific Process Guidelines, Technology Manuals etc in coordination with the Nodal Ministry/ NRAA and operationalise the same.<br />

Details of SLNA<br />

1 2 3 4 5<br />

S.<br />

No.<br />

Details of SLNA (Contd..)<br />

Date of<br />

Notification<br />

1, <strong>CD</strong>(RE)01/08­<br />

09(IWMP) Dtd<br />

03/11/2008 (<br />

Annexure­I)<br />

Type of SLNA<br />

‐ 54 ‐<br />

Date of MoU<br />

with DoLR<br />

Govt. Department Yet to be<br />

signed.<br />

Total no. of<br />

members of<br />

SLNA<br />

15


6 7<br />

Chairperson CEO<br />

Name Designation # Name Designation<br />

Shri.<br />

Tape<br />

Bagra<br />

Commissioner<br />

& Secretary,<br />

Dept. of Rural<br />

Development.<br />

Details of functionaries in the SLNA :<br />

Shri.<br />

Jokey<br />

Angu<br />

Director,<br />

Rural<br />

Development<br />

Date of<br />

Appointment<br />

03­11­2008<br />

Nature of<br />

appointment<br />

‐ 55 ‐<br />

Normal<br />

posting<br />

(SLNA is a<br />

State Govt.<br />

Department)<br />

1 2 3 4<br />

S.<br />

No.<br />

Total<br />

no.<br />

of<br />

pers<br />

ons<br />

work<br />

ing<br />

in<br />

the<br />

SLNA<br />

for<br />

IWM<br />

P<br />

Monthly<br />

emolume<br />

nts of all<br />

the<br />

persons<br />

working<br />

in the<br />

SLNA for<br />

IWMP<br />

1 9 nos Shall be<br />

borne by<br />

the state<br />

Govt. as<br />

Names &<br />

Designatio<br />

n<br />

Sri T. Bagra,<br />

IAS,<br />

Secy.<br />

/Commission<br />

Monthly<br />

remuner<br />

ation<br />

As per the<br />

status and<br />

scale<br />

Tenure<br />

(No. of<br />

years)<br />

Till<br />

transfer/<br />

retirement<br />

Contact Ph. No./ Fax/ E­mail<br />

Ph. No: 0360­<br />

2212391/2290764/2291057<br />

Mobile:<br />

9436040225/9436058433/9436040943<br />

Details of the persons engaged in the SLNA funded by DoLR<br />

Date of<br />

Appointm<br />

ent<br />

Nature<br />

of<br />

appoint<br />

­ment $<br />

24­09­08 Through<br />

Govt.<br />

departme<br />

ntal<br />

posting<br />

Tenure<br />

(No. of<br />

years)<br />

Till<br />

Transfer<br />

/retirem<br />

ent<br />

Contact<br />

Ph.<br />

No./<br />

Fax/<br />

E­mail<br />

Chairma<br />

n­<br />

0360/22<br />

12391(O<br />

&F)/094<br />

Subject<br />

of<br />

Expertis<br />

e<br />

Administ<br />

ration &<br />

Law<br />

Qualif<br />

i­<br />

cation<br />

MA(Pol<br />

­Sci),<br />

LLB<br />

Experien<br />

ce<br />

Served<br />

as<br />

Lecturer,<br />

Inducted<br />

Role<br />

Administ<br />

ration


2<br />

per their<br />

status and<br />

scale .<br />

er (RD)<br />

(Chairman)<br />

Jokey<br />

Angu,APCS,<br />

Director(RD<br />

)& Joint<br />

Secretary<br />

to HCM.<br />

(CEO)<br />

As per the<br />

status and<br />

scale<br />

24­09­08 Through<br />

Govt.<br />

departme<br />

ntal<br />

posting<br />

‐ 56 ‐<br />

Till<br />

Transfer<br />

/retirem<br />

ent<br />

36o4022<br />

5(M),E­<br />

mail:­­­­<br />

CEO­<br />

0360/22<br />

90764(O<br />

& F)<br />

/094360<br />

58433(M<br />

)/09436<br />

040046(<br />

M) & E­<br />

mail:­­­­<br />

Administ<br />

rative<br />

officer<br />

BA<br />

(Eng)<br />

into<br />

APCS<br />

(Sr) in<br />

the<br />

capacity<br />

of EAC,<br />

D.C,<br />

Secretar<br />

y, RC<br />

(Delhi)&<br />

presentl<br />

y as<br />

Commiss<br />

ioner(RD<br />

,RWD),<br />

Govt. of<br />

Arunach<br />

al<br />

Pradesh.<br />

Inducted<br />

into EAC<br />

through<br />

APPSC,<br />

served<br />

as<br />

administ<br />

rative<br />

officers,<br />

Project<br />

Administ<br />

ration


3 Minjom<br />

Padu, Joint<br />

Director<br />

(RE)­cum­<br />

SNO,IWDP/<br />

Hariyali,<br />

RD.<br />

(Member<br />

Secretary)<br />

As per the<br />

status and<br />

scale<br />

24­09­08 Through<br />

Govt.<br />

departme<br />

ntal<br />

posting<br />

‐ 57 ‐<br />

Till<br />

Transfer<br />

/retirem<br />

ent<br />

0360/22<br />

91057/0<br />

9436040<br />

943<br />

Enginerin<br />

g<br />

BE(Civi<br />

l)<br />

Director,<br />

DRDA,<br />

D.C,<br />

Registrar<br />

Co­<br />

operativ<br />

e<br />

Societies<br />

&<br />

presentl<br />

y as<br />

Joint<br />

Secretar<br />

y to HCM<br />

in<br />

addition<br />

to<br />

Director,<br />

RD.<br />

Assistant<br />

Engineer<br />

© in<br />

PWD<br />

through<br />

PSC,<br />

Arunach<br />

al<br />

Pradesh<br />

in 1989.<br />

Head<br />

,Subject<br />

Matter<br />

Specialist


‐ 58 ‐<br />

supervisi<br />

oed field<br />

works of<br />

various<br />

Bldg,<br />

roads &<br />

other<br />

infrastru<br />

ctures as<br />

site<br />

engineer<br />

,<br />

presentl<br />

y<br />

serving<br />

in<br />

Rural<br />

Develop<br />

ment<br />

Deptt.<br />

on<br />

deputati<br />

on since<br />

2004 &<br />

involved<br />

in<br />

planning<br />

,<br />

monitori


T. Ado,<br />

Joint<br />

Director,<br />

RD.<br />

(Member)<br />

Smti N.B.<br />

Doye, Dy.<br />

Director<br />

(RD)<br />

(Member)<br />

Shri S.<br />

Choudhury,<br />

Extension<br />

Officer (RE)<br />

(Member)<br />

As per the<br />

status and<br />

scale<br />

As per the<br />

status and<br />

scale<br />

As per the<br />

status and<br />

scale<br />

24­09­08 Through<br />

Govt.<br />

departme<br />

ntal<br />

posting<br />

24­09­08 Through<br />

Govt.<br />

departme<br />

ntal<br />

posting<br />

24­09­08 Through<br />

Govt.<br />

departme<br />

ntal<br />

posting<br />

‐ 59 ‐<br />

Till<br />

Transfer<br />

/retirem<br />

ent<br />

Till<br />

Transfer<br />

/retirem<br />

ent<br />

Till<br />

Transfer<br />

/retirem<br />

ent<br />

0360/22<br />

91059/0<br />

0986291<br />

7758<br />

0360/22<br />

91059/0<br />

0986291<br />

7758<br />

0360/22<br />

91057/0<br />

0943605<br />

5854<br />

Economi<br />

st<br />

Women<br />

Develop<br />

ment<br />

Enginerri<br />

ng<br />

MA(Ec<br />

ol)<br />

BA<br />

(Eng)<br />

Diplom<br />

(Civil)<br />

ng &<br />

supervisi<br />

on of in<br />

IWDP/<br />

Hariyali<br />

as Nodal<br />

officers<br />

for the<br />

last 6<br />

years.<br />

Dealing<br />

with all<br />

RD<br />

Program<br />

mes<br />

Dealing<br />

with all<br />

RD<br />

Program<br />

mes<br />

Dealing<br />

with all<br />

RD<br />

Program<br />

mes for<br />

last 15<br />

years<br />

Subject<br />

Matter<br />

Specialist<br />

Subject<br />

Matter<br />

Specialist<br />

Subject<br />

Matter<br />

Specialist


*<br />

2nos @<br />

25,000=50<br />

,000.00<br />

Miss R.<br />

Pertin,<br />

Extension<br />

Officer (RE)<br />

(Member)<br />

2 nos­<br />

member.<br />

As per the<br />

status and<br />

scale<br />

To be<br />

taken on<br />

contract/<br />

deputatio<br />

n.<br />

Details of State Level Data Cell (SLDC) functionaries:<br />

24­09­08 Through<br />

Govt.<br />

departme<br />

ntal<br />

posting<br />

1 2 3 4<br />

S.<br />

No.<br />

Total no.<br />

of persons<br />

working in<br />

the SLDC<br />

for IWMP<br />

Monthly<br />

emoluments<br />

of all the<br />

persons<br />

working in<br />

the SLDC<br />

for IWMP<br />

1. 6 Shall be borne<br />

by the state<br />

Govt. as per<br />

the status and<br />

scale<br />

Names &<br />

Designation<br />

Sri Pankaj<br />

Das, UDC­<br />

cum­<br />

Computer<br />

On<br />

contract/<br />

Deputatio<br />

n.<br />

‐ 60 ‐<br />

Till<br />

Transfer<br />

/retirem<br />

ent<br />

As per<br />

terms of<br />

contract/<br />

deputati<br />

on.<br />

0360/22<br />

91057/0<br />

0961248<br />

4334<br />

To be<br />

intimate<br />

d later.<br />

Details of the persons engaged in the SLDC to be funded by DoLR<br />

Monthly<br />

remuneration<br />

Date of<br />

Appoint<br />

ment<br />

As per the<br />

status and scale Regular<br />

Govt<br />

Official .<br />

But Govt<br />

Nature<br />

of<br />

appoint­<br />

ment $<br />

Tenure<br />

(No. of<br />

years)<br />

regular Till<br />

Transfe<br />

r/retire<br />

ment<br />

Contact<br />

Ph. No./<br />

Fax/<br />

E­mail<br />

0360­<br />

2291057<br />

(o),<br />

0985657<br />

Qualifi­<br />

cation<br />

Enginerri<br />

ng<br />

Agri &<br />

Horti<br />

BE<br />

(Civil)<br />

Minimu<br />

m<br />

Degree<br />

Experience Role<br />

B.com Worked as<br />

Computer<br />

operator &<br />

attached<br />

to JD(RE),<br />

Monit<br />

oring ,<br />

superv<br />

ision/<br />

online<br />

Dealing<br />

with all<br />

RD<br />

Program<br />

mes .<br />

Having<br />

thorough<br />

knowled<br />

ge about<br />

watershe<br />

d<br />

program<br />

me.<br />

Subject<br />

Matter<br />

Specialist<br />

Subject<br />

Matter<br />

Specialist<br />

s


Operator,<br />

RD Deptt.<br />

notificati<br />

being<br />

issued<br />

shortly<br />

‐ 61 ‐<br />

1800<br />

(M)<br />

RD as PA<br />

cum<br />

computer<br />

Operator<br />

for last 12<br />

years.<br />

Dealt with<br />

IWDP/Hari<br />

yali &<br />

other RD<br />

programm<br />

e as<br />

computer<br />

expert for<br />

last 7 ­<br />

2 T.Yami,UDC B.A. Working in<br />

IWDP/Hari<br />

yali cell of<br />

Directorate<br />

since 4<br />

3<br />

Sri Lige Ete 30000/­ Apptt.<br />

Being<br />

issued<br />

shortly<br />

by State<br />

Govt.<br />

Contract Till<br />

comple<br />

tion of<br />

project<br />

.<br />

0360/22<br />

91795<br />

/094020<br />

43860.<br />

M.A(Pol<br />

Sc)<br />

years<br />

years.<br />

Worked<br />

in<br />

Insurance<br />

& private<br />

firms.<br />

Having<br />

Basic<br />

knowledg<br />

data<br />

entrie<br />

s.<br />

Data<br />

mana<br />

geme<br />

nt and<br />

analys<br />

is.<br />

­do­


4<br />

to<br />

6<br />

To be<br />

taken on<br />

Contract &<br />

support<br />

needed<br />

from DOLR.<br />

(1,20,000/­)<br />

3 nos 30000/­ each<br />

‐ 62 ‐<br />

To be<br />

intimate<br />

d later.<br />

Minimu<br />

m<br />

Degree<br />

in<br />

IT/Com<br />

puter<br />

Appl.<br />

/Agri/H<br />

orti<br />

backgro<br />

ung<br />

e of<br />

computer<br />

/ data<br />

entries.<br />

Should<br />

have<br />

knowledge<br />

of<br />

computer<br />

application<br />

The SLNA is yet to be registered under Society Registration Act 1860 for which the Department has processed the matters. It has started functioning<br />

with opening of SLNA Account in nationalized Bank against which the SLNA Administration fund has been transferred by DoLR, GOI. It has also requested the<br />

steering Committee held on 28 th Oct ‘2009 for placing the project funds at the SLNA account to ensure proper and timely implementation unlike the delays<br />

observed in the IWDP /Hariyali projects so that appropriate mechanism of speedy implementation can be made.<br />

Watershed cell cum data centre in DRDA:<br />

District Level Institutional arrangements<br />

• Arunachal Pradesh State Government has issued orders to establish the District Watershed Development Unit (DWDU) in each district with Project<br />

Director/District head of line departments as Project Manager (on specific approval of SLNA). In the instant project the DWDU as not approved by<br />

Union Cabinet & Watershed Cell cum Data Centre (W<strong>CD</strong>C of DRDA) allowed will oversee the implementation of watershed programme in each district<br />

­do­


and will have separate independent accounts for this purpose. W<strong>CD</strong>C will function in close coordination with the District Planning Committee. There<br />

will also be a representation in W<strong>CD</strong>C for NREGA implementing agencies at the district level.<br />

• W<strong>CD</strong>C would function as a separate unit under DRDA with full time officer well conversant, dealing with watershed programme for last 5 years<br />

minimum & not below the rank of Technical Assistant as subject specialist) identified with supporting staffs as admissible & allowed by DOLR/SLNA on<br />

contract/deputation/transfer etc. The arrangements for setting up/ strengthening the District Data Cell will be financially supported by the Government<br />

of India after review of available staff, infrastructure and the actual requirement.<br />

The main functions of W<strong>CD</strong>C will be :<br />

a) Identify potential Project Implementing Agencies (PIAs) in consultation with SLNA as per the empanelment process as decided by the respective<br />

state governments.<br />

b) Take up the overall responsibility of facilitating the preparation of strategic and annual action plans for watershed development projects in<br />

respective districts.<br />

c) Providing professional technical support to Project Implementing Agencies (PIAs) in planning and execution of watershed development projects.<br />

d) Develop action plans for capacity building, with close involvement of resource organizations to execute the capacity building action plans.<br />

e) Carry out regular monitoring, evaluation and learning.<br />

f) Ensure smooth flow of funds to watershed development projects.<br />

g) Ensure timely submission of required documents to SLNA / Nodal Agency of the Department at central level.<br />

h) Facilitate co­ordination with relevant programmes of agriculture, horticulture, rural development, animal husbandry, etc with watershed<br />

development projects for enhancement of productivity and livelihoods.<br />

i) Integrate watershed development projects/ plans into District Plans of the district planning committees. All expenditure of watershed projects<br />

would be reflected in district plans.<br />

j) Establish and maintain the District Level Data Cell and link it to the State Level and National Level Data Centre.<br />

District Watershed Development Unit as not approved by Union Cabinet but watershed cell cum data centre (W<strong>CD</strong>C) with one expert and data entry<br />

operators with an officer not below the rank of TA (Actively involved for the last to 6­ 10 years) is positioned in the DRDA level for over seeing Planning,<br />

‐ 63 ‐


Supervision and Monitoring at DRDA level. Separate correspondence is also being initiated to DoLR, GOI as the DRDA has already watershed ongoing projects<br />

covering more than 25,000 ha. and for financial support for infrastructure facilitating prompt MIS etc.<br />

• The DWDU / District Watershed Cell have been notified commonly for all District of Arunachal Pradesh with PD, DRDA / Districts Officers of<br />

Line Departments (EE of Works Department / DHO / DAO / DFO/DVO) subject to specific approval of SLNA / State Govt). For the purpose<br />

of this project the W<strong>CD</strong>C under DRDA, Tezu with an APO/TA designated as officer concerned under PD, DRDA, Tezu will function.<br />

1 2 3 4 5 6 7 8<br />

S.<br />

No.<br />

1<br />

Name<br />

of the<br />

District<br />

Lohit<br />

Name of<br />

the<br />

executing<br />

Agency#<br />

DRDA,<br />

Tezu (<br />

With a<br />

W<strong>CD</strong>C<br />

headed<br />

by an<br />

APO/TA<br />

as<br />

designate<br />

d officer<br />

under<br />

PD,<br />

DRDA,<br />

Tezu on<br />

Status of<br />

Chairman<br />

@<br />

PD,<br />

DRDA,<br />

Tezu to<br />

function<br />

as<br />

Project<br />

Manager<br />

under<br />

the<br />

guidance<br />

of<br />

designat<br />

ed officer<br />

at<br />

Date of<br />

signing of<br />

MoU with<br />

SLNA<br />

Total<br />

no. of<br />

persons<br />

working<br />

for<br />

IWMP<br />

Not Yet 5 nos at<br />

W<strong>CD</strong>C<br />

under<br />

DRDA,T<br />

ezu with<br />

the PD<br />

as<br />

Project<br />

Manager<br />

.(Staff<br />

details<br />

as per<br />

footnot<br />

e)<br />

Monthly<br />

emolu<br />

ments<br />

of all<br />

persons<br />

working<br />

for<br />

IWMP<br />

Rs.34,5<br />

00.00<br />

Details of the two personnel engaged in the Watershed Cell funded by DoLR<br />

Name<br />

and<br />

Designati<br />

on<br />

1.Mudang<br />

Tatum,<br />

Project<br />

Manager.<br />

2.APO/TA<br />

to be<br />

nominate<br />

d to do<br />

duties of<br />

Technical<br />

Expert on<br />

‐ 64 ‐<br />

Monthly<br />

Remun<br />

eration<br />

Date of<br />

Appoint­<br />

ment<br />

w.e.f.01/<br />

Rs.15,0 12/2009.<br />

00.00<br />

for<br />

paymen<br />

t of<br />

honorar<br />

ium/TA<br />

/DA as<br />

per<br />

actual<br />

works<br />

done<br />

Nature<br />

of<br />

appoint­<br />

ment $<br />

Contract<br />

/ As per<br />

Govt.<br />

transfer<br />

&<br />

posting.<br />

Tenure<br />

(No. of<br />

years)<br />

Till the<br />

completi<br />

on of the<br />

project.<br />

Contact<br />

Ph.<br />

No./<br />

Fax/<br />

e­mail<br />

03788/<br />

225755<br />

R),222<br />

363(O)<br />

/09436<br />

068358<br />

Qualifi­<br />

cation<br />

Degree<br />

Tech.<br />

Diplom<br />

a/Degr<br />

ee<br />

with<br />

Experienc<br />

e<br />

Role<br />

Have<br />

been in Overal<br />

involved l<br />

in contro<br />

Watershe l of<br />

d Water<br />

manage shed<br />

ment for progra<br />

last 6 yrs. mme.<br />

Planni<br />

ng /<br />

Super<br />

vision


approval columnof<br />

SLNA). 3.<br />

Staffs to work in W<strong>CD</strong>C under DRDA with rates of emoluments:<br />

approval<br />

of SLNA.<br />

‐ 65 ‐<br />

by<br />

Tech.<br />

Expert<br />

i/c<br />

hiring<br />

of other<br />

experts<br />

.<br />

Sl.no. Post Monthly rate Remarks<br />

1. Technical Expert Rs.15,000/­P.M. An APO/TA , DRDA, Tezu to be<br />

Designated as Nodal officer, W<strong>CD</strong>C under<br />

DRDA & will perform duties of technical<br />

expert. Other tech. officers of DRDA &<br />

<strong>CD</strong> Block will also<br />

assist him & if needed can hire experts from<br />

outwise of DRDA/Block .The monthly rate<br />

earmarked will be utilized for disbursements<br />

experie<br />

nce<br />

inwater<br />

shed<br />

manag<br />

ement<br />

for last<br />

6<br />

years.<br />

and<br />

Monit<br />

oring(<br />

MIS) .


of remuneration /honorarium/TA/DA to<br />

experts hired .<br />

2. Accountant Rs.10,000/­P.M. An Accounts background preferably retired staff to<br />

be preferred. Till then an accounts clerk in DRDA<br />

will perform the duties under supervision of<br />

Accounts officer of DRDA. The accounts clerk to<br />

Look after W<strong>CD</strong>C Accountant’s work will have to<br />

be approved by SLNA.<br />

3. Data Entry Operator ­2 nos. Rs.6000/­P.M. should be Computer trained.<br />

4. Office Assistant Rs. 3500/­P.M For multipurpose usage as peon/ helper<br />

Role of Panchayati Raj Institutions at district and intermediate levels:<br />

The full responsibility of overseeing the watershed program within the district will lie with the W<strong>CD</strong>C which will work in close collaboration with the<br />

District Planning Committee (DPC). The DPC will provide full governance support to the programme , DPC will formally approve the perspective plan &<br />

integrate the watershed development plans approved by SLNA & agreed upon by DOLR with over all district plans and also oversee its ' implementation. W<strong>CD</strong>C<br />

will help the DPC in providing oversight and ensuring regular monitoring and evaluation of the programme. The District Panchayat / Zilla Parishad will have an<br />

important role of governance in matters relating to the co­ordination of various sectoral schemes with watershed development projects, review of progress,<br />

settling disputes etc.<br />

‐ 66 ‐


Similarly, Intermediate Panchayats have an important role in planning the watershed development projects at the intermediate level. They can also<br />

provide valuable support to PIAs and Gram Panchayats/ Watershed Committees in technical guidance with the help of their subject matter specialist.<br />

PROGRAMME IMPLEMENTING AGENCY (PIA) :<br />

Institutional Arrangements at Project Level:<br />

The implementation of watershed projects in different districts will be done through the Programme implementing Agencies (PIAs). As per common<br />

guidelines, these PIAs may include relevant line departments, autonomous organization under State / Central Government, Panchayat Samiti, Voluntary<br />

Organization (VOs). However, the selection of PIAs will be preferred on the basis of prior experience in watershed related aspects or management of<br />

watershed development and they should be prepared to constitute dedicated Watershed Development Team (WDT). In view of common guidelines the PIAs<br />

would be decided by the State Level Nodal Agency on the recommendation of District watershed cell cum data centre of DRDA. However, the following<br />

criteria will be followed in the selection of the PIAs.<br />

• PIA should preferably have prior experience in watershed related aspects or management of watershed development projects.<br />

• PIA should be prepared to constitute dedicated Watershed Development Teams.<br />

• Voluntary Organizations (VOs):<br />

Voluntary Organizations will have an important role in the program and their services will be utilized substantively in the areas of awareness<br />

generation, capacity building, IEC and social audit among others. As far as direct implementation of the programme is concerned, Voluntary Organizations<br />

(VOs) with established credentials may be chosen as PIAs on the basis of detailed criteria as enumerated below.<br />

The Voluntary Organizations (VOs) would need to satisfy the following criteria to be selected as PIA:<br />

• Should be a registered legal entity of at least 5 years standing.<br />

‐ 67 ‐


• Should have had at least 3 years of field experience in the area of community based Natural Resource Management and livelihood development.<br />

• Should not have been blacklisted by CAPART or any other Department of Government of India or State Government.<br />

• Should be equipped with a dedicated, multidisciplinary team with gender balance.<br />

• Should furnish three years balance sheet, audited statement of accounts and income returns. All accounts of the organization should be up to date.<br />

• Should furnish the profile of its Board of Directors. Should have successfully implemented projects independently.<br />

It will be subjected to the following conditions:<br />

i. At any point of time, one VO cannot be assigned more than 10,000 ha area in a district<br />

ii. At any point of time, one VO cannot be assigned more than 30,000 ha area in a State.<br />

iii. In any case, not more than 1/4th of the total Projects at a time in a State to be implemented by VOs.<br />

� Selected PIAs will sign a contract/MOU with the concerned W<strong>CD</strong>C, District Level Committee. It will spell out well­defined annual outcomes, against<br />

which the performance of each PIA will be monitored each year and evaluated on a regular basis by institutional evaluators from a panel approved by<br />

the SLNA / DOLR,GOI.<br />

� Each PIA must put in position dedicated watershed development team (WDT) with the approval of W<strong>CD</strong>C under DRDA. The WDT will be hired on<br />

contract / deputation / transfer etc for a term not exceeding the project period. The composition of the WDT will be indicated in the contract/ MOU. No<br />

programme funds for DPR and watershed works under any circumstances should be released to either the PIA or Watershed Committee (WC) unless<br />

the composition of the WDT has been clearly indicated in the MOU/ contract and the team members are fully in place.<br />

� Roles and Responsibilities of the PIA:<br />

‐ 68 ‐


The Project Implementing Agency (PIA) will provide necessary technical guidance to the Gram Panchayat for preparation of development plans for the<br />

watershed through Participatory Rural Appraisal (PRA) exercise, undertake community organization and training for the village communities, supervise<br />

watershed development activities, inspect and authenticate project accounts, encourage adoption of low cost technologies and build upon indigenous technical<br />

knowledge, monitor and review the overall project implementation and set up institutional arrangements for post­project operation and maintenance and<br />

further development of the assets created during the project period.<br />

The PIA, after careful scrutiny, shall submit the Action Plan for Watershed Development Project for approval of the W<strong>CD</strong>C and other arrangements. The<br />

PIA shall submit the periodical progress report to W<strong>CD</strong>C. The PIA shall also arrange physical, financial and social audit of the work undertaken. It will facilitate<br />

the mobilization of additional financial resources from other government programmes, such as NREGA, National Horticulture Mission, Tribal Welfare Schemes,<br />

Artificial Ground Water Recharging, Greening India, etc.<br />

The State Govt has approved BDO / line Departments / Voluntary Organization for nomination as PIA (for which specific approval has to be<br />

given by SLNA) under watershed projects. For the instant project the BDO, Wakro <strong>CD</strong> Block will be the PIAs, which will be officially ratified by SLNA.<br />

The parameters taken into consideration were based on the project area (Wakro, Kathan, Cibi, Tilangkyong, Old Pukhuri, Towam, Tamiliang &<br />

mawai­I & adjoining areas, whose MWS indicated with latitude­ longitude) being within the jurisdiction of the <strong>CD</strong> Block & since it’s under Rural<br />

Development Department , the SLNA being under same department Can exercise full control over implementation, judicious expenditure, supervision &<br />

monitoring with watershed cell cum data centre under DRDA ,Tezu . The PIA has a strong dedicated multidisciplinary team of experts with vast experience<br />

in the field of project implementation and management of watershed programme. The PIA has penetrated down to the grassroots level, with a major project<br />

benefits going directly to village communities of Darka with special emphasis to communities under project area. It will serve as a catalyst for district in<br />

encouraging and spreading new ideas in developing and improving land use system which ensure food security, enhance cash returns, generate new<br />

employment opportunities, and conserve the rich biodiversity of State.<br />

The PIAs will in addition to discharging responsibility / duties as envisaged in the Guideline constitute Watershed Development Team (WDT).<br />

WDT is an integral part of the PIA and will be set up by the PIA. Each WDT should have at least four members, broadly with knowledge and experience in<br />

agriculture, soil science, water management, social mobilisation and institutional building. At least one of the WDT members should be a woman. The WDT<br />

‐ 69 ‐


members should preferably have a professional degree. However, the qualification can be relaxed by the W<strong>CD</strong>C with the approval of SLNA in deserving cases<br />

keeping in view the practical field experience of the candidate. The WDT should be located as close as possible to the watershed project. At the same time, it<br />

must be ensured that the WDT should function in close collaboration with the team of experts at the district and state level. The expenses towards the<br />

salaries/remuneration of the WDT members shall be charged from the administrative support to the PIA. W<strong>CD</strong>C will facilitate the training of the WDT<br />

members.<br />

The WDT Team shall be hired on contract / deputation / transfer etc. Composition of WDT is also required to be indicated in MOU / Contract the PIA<br />

is to sign with the District level committee which shall be preferably headed by Deputy Commissioner –cum­ CEO DRDA/chairman, ZP. The composition of WDT<br />

for the instant projects shall be as follows­<br />

Watershed Development Team fo IWMP­I­Wakro <strong>CD</strong> Blocks:<br />

As the project areas at Wakro, Kathan, Cibi, Tilangkyong, Old Pukhuri, Towam, Tamiliang & mawai­I & adjoining areas<br />

with 9955 ha falls under Wakro <strong>CD</strong> Block, there may be only one WDT which is as follows­<br />

Serial No. Name and designation Qualification Designation in<br />

WDT<br />

1 Sri Damka Gamlin,APO(RE),<br />

DRDA,Tezu<br />

2. Sri P.K. Rao EO(RE),Wakro<br />

<strong>CD</strong> Block<br />

B.Tech. Team Leader<br />

Diploma in civil<br />

engineering<br />

WATERSHED DEVELOPMENT TEAM (WDT)<br />

Member<br />

3. Sri Tabi Nguso,A.D.O., B.Sc.(Agri) Member<br />

‐ 70 ‐


Wakro <strong>CD</strong> Block<br />

4. Miss Migam Dirchi, EO(AH<br />

&V), Wakro <strong>CD</strong> Block<br />

B.V.Sc &A.H. Member<br />

( N.B: The process of selection of WDT Members is through Departmental proper screening based on requisite qualification and<br />

experiences which fulfills the criteria as a Subject Matter Specialist prescribed by the watershed guidelines issued by the Govt. of<br />

India. Moreover, the Blocks have subject wise experts already positioned at Block level i/c line Departments)<br />

Roles and responsibilities of WDT:<br />

The WDT will guide the Watershed Committee (WC) in the formulation of the watershed action plan. An indicative list of the roles and<br />

responsibilities of the WDT would include among others, the following­<br />

• Assist Village Communities/Gram Panchayat / Gram Sabha in constitution of the Watershed Committee and their functioning.<br />

• Organizing and nurturing User Groups and Self­Help Groups.<br />

• Mobilising women to ensure that the perspectives and interests of women are adequately reflected in the watershed action plan.<br />

• Conducting the participatory base­line surveys, training and capacity building.<br />

• Preparing detailed resource development plans including water and soil conservation or reclamation etc. to promote sustainable<br />

livelihoods at household level.<br />

• Common property resource management and equitable sharing.<br />

• Preparing Detailed Project Report (DPR) for the consideration of Gram Sabha ( which is out sourced in the instant case)<br />

• Undertake engineering surveys, prepare engineering drawings and cost estimates for any structures to be built.<br />

• Monitoring, checking, assessing, undertaking ­ physical verification and ' measurements of the work done.<br />

• Facilitating the development of livelihood opportunities for the landless.<br />

• Maintaining project accounts.<br />

• Arranging physical, financial and social audit of the work undertaken.<br />

‐ 71 ‐


• Setting up suitable arrangements for post­project operation, maintenance and future development of the assets created during the project<br />

period.<br />

The PIA will also –<br />

a).Provide technical support toVillage communities/ GP in preparation of Development plan through PRA exercise, undertake community<br />

organization/training for village communities, supervise watershed development activities, inspect & authenticate project accounts, encourage low cost<br />

technologies ,build upon indigenous technical knowledge, monitor & review overall project implementation & set up institutional arrangements for post­project<br />

operation & maintenance & further development of assets created during project period including ensuring timely implementation of the project by providing<br />

all possible support to the watershed committee. The Action Plan as out lined in the instant DPR will have to be converted into reality under the leadership of<br />

PIA who will also ensure submission of data base for online transmission of information<br />

b). The Action Plan/watershed development plan as out lined in the instant DPR to be converted into reality under the leadership of PIA who will also<br />

ensure submission of data base, periodical progress reports for online transmission of information to W<strong>CD</strong>C of DRDA. The PIA will also initiate actions for<br />

formal approval of PRI/DRDA of Action plan without any modification.<br />

Local Level Institutions:<br />

WATERSHED COMMITTEE (WC):<br />

� The Village communities/Gram Sabha will constitute the Watershed Committee (WC) to implement the Watershed project with the technical support of<br />

the WDT in the village. The Watershed Committee (WC) has to be registered under the Society Registration Act, 1860. The Gram Sabha may<br />

elect/appoint any suitable person from the village as the Chairman of Watershed Committee. The secretary of the Watershed Committee.(WC) will be a<br />

paid functionary of the Watershed Committee (WC). The Watershed Committee (WC) will comprise of at least 10 members, half of the members shall be<br />

representatives of SHGs and User Groups, SC/ST community, women and landless persons in the village. One member of the WDT shall also be<br />

represented in the Watershed Committee (WC). Where the Panchayat covers more than one village, they would constitute a separate subcommittee for<br />

each village to manage the watershed development project in the concerned village. Where a watershed project covers more than one Gram Panchayat,<br />

separate committees will be constituted for each Gram Panchayat. The Watershed Committee (WC) would be provided with an independent rented<br />

office accommodation.<br />

‐ 72 ‐


� The Watershed Committee will open a separate bank account to receive funds for watershed projects and will utilise the same for undertaking its<br />

activities. The expenses towards the remuneration of the WDT members (as Govt. officers/officials) and salary of Secretary of Watershed Committee<br />

(WC) shall be charged from the administrative expenses under the professional support to the PIA.<br />

Secretary, Watershed Committee:<br />

The Secretary of the Watershed Committee, (WC) will be selected in a meeting of the Gram Sabha/village Communities. This person would be an<br />

independent paid functionary distinct and separate from the Panchayat Secretary. He would be a dedicated functionary with no responsibilities other than the<br />

assistance to the Watershed Committee (WC) and would work under the direct supervision of the Chairman/President of Watershed Committee (WC) and<br />

would be selected on the basis of merit and experience. The expenses towards the honorarium to be paid to Secretary of Watershed Committee (WC) will be<br />

charged from the administrative support to the PIA. The Secretary will be responsible for the following tasks:<br />

• Convening meetings of the Gram Sabha, Gram Panchayat, Watershed Committee for facilitating the decision making processes in the context of<br />

Watershed Development Project.<br />

• Taking follow­up action on all decisions.<br />

• Maintaining all the records of project activities and proceedings of the meetings of Gram Panchayat, Watershed Committee (WC) and other institutions<br />

for Watershed Development Project.<br />

• Ensuring payments and other financial transactions.<br />

• Signing the cheques jointly with the WDT nominee on behalf of the Watershed Committee.<br />

SELF HELP GROUPS (SHG):<br />

The Watershed Committee shall constitute SHGs in the watershed area with the help of WDT from amongst poor, small and marginal farmer<br />

households, landless/asset less poor agricultural labourers, women, shepherds and SC/ST persons. These Groups shall be homogenous groups having common<br />

identity and interest who are dependent on the watershed area for their livelihood. Each Self Help Group will be provided with a revolving fund of an amount to<br />

be decided by the Nodal Ministry.<br />

‐ 73 ‐


USER GROUPS (UG):<br />

The Watershed Committee (WC) shall also constitute User Groups in the watershed area with the help of WDT. These shall be homogenous groups of<br />

persons most affected by each work/ activity and shall include those having land holdings within the watershed areas. Each User Group shall consist of those<br />

who are likely to derive direct benefits from a particular watershed work or activity. The Watershed Committee (WC) with the help of the WDT shall facilitate<br />

resource­use agreements among the User Groups based on the principles of equity and .sustainability. These agreements must be worked out before the<br />

concerned work is undertaken. It must be regarded as a pre­condition for that activity. The User Groups will be responsible for the operation and maintenance<br />

of all the assets created under the project in close collaboration with the Gram<br />

PANCHAYAT AND THE GRAM SABHA:<br />

The Gram Panchayat would perform the following important functions:<br />

• Supervise, support and advise Watershed Committee from time to time.<br />

• Authenticate the accounts/ expenditure statements of Watershed.<br />

• Facilitate the convergence of various projects/ schemes to institutions of watershed development project.<br />

• Maintain asset registers under watershed development projects with a view to retain it after the watershed development project.<br />

• Provide office accommodation and other requirements to Watershed Committee.<br />

• Allocate usufruct rights to deserving user groups/ SHGs over the assets created.<br />

This IWMP project is based on joint relationship among three entities: (i) village communities and GPs; (ii) W<strong>CD</strong>C/SLNA and (iii) PIA's. All these three<br />

stakeholders will fulfill their respective roles and responsibilities for the project to be successful.<br />

Specifically:<br />

Village community and GP:<br />

Will plan and implement the project<br />

‐ 74 ‐


W<strong>CD</strong>C/SLNA:<br />

PIA:<br />

Provide overall coordination and assist the village communities & GPs.<br />

Carry out social mobilization, may provide technical assistance and undertake other activities as agreed to with Village communities/ GPs and W<strong>CD</strong>C,<br />

ROLES AND RESPONSIBILITIES:<br />

A. Panchayat level Institutions ­<br />

Sl.<br />

No.<br />

Institution Compositio<br />

n<br />

Gram Sabha All adult<br />

voters of the<br />

Gram<br />

Panchayat<br />

Role Account<br />

• To facilitate in the constitution of<br />

WC.<br />

• To elect/ appoint any suitable<br />

person from the village as the<br />

chairman of Watershed Committee.<br />

• Ensure inclusion of disadvantaged<br />

able to<br />

Village<br />

communi<br />

ty<br />

‐ 75 ‐


2. Gram<br />

Panchayat<br />

Gram<br />

Panchayat<br />

Members<br />

groups such as women, poor,<br />

SC/ST, transhumant.<br />

• To approve the DPRs.<br />

• To approve / pass the rules for<br />

WDF.<br />

• Supervise / support and advise<br />

Watershed Committee.<br />

• Authenticate the accounts /<br />

expenditure statements of WC and<br />

other institutions of Watershed<br />

Project.<br />

• Facilitate the conversion of various<br />

projects / schemes to IWMP.<br />

• Maintain assets registers under<br />

IWMP with a view to retain it after<br />

the project.<br />

Gram<br />

Sabha,<br />

GP, PIA<br />

and<br />

W<strong>CD</strong>C<br />

‐ 76 ‐


3. Watershed<br />

Committee<br />

Chairman of<br />

WC to be<br />

elected/<br />

appointed by<br />

communities<br />

of project<br />

area /Gram<br />

Sabha<br />

should have<br />

atleast 10<br />

members<br />

half<br />

• Provide office accommodation and<br />

other requirements to WC.<br />

• Allocate usufruct rights to<br />

deserving user groups / SHGs over<br />

the assets created.<br />

• To operate the WDF bank account.<br />

• Assist in the preparation of DPRs.<br />

• Manage the SHGs Fund.<br />

• Manage the watershed<br />

development fund ­(WDF).<br />

• Implementation of the watershed<br />

project.<br />

• Maintain the accounts of the<br />

Watershed Project.<br />

‐ 77 ‐


of the<br />

members<br />

shall be<br />

representativ<br />

es of SHGs<br />

and user<br />

group, SC,<br />

ST<br />

community,<br />

women and<br />

marginal<br />

farmers. One<br />

member of<br />

WDT to be<br />

represented<br />

in the WC.<br />

• Prepare the rules for operation of<br />

WDF.<br />

• Submit timely monthly and annual<br />

financial reports to W<strong>CD</strong>C.<br />

• Ensure that the WC annual<br />

accounts are audited on timely<br />

basis and submitted to the W<strong>CD</strong>C<br />

‐ 78 ‐


4. Secretary<br />

Watershed<br />

Committee<br />

An<br />

independent<br />

paid<br />

functionary<br />

selected by<br />

Communities<br />

of project<br />

area/ Gram<br />

Sabha<br />

• Convening of all Mandatory and all<br />

required GP, Gram Sabha and WC<br />

meetings and upkeep of minutes of<br />

the meeting.<br />

• Act as co­signatory along with<br />

WDT to operate the Watershed<br />

Development Project account<br />

• Assist in the procurement process<br />

by being designated as Secretary<br />

of the Procurement Committee<br />

• Maintain and safe custody of all<br />

records Accounts and cash.<br />

• Timely submission of all returns ,<br />

reports and utilization certificates<br />

• Timely and satisfactory Audit of GP<br />

PIA for<br />

Project<br />

reporting<br />

system to<br />

W<strong>CD</strong>C.<br />

‐ 79 ‐


accounts.<br />

• Maintain all accounts books related<br />

to the project<br />

• Make all vouchers & prepare<br />

cheques<br />

• Collect dues from beneficiaries &<br />

issue receipts<br />

• Ensure that records are maintained<br />

for all labor contributions from<br />

beneficiaries.<br />

• Prepare all financial documentation<br />

& reports as required b the project<br />

‐ 80 ‐


B. Field level institutions.<br />

Sl.<br />

No.<br />

Institutio<br />

n<br />

Composition Role Accountable<br />

to<br />

1 WDT 4­5 experts • Assist Communities of project<br />

area /GP / GS in constitution of<br />

the WC and their functioning.<br />

• Organizing and nurturing user<br />

groups and self help group.<br />

• Mobilize women to ensure that<br />

their perspective and interests<br />

are reflected in the Watershed<br />

Plan.<br />

• Assist in conducting the<br />

participatory baseline surveys<br />

training and capacity building.<br />

• Preparing detailed resource<br />

development plans.<br />

PIA & W<strong>CD</strong>C<br />

‐ 81 ‐


• Common property resource<br />

mgt and equitable sharing.<br />

• Undertake engineering surveys<br />

prepared drawing and cost<br />

estimates of any structures to<br />

be built.<br />

• Preparation of DPR<br />

• Monitoring, checking,<br />

assessing, undertaking,<br />

physical verification and<br />

measurement of the works<br />

done.<br />

• Facilitating the development of<br />

livelihood opportunities.<br />

• Maintaining project accounts.<br />

• Arranging physical, financial<br />

‐ 82 ‐


2. Project<br />

Implement<br />

ation<br />

Agency<br />

(PIA)<br />

Appointed by<br />

the SLNA<br />

and social audit of the works.<br />

• Setting up suitable<br />

arrangements for post project<br />

operation, maintenance and<br />

future development of the<br />

asset created.<br />

• Provide technical guidance to<br />

the WC/ GP for preparation of<br />

the DPRs.<br />

• Undertake community<br />

mobilization and training of the<br />

village community.<br />

• Supervise watershed<br />

development activities.<br />

• Inspect and authenticate<br />

project accounts.<br />

• Encourage adoption of low cost<br />

technologies and build upon<br />

W<strong>CD</strong>C and<br />

SLNA<br />

‐ 83 ‐


3. W<strong>CD</strong>C Appointment<br />

by<br />

SLNA<br />

Indigenous Technical<br />

Knowledge.<br />

• Monitor and review the overall<br />

project implementation.<br />

• Set up institutional<br />

arrangements for post project<br />

operation.<br />

• Submit action plan for approval<br />

to W<strong>CD</strong>C.<br />

• Submit periodical progress<br />

report to W<strong>CD</strong>C.<br />

• Arrange physical, financial and<br />

social audit of the work<br />

undertaken.<br />

• Identify potential PIAs in<br />

consultation with SLNA.<br />

• Facilitate the preparation of<br />

watershed development plan<br />

SLNA<br />

‐ 84 ‐


for the respective districts.<br />

• Provide professional, technical<br />

support to PIA in planning and<br />

execution of the projects.<br />

• Develop action plan for<br />

capacity building.<br />

• Carry out regular monitoring,<br />

evaluation and learning.<br />

• Ensure smooth flow of funds to<br />

watershed development<br />

projects.<br />

• Ensure timely submission of<br />

required documents to SLNA.<br />

• Facilitate coordination with<br />

relevant programs of other line<br />

departments with the<br />

watershed development<br />

projects.<br />

‐ 85 ‐


C. State level institutions<br />

Sl.<br />

No.<br />

1. CEO,<br />

Instituti<br />

on<br />

SLNA<br />

• Integrate watershed<br />

development project / plans<br />

into district plans of DPCs.<br />

• Established and maintain the<br />

district level data cell and link<br />

to national level data centre.<br />

Composition Role Account­<br />

Appointed by<br />

State Govt.<br />

• Prepare a perspective and SLNA<br />

strategic plan of watershed<br />

development for the state.<br />

Indicating implementation<br />

strategy, expected output,<br />

financial outlay and approach<br />

central level nodal agency for<br />

appraisal and clearance.<br />

able to<br />

‐ 86 ‐


• Establish and maintain a state<br />

level data cell and connected<br />

with national level data centre.<br />

• Provide technical support to the<br />

W<strong>CD</strong>C.<br />

• Approve and facilitate in building<br />

a state level consortium for<br />

capacity building for various<br />

stakeholders.<br />

• Approved PIAs identified /<br />

selected by W<strong>CD</strong>C.<br />

• Establish monitoring, evaluation<br />

and learning system at various<br />

levels.<br />

• Ensure regular and quality on<br />

line monitoring of watershed<br />

projects.<br />

• Constitute a panel of<br />

‐ 87 ‐


2. State<br />

Steering<br />

Committe<br />

e<br />

Conflict resolution:<br />

regard.<br />

Comprises<br />

Secretary level<br />

Officers.<br />

Chaired<br />

by the<br />

Commissioner<br />

(RD).<br />

independent institutional<br />

evaluators and get this panel<br />

approved by the Central Level<br />

Nodal Agency.<br />

• Prepared state specific process<br />

guidelines, technologies manuals<br />

etc.<br />

• Facilitate inter­departmental<br />

coordination.<br />

• Overall approval to work plans of<br />

W<strong>CD</strong>C on advices of CEO &<br />

experts.<br />

State Govt.<br />

Every attempt should be made to resolve all conflicts within the Gram Sabha and Watershed Committees. The WDT will facilitate the villagers in this<br />

‐ 88 ‐


In case of conflict among GP, WC, WDT and PIAs, the W<strong>CD</strong>C, DRDA,Tezu will act as the conflict resolution Authority. If Gram Sabha so feels that it<br />

requires formal arbitration, a three­member committee will be set up for the purpose of arbitration. It shall comprise the Officer identified in W<strong>CD</strong>C under<br />

DRDA, a nominee of the Gram Sabha and a nominee of the WDT.<br />

In the above case if either party is unsatisfied with decision of the W<strong>CD</strong>C then they can appeal to CEO. The decision of the committee at CEO<br />

advised by Chairman,level shall be final and binding on all parties.<br />

( Caution: Any correspondence to the Ministry giving wrong informations about project implementation that hinders the watershed activities without due<br />

authentication of SLNA will be rejected without any action)<br />

Institutional arrangements at village level and people’s participation :<br />

In order to implement the project in all seven (12 nos) micro­watersheds,( Wakro, Kathan, Cibi, Tilangkyong, Old Pukhuri, Towam,<br />

Tamiliang & mawai­I & adjoining areas village), an overall committee known as Watershed Committee is formed with a Chairman and Secretary<br />

assisted by executive members selected through consensus involving the village council and other eminent individuals ,women members of SHGs & PRI of<br />

the village. One of the WDT members will be an ex­officio member of the Watershed committee. The WDT Members will identify the likeminded and<br />

homogeneous group in the watershed village and form Self Help Group and Users Group. While forming SHG preferences is given to the womenfolk or poorer<br />

section of the people in the village. The formation of SHGs and User Groups (UGs) is an integral part of the programme and are directly responsible to the<br />

Watershed committee. The details of Watershed committee (WC), SHGs & UGs formed with responsibilities are as hereunder­<br />

Watershed Committee (WC) of IWMP­I­ WAKRO <strong>CD</strong> Block:<br />

Watershed Committee (WC ) , SHG & User Groups of the project area, Wakro, Kathan, Cibi, Tilangkyong, Old Pukhuri, Towam, Tamiliang & Mawai­I &<br />

adjoining areas has been constituted which is as follows­<br />

Serial<br />

No.<br />

Name Village/Posting<br />

place<br />

Designation in<br />

committee<br />

‐ 89 ‐


1 2 3 4<br />

1 Sri Balijan Krisikro Wakro President<br />

2 Sri Patam Rangmang Towam Secretary<br />

3 Sri Songep Tayang Old Pukhuri Treasurer<br />

4 Sri Madanso Tayang Mowai­I Member<br />

5 Sri Damka Gamlin,APO(RE) DRDA,Tezu Member<br />

6 Sri P.K. Rao ,EO(RE) Wakro <strong>CD</strong> Block Member<br />

7 Sri Amringlo Krisikro Tiliyangkyong Member<br />

8 Smt Angusi Janjo Kathan Member<br />

9 Smt Bajulo Rangmang Cibi Member<br />

10 Smt Natisi Ngadong Lamaliang Member<br />

N.B: (a). The Watershed Committee members formed will be only one for the entire project with sub­committees allowable for<br />

constitution at later stage if felt essential whose duties will be to suggest in implementation of project but only one account for entire area<br />

will be maintained/operated by the WC indicated<br />

(b). The WC although yet to be registered will start functioning provisionally & take up activities as per guideline in<br />

coordination with PIA/W<strong>CD</strong>C under DRDA to avoid delay<br />

SELF HELP GROUPS UNDER INTEGRATED WATERSHED MANAGEMENT PROGRAMME IN WAKRO C.D. <strong>BLOCK</strong><br />

‐ 90 ‐


(A) NAME OF SELF HELP GROUP :­WAKRO & TOWAM GROUP<br />

Serial<br />

No.<br />

Name Village Designation in<br />

Group<br />

1 2 3 4<br />

1 Sri Soleng Rangmang Towam President<br />

2 Sri Bakhreso Rangmang Towam Secretary<br />

3 Sri Kherelum Rangmang Towam Treasurer<br />

4 Sri Derem Rangmang Towam Member<br />

5 Sri Sajai Rangmang Towam Member<br />

6 Sri Somlum Rangmang Towam Member<br />

7 Sri Atengsi Krisikro Wakro Member<br />

8 Sri Bebrailum Rangmang Towam Member<br />

9 Sri Desim Rangmang Towam Member<br />

10 Sri Bebrumso krisikro Wakro Member<br />

11 Sri Bojem Mam Wakro Member<br />

12 Sri Pithamso Chiba Wakro Member<br />

‐ 91 ‐


13 Sri Gogemai Chikro Wakro Member<br />

(B) NAME OF OF SELF HELP GROUP :­LAMALIANG ,MOWAI­I &OLD PUKHURI<br />

Serial<br />

No.<br />

Name Village Designation in<br />

Group<br />

1 2 3 4<br />

1 Smt. Natisi Ngadong Lamaliang President<br />

2 Sri Sojum Ngadong Lamaliang Secretary<br />

3 Sri Sochu Ngadong Lamaliang Treasurer<br />

4 Sri Sobut Ngadong Lamaliang Member<br />

5 Sri Chibrum Tayang Mowai­I Member<br />

6 Smt Nenasi Mining Mowai­I Member<br />

7 Smt Basnti Minjng Mowai­I Member<br />

8 Smt Geeta Tayang Old Pukhuri Member<br />

9 Smt Sojem Tayang Old Pukhuri Member<br />

10 Smt Basan Tayang Old Pukhuri Member<br />

‐ 92 ‐


11 Smt Metali Tayang Old Pukhuri Member<br />

12 Smt Renamlu Tayang Old Pukhuri Member<br />

13 Smt Yunalu Tayang Old Pukhuri Member<br />

C) NAME OF OF SELF HELP GROUP :­ CIBI, TILIYANGKYONG & KATHAN<br />

Serial<br />

No.<br />

Name Village Designation in<br />

Group<br />

1 2 3 4<br />

1 Smti Bajulo Rangmang Cibi President<br />

2 Sri Proso Rangmang Cibi Secretary<br />

3 Sri Solep Rangmang Cibi Treasurer<br />

4 Sri Yamso Rangmang Cibi Member<br />

5 Sri Thangara Chikro Tillingkyong Member<br />

6 Sri Bakhyalu Chikro Tillingkyong Member<br />

7 Sri Singallum Chikro Tillingkyong Member<br />

8 Sri Kyemale Chikro Tillingkyong Member<br />

9 Sri Anumso Halai Kathan Member<br />

‐ 93 ‐


10 Sri Dekonso Halai Kathan Member<br />

11 Smt Bachanglu Halai Kathan Member<br />

12 Sri Sochium Pul Kathan Member<br />

USER GROUPS UNDER INTEGRATED WATERSHED MANAGEMENT PROGRAMME IN WAKRO C.D. <strong>BLOCK</strong> :­<br />

NAME OF USER GROUP :­WAKRO & TOWAM GROUP<br />

Serial<br />

No.<br />

Name Village Designation in Group<br />

1 2 3 4<br />

1 Sri Balijan Krisikro Wakro President<br />

2 Sri Patam Rangmang Towam Secretary<br />

3 Sri Bakheso Rangmang Towam Treasurer<br />

4 Sri Khereloem Rangmang Towam Member<br />

5 Sri Solong Rangmang Towam Member<br />

6 Sri Atengsi Krisikro Wakro Member<br />

‐ 94 ‐


7 Sri Pethonso Chiba Wakro Member<br />

8 Smt Dasalu Krisikro Wakro Member<br />

9 Smt Monslu Tamblu Wakro Member<br />

10 Smt.Bakhamlu Ngadong Wakro Member<br />

11 Sri Sadimso Rangmang Towam Member<br />

12 Sri Desim Rangmang Towam Member<br />

(B).NAME OF USER GROUP :­OLD PUKHURI,LAMALIANG AND MOWAI­I<br />

Serial No. Name Village Designation in<br />

Group<br />

1 2 3 4<br />

1 Sri Songep Tayang Old Pukhuri President<br />

2 Sri Khubram Tayang Old Pukhuri Secretary<br />

3 Sri Sombey Tayang Old Pukhuri Treasurer<br />

4 Sri Dangsolum Tayang Old Pukhuri Member<br />

5 Sri Sojem Tayang Old Pukhuri Member<br />

‐ 95 ‐


6 Sri Madanso Tayang Mowai­I Member<br />

7 Sri Chibrum Tayang Mowai­I Member<br />

8 Smt. Nanasi Mining Mowai­I Member<br />

9 Smt. Basanti Mining Mowai­I Member<br />

10 Sri Sanjay Ngadong Lamaliang Member<br />

11 Smt Natisi Ngadong Lamaliang Member<br />

12 Sri Sobrem Ngadong Lamaliang Member<br />

(C )NAME OF USER GROUP :­ TILIYANGKYONG & KATHAN, CIBI<br />

Serial<br />

No.<br />

Name Village Designation in<br />

Group<br />

1 2 3 4<br />

1 Smt Bajulo Rangmang Cibi President<br />

2 Sri Sokhailu Rangmang Cibi Secretary<br />

3 Smt Sorow Rangmang Cibi Treasurer<br />

4 Sri Sosanlum Rangmang Cibi Member<br />

5 Sri Amringlo Krisikro Tiliyangkyong Member<br />

‐ 96 ‐


6 Sri Mysu Appa Tiliyangkyong Member<br />

7 Sri Badeir Chikro Tiliyangkyong Member<br />

8 Sri Ehu Krisikro Tiliyangkyong Member<br />

9 Sri Babilu Chikro Tiliyangkyong Member<br />

10 Sri Bakheo Halai Kathan Member<br />

11 Smt Angusi Janjo Kathan Member<br />

12 Sri Singkha Halai Kathan Member<br />

13 Sri Banepso Pul Kathan Member<br />

7 Sri Amringlo Krisikro Tiliyangkyong Member<br />

8 Smt Angusi Janjo Kathan Member<br />

9 Smt Bajulo Rangmang Cibi Member<br />

10 Smt Natisi Ngadong Lamaliang Member<br />

‐ 97 ‐


Objectives of Detailed Project Reports :<br />

(i) At the overall watershed level, to have a plan that identifies key problems, intervention areas, and objectives and the mechanisms to achieve<br />

them. Ideally the DPR would be developed through a participatory process.<br />

(ii) At the micro­watershed level, to engage in dialogue with stakeholders to identify different or conflicting interests, to evaluate possible synergies<br />

and the minimum tradeoffs required, and to identify a set of options to achieve both broader public interest objectives and local objectives while<br />

doing so the convergence areas would also be kept in view.<br />

(iii) The water usage being an important component in the watershed management under the perspective plan, appropriate mechanisms of recovery<br />

of user charges would be brought in place to ensure sustainability. While doing so, possibilities of payment for watershed services would also be<br />

explored;<br />

(iv) Participatory approaches to developing and adopting new technologies;<br />

(v) A sound social analysis, such as a stakeholder analysis aimed at assessing losses to be incurred by different community groups because of<br />

conservation practices;<br />

(vi) A focus on generating positive income streams for farmers and other groups (such as herders) through intensification, diversification,<br />

downstream processing and marketing, and the creation of new income­generating activities;<br />

(vii) Giving stakeholders a secure stake in common pool resources, such as forest and pastures, and ensuring that all users and especially the poor<br />

have viable income alternatives when closure in involved;<br />

(viii) Promoting interventions that reduced risk, such a improving water sources; and<br />

(ix) Identifying conservation techniques that were profitable for farmers and offering a menu of interventions combining income and conservation<br />

objectives.<br />

Preparation of Action Plan:<br />

Based on the database compiled through various modes, site specific Action Plan is prepared solely using the participatory approach. Prioritization<br />

of action will be carried out taken into consideration the local needs and priorities.<br />

The approved area is to be treated in phased manner with in a period of 4 years which can be extended upto 7 years maximum subject to<br />

approval of SLNA on reasonable grounds. All these lands would be developed, but the priority would be to cover the untreated area. The duplicity and<br />

overlapping will be avoided for sustainable development of the proposed areas, the community action through demographic process would be ensured in all<br />

‐ 98 ‐


the stages of the project, right from framing Action Plans, their execution, sharing of usufructs and their long term sustainability. The local communities have<br />

been organized into Self Help Groups / User Groups. Other Income generating activities for increase in the economic status of the watershed community will be<br />

propagated and necessary financial support will be provided from the project fund for income generation of converging the funds from ongoing other schemes.<br />

STRATEGY <strong>FOR</strong> WATERSHED DEVELOPMENT:<br />

Watershed management’s underlying principle is that people, land and water are connected. People use land in a variety of ways, and affect<br />

ecosystems, and ultimately, their own communities for better or worse. Managing and protecting the environment while providing a high quality of life for<br />

people is a complex process that is most successful when governing bodies, community members and experts in various fields are true partners in the planning<br />

process. It shall be the endeavor of the watershed management approach to bring all these factors together to provide long­term well being for communities<br />

by integrating people, land and water in a watershed area.<br />

It is often seen that within any watershed, there are natural resources that have both ecological and economic value. Human activities can affect<br />

those resources, often with unintended consequences. It is therefore important to work on a watershed approach that recognizes those consequences by<br />

seeing the entire system in a holistic manner rather than considering each aspect independently as was the case with watershed programme earlier. It would<br />

aim at developing strategies to manage resources and human activities in a coordinated way. Its focus will be on integration of the efforts of landowners, land<br />

use agencies, water management experts and communities. Institutional arrangements will be put in place in a way that these stakeholders work together to<br />

ensure proper stewardship of our natural resources, compliance with regulation and efficient management. The underlying purpose is to strive towards<br />

efficient, sustainable and intelligent solutions to our watershed issues: land use, water supply, water quality, storm water runoff, water rights, air quality,<br />

planning and utilization. The watershed approach changes this mindset to develop recognition among members of a community of the value of their own<br />

resources, and to guide a holistic, balanced program of stewardship that achieves community goals while complying with rules. A watershed approach<br />

integrates biology, chemistry, hydrology, economics and social considerations into decision­making. It recognizes needs for water supply, water quality, flood<br />

control, navigation hydropower generation, fisheries, biodiversity, habitat preservation, recreation, and development; and it recognizes that these needs can<br />

compete. It establishes local priorities, accounts for state and national goals and coordinates public and private actions.<br />

1. Philosophy:<br />

‐ 99 ‐


While traditional approaches are reactive, precautionary, regulatory, single­purpose and driven by enforcement, watershed management plan aims at<br />

making it proactive, scientific, uses agreement­based approaches to achieve multiple benefits and is driven by the self­interest of stakeholders.<br />

Watershed protection measures seek to stop or reduce pollution and prevent degradation. Measures that prevent degradation before it occurs typically<br />

cost less than restoration measures implemented after watershed are impaired. When restoration is required, it is more challenging to establish<br />

acceptable and measurable goals. This is where stakeholder collaboration is most essential. Some will see restoration as the re­establishment of pre­<br />

disturbance aquatic function, but others may focus more on recreation, flood protection, or water use efficiency. It is critically important that<br />

stakeholders work out a balance among competing “public goods”, which no single discipline is equipped to achieve.<br />

In a mountainous district like Kurung Kumey where the vast majority of population has been dependent on natural resources for their<br />

livelihoods, “development” will have to be based primarily on long­term sustainable productivity enhancement and, on increasing the dependability of<br />

production and, consequently, the security of livelihoods. The interconnectedness of the biophysical and the social is intrinsic to watershed development<br />

and draws strength from this interconnectedness. The plan sites on the principle that biophysical and social interventions are not two separate<br />

processes, but aspect of a single unified process and ecosystem processes and resources are basic economic resources as well.<br />

A review of watershed development projects in the district & block in particular highlights an immediate need to re­orient the present<br />

approach to watershed development and put an enabling policy framework in place to ensure that watershed development programmes adequately<br />

meet the requirement of the four central concerns namely sustainability, livelihoods, equity and participation / self –governance. Previous studies have<br />

concluded the following drawbacks in approach and implementation:<br />

• Problems related to lack of coordination (timely information transmission , UCs , Audits ,online reporting & release of funds).<br />

• The needs to help community catchments group mature;<br />

• Confusion between bottom up consultation and community participation and top down policy and government investment;<br />

• The lack of integration of economic development with ecological management;<br />

• Institutional barriers to effective integration; and<br />

‐ 100 ‐


• The effectiveness of local community institutions ( complaints/counter complaints)<br />

Thus, need for a reorientation of approach to watershed development based on the following: a sustainable productivity enhancement<br />

orientation: proactive measures to deal with sustainability and equity issues resources: making adequate technology choices; and taking dependability<br />

into account in watershed planning is attempted through this project.<br />

There is also an urgent need for an enabling policy framework for collective regulation of groundwater use and eventually moving towards<br />

Integrated water Resource Management. Many policies, which may not be directly related to watershed development programme per se, also impinge<br />

on the outcomes, e.g. tourism Hydro Power, Industry and electricity tariffs, irrigation policy, agriculture research and extension policy, fertilizer and<br />

agricultural produce pricing and forest policy. There is also a need to restructure the watershed development program by increasing the watershed<br />

development allocation and period and conduct it in phase. The areas that need particular attention are:<br />

(i) Hydrological: (a) cross­scale and inter­scale hydrological effects (upper to valley portions, intra­ and inter­watershed relations up to basin<br />

scale); (b) surface water groundwater interactions; (c) aquifer behavior, in particular balance between shallow and deep aquifers, their size,<br />

recharge rates, locations, and so on; (d) net effect of different soil and water conservation measures as well as afforestation and agricultural<br />

practices on quantities like infiltration and erosion under different geophysical conditions.<br />

(ii) Land­Vegetation­Water interactions: (a) agro ecological relationships and impact on one another as an ecosystem; (b) grazing and forest<br />

management, in particular productivity, sustainability, and offsite effects.<br />

(iii) Socio­Economic and Institutional aspects: (a) compare asset­based approaches with income based approaches, in terms of benefits, their<br />

distribution and sustainability; (b) scope for biomass­based value addition­ biomass, labour, energy, capital and financial requirements and<br />

identification of possible bottlenecks; (c) scope of watershed and NRM­based development in different regions, limits and implications especially<br />

in resource poor areas; (d) indigenous knowledge, its scope, and issues in its interface with modern knowledge; (e) role of CVOs and SHGs in<br />

improving participation and sustaining benefits beyond project period; (f) ways of better addressing the problem of local heterogeneity by<br />

equitable and sustainable reconciliation of interests and conflict resolution; (g) social and institutional mechanisms and capability building for<br />

incorporating rigorous participatory grassroots benchmarking monitoring and assessment in watershed based development programmes.<br />

2. Approach for watershed management:<br />

‐ 101 ‐


Based on the experiences of implementation of watershed management project in the State/district and elsewhere in India, it proposes to use<br />

watershed development as an opportunity to combine and integrate water conservation with livelihood concerns. Enhancing sustainable livelihood option of the<br />

people shall be the key objective in Watershed activities. The goal of watershed development would be sustainable productivity enhancement and consequent<br />

increased livelihood option for the local community. As opposed to the traditional water conservation approach which focused on minimization of run­off as a<br />

unilinear strategy, the new approach will aim at productivity oriented hydrological planning approach that maximizes agriculture and other bio­mass production<br />

within the limits of water availability and promotes agronomic practices with sustainability and equity as the key concerned.<br />

The following aspects will constitute the key elements of the approach followed for watershed development:<br />

(i) Interconnectedness of the bio­physical and the social aspects.<br />

(ii) Fulfilling livelihood needs.<br />

(iii) Sustainability.<br />

(iv) Equity.<br />

(v) Participation.<br />

(i) Interconnectedness of the bio­physical and the social aspects.<br />

The process of watershed development plan keeps the element of interconnectedness of bio­physical and the social aspects as intrinsic to the<br />

very concept of watershed development. The underlying philosophy reads watershed as a bio­physical entity in an eco system comprising of all<br />

bio­physical processes within the watershed and their interaction with large systems. Bio­physical and Social interventions are actually not two<br />

separate processes but aspects of the same unified process. What appears as a soil erosion in the case of bio physical process would appear as<br />

inability to meet food needs in the social aspects due to reduced farm productivity. Likewise, purchase of fertilizer may be an aspect of bio<br />

physical intervention but the resultant pollution would be the social implication of the same. The strategy proposed to be adopted would therefore<br />

keep this bio physical and social aspect in view in deciding technological interventions.<br />

‐ 102 ‐


(ii) Fulfilling Livelihood needs:<br />

(iii) Sustainability:<br />

(iv) Equity:<br />

A Livelihood comprises the capabilities, assets and activities required for a means of living. A livelihood is sustainable when it can cope with and<br />

recover from stresses and shocks and maintain or enhance its capabilities and assets both now and in the future, while not undermining the<br />

natural resource base. The interventions would be so designed that result in fulfilling minimum livelihood needs consisting of domestic water<br />

(including drinking water and water for livestock), food, fuel, fodder, some bio mass in put to the agriculture system to maintain soil productivity<br />

and other goods and services that may have to be obtained from the larger system, for example, health and education.<br />

Maintaining and enhancing the products and assimilative (as sinks) potential of the local eco system would be the objective to be achieved<br />

through using water within renew ability limits, enhancing and sustaining the productivity of crop land uncultivated land and enhancing<br />

dependability of availability of resources, for instance water.<br />

The fulfillment of livelihood needs depends crucially on who has access to how much and what kind of productive resources thereby bringing the<br />

element of equity to the watershed management. The equity may have several dimensions including intra generation distribution of human well<br />

being across barriers of class, ethnicity and gender. Concerns about special or locational inequality in the level of development require distribution<br />

fruits of development equally in different region. In the context of water availability inter­sectoral equity also becomes relevant. Often, the<br />

prioritization of water availability follows the following sequence namely: drinking water: water for domestic use and for cattle: water required for<br />

eco system regeneration and for livelihood activities: and surplus / extra that could be used for cash or commercial crop. The impact of<br />

watershed development on all the dimensions of equity will be an important evaluating criterion of success of the programme.<br />

‐ 103 ‐


(v) Participation:<br />

The approach followed in watershed development will see participation as a goal of a development (decentralized) process in that it helps<br />

communities make informed choice and also as a mean of more equitable, sustainable and efficient outcome. The emphasis will be on creation or<br />

enhancement of genuine participated democracy at the grass roots. Participation is seen as a means to enable the local community to make<br />

informed choice and ensuring more equitable, sustainable and efficient outcomes. However, it is important to view critically the constituents of<br />

local community that are engaged in the decision making process. General expectations are that homogenous societies would respond vary<br />

differently to opportunities of participation available within the framework of watershed programmes as compared to heterogeneous societies.<br />

Since, in their current form, the Watershed Development Programme necessarily require partnership in some form with outside agencies<br />

(governmental and non­governmental organizations, international donors etc), the nature of this collaboration is bound to affect the efficiency of<br />

the participation, communities within the watersheds. In this context, the increased importance of the institutions of local self­government<br />

Panchayats as brought about by the Hariyali Guidelines and further refined under common guidelines with watershed committee (WC) is expected<br />

to change somewhat the participatory dynamics.<br />

3. Implementation Strategy:<br />

(a) Integrated Watershed Management:<br />

Watershed Management has evolved and passed through several developmental stages. In the initial stages, it was confined to soil<br />

conservation mainly handled through Agriculture and Forest Department with little or no involvement of people. During the second stage, it<br />

became land resource management related, including activities with an eye on economic benefits. At this stage, the focus was on beneficiaries.<br />

Under the proposed DPR, it is intended to be made participatory and integrated watershed management with involvement and contribution from<br />

local people. The emphasis will be on making watershed natural processes. Hence, this report incorporates ways of integrating natural resource<br />

‐ 104 ‐


management with socio economic development, sustainable livelihood and poverty alleviation. Special attention will be given to strengthening the<br />

capacity of local actors to manage the three main components of watershed management namely land management, water management and<br />

biomass management will be kept in focus.<br />

The land management will incorporate major land characteristics like terrain slope, formation, depth, texture, moisture and infiltration rate<br />

and soil capability of the proposed project area. Necessary interventions of different kind like structure measures, vegetative measures,<br />

production measures and protection measures will be taken depending upon the sight requirement. Structural measures will include interventions<br />

like contours bunds, stone bunds, urban bunds, compartmental bunds, contours terrace walls, stream bank stabilizing, contour trenches, bench<br />

terracing and check dams etc. Where watershed contain natural ecosystem like grass land, wet lands mangroves, marshes, water body,<br />

appropriate vegetative measures will be planed to provide vegetative cover, hedges, grass land management and agro forestry etc. Linkage of<br />

watershed activities with appropriate agricultural practices is an important dimension of the watershed management.<br />

Economic use of water and avoidance of affluence in use of water at individual and community levels will be a major concern for water<br />

management under this report. Water characteristics like inflows (specification, surface water inflow, ground water inflow) water use<br />

(evaporation, evapotranspiration, irrigation, drinking water) out flows (surface water out flow, ground water out flow) storage (surface storage,<br />

ground water storage, root zone storage) are the principle factors to be taken care of in sustainable water management. The broad intervention<br />

for water management to be planned under the reports for each site shall be rain water harvesting, ground water recharge, maintenance of<br />

water balance, preventing water pollution and economic use of water. Rain water harvesting forms the major component of water management.<br />

The rain water collected can be recharged into the ground. Roof top water harvesting, diversion of peremmial springs and streams into storage<br />

structures, farm ponds etc. will also be used for rain water harvesting. Along site, water harvesting, appropriate measures will be planned to<br />

ensure economic use of water. One such most effective measures is often the introduction of user charges for water usage to recover operating<br />

cost and at the same time introduce behavioural change among the water users by incorporating cost of water in their usage decision.<br />

Under the integrated watershed, bio­mass management is an important area of concern. Under the traditional approached followed as far<br />

in distict, no efforts have been made to establish clear cut linkage between land management, water management and the bio­mass<br />

management. Resultantly the water management structures have often ended up as stand alone intervention in any area without a clear linkage<br />

without a clear forward and backward linkage in terms of land management and in terms of bio­mass management. Both land management and<br />

‐ 105 ‐


a bio­mass management outcome in fact becomes the key indicator of the watershed management performance in any area. Appropriate biomass<br />

intervention namely eco preservation, biomass regeneration, forest management and conservation and plant protection and social forestry will be<br />

planned for each area.<br />

Institutional Strengthening:<br />

(i) Capacity building of Gram Panchayats and local community institutions:<br />

Under this sub­component, the core administrative capacity of GPs in planning, budgeting, financial management, implementation and<br />

reporting would be strengthened .Capacity will also be built in other tiers of PRIs (block and district) as needed to ensure efficient and effective<br />

functioning of the project. However, the initial capacity building strategy for the project will be focused on GPs and will include programs for GP<br />

elected officials community representatives,WC, SHGs, NGOs and the watershed staff involved in project related activities. The capacity building<br />

strategy focuses on: (i) enhancing technical skills in watershed management: (ii) improving level of information at the community level on the<br />

project and other relevant issues: (iii) training all stakeholders in applying the technologies: and (iv) institutionalizing a performance appraisal and<br />

reward system for the GPs and watershed management development staff in the project..<br />

(ii) Information, Education and Communication:<br />

This sub­component is designed to implement a strategy that identifies specific audiences and develops targeted messages to increase<br />

general awareness about the project, term of participation and overall transparency. The strategy would target the general public and the state’s<br />

political establishment; staff who would be implementing the project, NGOs, GPs, and communities. The media would include traditional folk<br />

theatre and dance, print media and audio­visual.<br />

(iii) Project coordination, monitoring and management:<br />

‐ 106 ‐


This will finance organizational change management initiatives to realign the WMD to the new implementation arrangement and the<br />

increased role of GPs & need of WC for the project. Under project monitoring, links would be developed between the MIS, GIS and impact<br />

evaluation, participatory monitoring of the project activities by the communities would be introduced in addition to the tracking of physical and<br />

financial milestones. This sub­component will also finance rent of appropriate office and / or residential space in nearby towns. Finally, the<br />

subcomponent will finance incremental operating costs of the project office.<br />

Monitoring and Evaluation:<br />

An effective monitoring and evaluation strategy needed to capture trends in benefits capture and other social impact as they emerge.<br />

Without such monitoring systems in place that make the distribution of benefits and social impacts explicit, it is likely that current intervention<br />

cause problems for certain social groups and further existing inequalities. Continuous monitoring also enables continuous re­planning: a<br />

prerequisite to adaptive management in that reality encountered during implementation do not always reflect best approaches as prescribed early<br />

in the planning process and therefore, require continuous adaptation. Appropriate socio culture, economic and environmental indicators will be<br />

developed with a definite time frame to measure performance the socio culture indicators under the following heads will be specially developed to<br />

ensure participation and equity:<br />

• Decision making power of the community:<br />

• Empowerment of women;<br />

• Formation of farmer groups / self help groups;<br />

• Change in ownership of land;<br />

• Improvement in quality of life;<br />

• Harmonious social life.<br />

The economic indicators would include factors required for livelihood and economic well being of the people consisting of:<br />

• Increase in income level;<br />

• Availability of food and food security;<br />

• Improvement in the standard of living;<br />

‐ 107 ‐


• Off­farm income to family;<br />

• Improvement in rural economy;<br />

• Improvement and credit and market support.<br />

Environment indicators would include tangible and non tangible factors influencing the ecology of the community, for example, increase in<br />

productive potential of source base, management of common property resources and improvement in bio­diversity.<br />

Monitoring and Evaluation System:<br />

The Monitoring and Evaluation system shall have five distinct components, namely<br />

• Baseline Study­ for assessing the pre­project condition.<br />

• Performance monitoring­ management Information System based input system to track the progress and performance on a periodic<br />

basis.<br />

• Institutional Performance monitoring­ Internal and External process monitoring to track the processes (to provide leads and direction<br />

on the progress towards the achievement of the various end results of the project component) and Comprehensive group, self –<br />

monitoring system for tracking institutional development at community based organizations.<br />

• Internal Learning­ Internal management review and learning system ( monthly review the implementation and monthly reporting by the<br />

project staff at various level particularly at district, block and village level).<br />

• Evaluation­ External impact evaluation involving mid­term review and impact assessment (by independent agency). Each evaluation will<br />

include physical, financial and social audit of the work done and to assess the status of watershed related intervention as per procedure of<br />

new guidelines. The department has already constitute d the panel of reputed institutes / organizations having sufficient expertise and<br />

infrastructure for national panel of evaluating agency as well as for empanelment as evaluator for watershed development programme of<br />

the State.<br />

The panel of such institutes / organization forwarded to the DOLR, GOI after approval and concurrence of the State level Nodal<br />

Agency are­<br />

1). The Joint Director, ICAR, West Siang, Basar, Arunachal<br />

‐ 108 ‐


Pradesh<br />

2). The Director, State Institute of Rural Development,<br />

Itanagar, Arunachal Pradesh.<br />

3). The Director, North Eastern Regional Institute of Science<br />

& Technology,Nirjuli,Arunachal Pradesh.<br />

Similarly the evaluation and impact studies will be carried out to ensure the quality and benefit from the interventions carried out in Project<br />

areas. The Evaluation would be carried through independent agencies approved by the State level Nodal Agency and department Nodal Agency at Central<br />

level. The Physical, Financial and Social Audit of work done would be ensured under each evaluation. The concurrent and post project Evaluation would<br />

be conducted to assess the status of Watershed related interventions. The expenditure under this head will be restricted as per admissibility in the<br />

guidelines<br />

Entry Point Activity:<br />

Under Entry Point activity the priority would be to ensure the sufficient water availability to the local community by revival of traditional<br />

water sources .Repair, restoration and up gradation of existing common property assets like Water supply platforms, well, Nyaakum ( site local type hut<br />

for use by WC/SHG), community buildings(Dere) /assets ­ cc footpaths/link ,earthen roads to project sites etc. would be taken up. The village level<br />

institutions such as watershed committees, self help group and user group will be strengthened under this head. All such type of activities which will<br />

help community participation in watershed development programmes will be covered under this component. But it will be ensured that the expenditure<br />

under this component may remain within the prescribed ceiling i.e. 4%.<br />

‐ 109 ‐


Convergence:<br />

One of the important components of integrated watershed management is main streaming the watershed planning and management by<br />

developing appropriate interface with other ongoing developmental programmes. The possibilities of identifying and deriving support from other line<br />

department can be sub divided into the following categories:<br />

(a) Infrastructure Development;<br />

(b) Productivity Enhancement;<br />

(c) Off Farm initiative.<br />

(d) Livelihood Support<br />

(e) Weaker Section (marginal farmers) Support;<br />

(f) Quality of Life.<br />

(g) Capacity Building.<br />

I. Infrastructure Development<br />

Among the major infrastructure activities that will be taken up within the watershed areas are Construction of Link Roads/ CC footpath and<br />

Provision of Irrigation Facilities. Among the schemes that are currently handled by various departments and could be tapped for supplementing resources are:<br />

Table: Infrastructure convergence frame work<br />

Sl.No Activity Name of the Scheme Nodal Department<br />

1. Road PMGSY RWD<br />

2. Empowerment<br />

Generation, Link<br />

Road, CC<br />

footpath, Check<br />

NREGA DRDA/<strong>CD</strong> Block under<br />

RD.<br />

‐ 110 ‐


Dam, Land<br />

3.<br />

development etc.<br />

Water Supply AWRSP PHE<br />

4. Irrigation Medium Irrigation, flood<br />

Protection, Lift Irrigation<br />

Scheme<br />

WRD<br />

5. Marketing<br />

Infrastructure<br />

Vikas Mein Jan Sahyog Planning<br />

6.. Infrastructure<br />

Development.<br />

Local District Planning Planning<br />

II. Productivity Enhancement:<br />

Majors aimed at productivity enhancement will require interventions in the form of soil conservation, soil quality improvement, improved seeds<br />

and fertilizers, Farm technology equipments, changes in cropping pattern and multiple cropping etc. Some of the existing schemes of the various department<br />

are:<br />

Table: Schemes for productivity enhancement:<br />

Sl.<br />

No<br />

Activity Name of the Scheme Nodal<br />

Department<br />

1 Distribution of improved<br />

seeds<br />

Agriculture inputs Agriculture<br />

2 Fertilizer Agriculture inputs Agriculture<br />

3 Insecticide and Pesticide Agriculture inputs Agriculture /<br />

‐ 111 ‐


4 Poly houses Horticulture technology<br />

Mission (HTM)<br />

III. Non­Farm Initiative:<br />

Horticulture<br />

Horticulture<br />

One of the major causes of natural resources degradation is excessive dependence on land and natural resources. Therefore, development of<br />

non­farm sector activities is crucial to a sound natural resource management strategy. Among the activities that could be started are:<br />

Table: Scheme for non­farm initiative:<br />

Sl. No Activity Name of the Scheme Nodal<br />

Department<br />

1 Micro and Small<br />

Enterprises<br />

(i) Rural Industrial programme<br />

(RIP), Rural Artisan programme<br />

(RAP), Handloom, Textile &<br />

Handicrafts.<br />

(ii) Prime Minister Employment<br />

Generation programme (PMEGP)<br />

(iii).Self Employment Scheme<br />

(Plumbing, IT Training, Mobile<br />

Repairs etc).<br />

Industries<br />

,Handloom &<br />

Texiles &<br />

Handicrafts.<br />

KVIC<br />

‐ 112 ‐


2. Rural Tourism and<br />

Hospitality related<br />

enterprises<br />

Livelihood Support:<br />

(iv) Loan to OBC people on<br />

Lower interest (6%)<br />

Home Stay Scheme, Sumo<br />

Services etc.<br />

SC/ST<br />

Corporation.<br />

Tourism,<br />

The average size of land holding is low especially in high hills of the district. Terrace farming is widely practiced. Due to difficult terrain, road<br />

connectivity is not always good and health infrastructure is poor. Drinking water and electricity facilities are available to the majority of households. There are<br />

high dependence on forests property and water resources. The best terms in this zone come from fruits. However marginal farmers depending on subsistence<br />

agriculture produce at least four­five months a year. The food insecure months are from May to July. The poor people supplement their income from wage<br />

labour in contract, other labour work under any scheme of the State Government / GOI, in their adjoining local areas. Some villages are also supplementing<br />

their income by selling their livestock’s and their produce such as of pigs, Goats, Sheep and wool, milk etc. Diary products consumption is less due to low<br />

productivity of milk from local breed milch cattle’s<br />

On the whole, there is a dominance of marginal farmers who face several problems including lack of irrigation, poor quality lands, fragmentation,<br />

weather shocks and in many remote locations poor access to state and marketing infrastructure.<br />

The separate provision of funds to cover livelihood components to generate extra income of the poor inhabitants in the rural area made in the<br />

common guidelines for watershed development projects & commitment of State Govt to enhance the livelihood opportunities in the rural areas of the State by<br />

providing sufficient water potential and other avenues in the field of horticulture forestry, mushroom cultivation, sericulture, animal husbandry etc.<br />

In the implementation of watershed development project the priority would be the harvesting of rain water with active participation of village<br />

communities. By creating irrigation potential, the coordination between the line department who are associated with agriculture and allied activities will be<br />

ensured to provide the latest technology and other available benefits to the watershed community. Presently some schemes for the benefit of individual<br />

‐ 113 ‐


farmers in the field of Agriculture, Horticulture technology Mission, and NREGA etc are being implemented in rural areas of the State. The other benefits for<br />

forward­backward linkages to the rural families will be provided out of watershed funds for upliftment of their socio­economic condition. The assistance for<br />

poor people would be given to village and cottage industries, and small scale business activities. The possibilities of marketing potential will be explored and<br />

the watershed community will be motivated for growing of marketing based produce to get maximum benefit.<br />

Weaker Section Support:<br />

Particular attention to be given true address to the problem of weaker sections of the society amongst SC/ST, backward Classes, woman, BPL families and<br />

households. The main departments catering to these categories under the existing schemes are Welfare department. Rural Development Department,<br />

Education and food supplies Department. Among the schemes operated by these are:<br />

Sl. No Activity Name of the Scheme Nodal Department<br />

1 Construction of<br />

Houses<br />

IAY and Housing Scheme for<br />

SC / STs for the Welfare<br />

department.<br />

2 Self Employment SGSY RD<br />

3 Education and<br />

Trainee<br />

Free text books, scholarship<br />

scheme for different categories<br />

of students, Mid­day Meal<br />

scheme, computer Literacy<br />

Moduler Employable Scheme,<br />

Training under different trades<br />

RD and Welfare<br />

Department<br />

Education<br />

Department<br />

‐ 114 ‐


Quality of Life:<br />

through ITI<br />

Technical<br />

Education<br />

Improvement in Socio­economic indicator which is an important factor for performance under integrated watershed management could only be<br />

achieved if the activities contributing to improvement in quality of life could be integrated with the watershed development plan. Among the main activities<br />

under this section would be:<br />

Sl. No Activity Name of the Scheme Nodal Department<br />

1 Maternal and Child<br />

Health<br />

I<strong>CD</strong>S Welfare<br />

2 Preventive health NRHM Health<br />

3 Sanitation TSC PHE<br />

4 Education SSA Secondary<br />

Education<br />

Capacity building:<br />

‐ 115 ‐


The capacity building strategy and action plan of the project aims to build the competence and capability of targeted village communities including<br />

the poor, their organization and the GP so as to collectively enable them to achieve the project objectives.<br />

The main objectives are as under­<br />

• Strengthening knowledge base.<br />

• Increasing awareness.<br />

• Enhancing skills.<br />

• Developing ability to train further.<br />

• Developing share vision.<br />

• Developing confidence and self esteem.<br />

The training, Workshop, Seminars, exposure / Exchange visits, Demonstration, Tele­conferencing, on the job support etc will be the tools for<br />

capacity building of all the stakeholders. The capacity building needs of the various stakeholders and their capacity building requirements are tabulated<br />

below:<br />

Stakeholders and capacity building requirements:<br />

Project Stakeholder Critical Capacity Gaps<br />

Target Community • Participatory Watershed Development and<br />

Livelihoods Planning Livelihoods Skills<br />

• Livelihoods Skills<br />

• Project Provisions<br />

GPs • Project management (planning and<br />

implementation)<br />

• Inclusive of the needs of the poor.<br />

• Project provisions.<br />

‐ 116 ‐


Gram Panchayat<br />

Committee<br />

SHGs • Group Dynamics.<br />

• Funds Managements<br />

• Marketing Awareness<br />

• Post Project sustainability and exit<br />

protocol.<br />

• Project management (planning and<br />

implementation)<br />

• Inclusive of the needs of the poor.<br />

• Project provisions.<br />

• Post Project sustainability and exit protocol.<br />

User Group • Planning, implementation, Operations,<br />

Maintenance<br />

• Project provision.<br />

• Project Process<br />

Watershed Dev. Team<br />

Member<br />

Project Implementing<br />

Agency<br />

• Para­skill<br />

• Project provisions.<br />

• Project implementation process.<br />

• Business promotion and marketing.<br />

• Watershed development Plan.<br />

• Participatory Natural Source Management.<br />

• Formations of watershed Committees<br />

• Institutional building<br />

• Community learning<br />

• Project provisions<br />

‐ 117 ‐


Watershed<br />

Committees<br />

• Project process<br />

Strategies for Capacity Building:<br />

• Community Mobilization & community Learning.<br />

• Implementation Process<br />

• Project rule, Financial rule and budgeting process.<br />

• Exit Protocol System<br />

• Livelihoods enhancement<br />

• Business promotion<br />

• Marketing<br />

• Convergence.<br />

The various strategies that could be adopted for building the capacities of the various stakeholders are as follows­<br />

(i) Gradual scaling up – A phased approach for implementation of the project in different batches so as to provide opportunities to learn by<br />

experiences would be followed. For the subsequent batches of GPs / WCS the previous GPs / WCS will serve as learning grounds for building<br />

their capacities.<br />

(ii) Experiential learning­ The capacity building approaches will focus on all opportunities of experiential learning including interactive learning<br />

and exposure visits. Reviewing and sharing of project learning will be an important element of CB strategy.<br />

(iii) Internalizing Capacities locally­ For building the capacity of GP members / WC members, SHG and UG members so as to empower the<br />

community organization to manage their livelihood affairs by themselves, the funds will be provided as per provision of guidelines.<br />

Capacity Building Programs:<br />

In order to accommodate the capacity building needs of all the stakeholders of the project and also meet the demanded capacity needs during the<br />

evolving later stages of the project, the following broad capacity building programs have been identified.<br />

‐ 118 ‐


Various capacity Building programs:<br />

Sl.<br />

No<br />

1 Sensitization<br />

programs<br />

2 Induction<br />

programs<br />

Programs Participants Key Contents Tools<br />

3 Orientation<br />

programs<br />

Community, GP, WC<br />

and PIAs<br />

Project management<br />

staff and WC team<br />

members<br />

Empanelled<br />

appraisers outsource<br />

technical service<br />

providers, resource<br />

agencies, line<br />

department<br />

Innovative project<br />

approaches and<br />

key project<br />

principles<br />

Project principles<br />

community manual<br />

participatory,<br />

methodologies<br />

Livelihood Planning<br />

process, SHG<br />

formation<br />

Key Project<br />

Principles project<br />

institutional model<br />

project processes<br />

Workshop /<br />

Campaigns<br />

Training on<br />

COM, Field<br />

placement /<br />

village<br />

immersion<br />

programs<br />

Workshops<br />

Field visits.<br />

Sensitization on the issues of gender, environments, tribal etc. will be part of all the programs mentioned above.<br />

Institutional arrangements for Capacity building:<br />

‐ 119 ‐


State Level:<br />

The following arrangements for capacity building of project stakeholders will be made.<br />

The State level Resource Agencies will be utilized to train the State level and District / block level key staff and will hire appropriate physical facilities to<br />

undertake state level training programs and workshops. Appropriate national level institutions will be identified to run thematic training programs as and when<br />

required which will also be followed by refresher programs. Periodic exposure visits will be undertaken to learn from experience of similar projects being<br />

implemented in other States. A National Level pool of resource persons will be identified to run workshops and short­term programs for state level specialist.<br />

Capacity building service providers at District and Block Level:<br />

The project will hire the services of capacity building agencies to plan and implement capacity building activities at District, Block and Gram<br />

Panchayat level. The primary task of the capacity building agencies will be to impact required knowledge altitude and skills to the PIAs, WDT members and<br />

WDC Teams. In addition, these agencies will design and implement specialized programs for GP and Watershed Committees office bearers on a demand<br />

responsive basis. The agencies will use wide range of capacity building tools and techniques including innovative approaches. It will be the responsibilities of<br />

the capacity building agencies to develop the capacity building implementation plans and training materials based on Community Operation Manual, Project<br />

Implementation Plan and other Project manuals. It will also be the entire responsibility of the capacity building agencies to review the emerging capacity<br />

building needs evaluate the effectiveness of the capacity building activities and to make appropriate changes in the training material and capacity building<br />

action plan. The capacity building agencies will field a team of trainers at State / District Level comprising of all essential expertise required for the project.<br />

Regular monitoring of the capacity building service rendered by the agencies will be reviewed at State as well as District Level. The Capacity building agencies<br />

will sign performance linked contracts and the payments will be linked to the successful achievement milestones. The TOR for the capacity building agencies is<br />

to be developed.<br />

Names of Institutes which shall be responsible for carrying out capacity building in the project are­<br />

Sl.no Name of Institute Areas of Specializations<br />

1). Indian Council of Agricultural Agri practices to farmers/SHGs.<br />

‐ 120 ‐


Research (ICAR), West Siang,<br />

Basar Arunachal Pradesh.<br />

2). State Institute of Rural Development, RD/Watershed program.<br />

Itanagar, Arunachal Pradesh.<br />

3). The Director, North Eastern Regional Forestry/Agri/WHS & allied<br />

Institute of Science & Technology, subjects.<br />

Nirjuli,Arunachal Pradesh.<br />

4). khadi & Village Industries Commission Weaving/Khadi/Handloom<br />

(KVIC), Itanagar, Arunachal Pradesh. & Small Scale Industries.<br />

5). National Institute of Rural Development RD/Watershed Mngt<br />

(NIRD) Guwahati, khanapara, Assam . & other allied subject.<br />

6). District Textile & Handloom Centre, Handloom/Handicrafts<br />

‐ 121 ‐


Tezu ,Govt. of Arunachal Pradesh. & Carpet making.<br />

7).North Eastern Space Application GIS/RS/Delineation of<br />

Centre (NESAC), Umiam, Megalaya. Watersheds.<br />

8).Krishi Vigyan Kendra (KVK), Agri practices to farmer<br />

Itanagar, Arunachal Pradesh. / SHGs.<br />

9).Horticulture College, Pasighat, Horti & other allied practice<br />

Arunachal Pradesh.<br />

10).District Industrial Training Cane, Bamboo, Wood,<br />

CentreTezu. Furniture & Weaving<br />

Works.<br />

In addition to above institutes, the SLNA may even outsource/ hire services of appropriate agencies for capacity building & entrust the same.<br />

‐ 122 ‐


GP level capacity building:<br />

The PIA will be responsible for building the capacity of the target poor, the GP, watershed Committees, User Groups, SHGs etc. including<br />

providing handholding supports. The capacity building at the GP level will primarily be on the Community Operation manual (COM). The COM will have all the<br />

details of the main resource material for training at village level to the community. In addition to this, the other major focus of capacity building component at<br />

GP level will be orientation of Gram Sabha and elected representatives to the project processes and building capacity of 10­12 para professionals for each GP.<br />

As a part of capacity building strategy at the GP level, the project will put special efforts on exposure visits for community members.<br />

Apart from Livelihood component, the provision will be made for demonstration of best practices for various livelihood at the district. These funds<br />

can be utilized to build suitable models within the reach of the poor in their neighbourhood. These sites will be used for exposure visits and influencing the<br />

poor / poorest to adopt the best practices. \<br />

Capacity Building Activities<br />

• Sensitization and training of project staff (SLNA / W<strong>CD</strong>C/ PIAs) and GPs to facilitate the implementation of a community driven watershed project.<br />

• Comprehensive information, training and capacity building of individuals and CBOs in the village communities to participate effectively in the project.<br />

• Training of PIA staff, GPs and Watershed Committees, on the rules and regulations of the project.<br />

• Training of Secretary Watershed Committees to provide services to the Watershed Committees.<br />

IV Development of Village Watershed Proposal:<br />

Who: Watershed Committee<br />

When: After receiving complete information and initial training on the project<br />

‐ 123 ‐


• The Watershed Committee of the Revenue Village is responsible for developing its proposal.<br />

• Each member of the RV shall get the opportunity to present his/her views on what activities should .be included in the Proposal.<br />

• The watershed committee and revenue village must thoroughly understand the rules and processes of the project.<br />

V. Application of Environment and Social Economic Framework to Village Watershed Proposal:<br />

Who: Watershed Committee .<br />

When: Upon selection of activities<br />

• The Watershed Committee receives a firm commitment from the beneficiaries to contribute in terms of time, material and/or money as per the project<br />

guidelines.<br />

• The Watershed Committee asks the following questions with regard to its Proposal:<br />

� Does the Proposal meet the vision and objectives of the project?<br />

� Does it bring about social equity with regard to benefits being obtained by the village community?<br />

� Was it finalized on the basis of the voice and preferences of women, poor, SC/ST and tribal/transhumant population?<br />

� Have the WC planned for reducing negative impacts and incorporated mitigating measures to protect the environment?.<br />

• Attention will also be paid to minimizing use of pesticides and use of pesticides only as per the Integrated Pest Management (IPM) Strategy for the<br />

project.<br />

• Village Watershed Proposal is finalized by combining all selected activities and submitted to the WC.<br />

‐ 124 ‐


VII Plan for Enhancing Livelihood Opportunities:<br />

In this sub component such activities will be undertaken directly by the PIA to increase the productivity of land and other natural resources in the Gram<br />

Panchayat with the objective to increase income levels of the people. The arrangement of Funds for these activities is Budget envelope of GP. However the<br />

community/ individual beneficiary will make available contribution like land, manure which will not require direct cash contribution.<br />

Who: WDT in consultation with WC.<br />

When: After approval of the GPWDP/Work Plan..<br />

The activities to be done under this component are:<br />

• Farming systems improvement: The Objective of this sub component is to: (a) disseminate technologies and provide advisory services for<br />

agriculture, horticulture, silvi­pastoral treatments and animal husbandry; (b) provide quality seeds and seedlings; and (c) establish linkages between<br />

UGs and suppliers for processing and marketing of high value crops. The major emphasis will be the introduction of off­ season vegetables and high<br />

value crops. The project will provide all the inputs (seed/seedlings, bio­agents and bio­fertilizers) of the subprojects, with the condition that the land,<br />

labor, irrigation and farm yard manure will be provided by farmers. In order to facilitate the production of marketable produce, formation of UGs will be<br />

introduced to facilitate the production, processing and marketing of high value crops. This subproject will demonstrate improvements in the productivity<br />

of crops already cultivated in the area and the introduction of new high value crops (new varieties of off­season vegetables, fruit crops, medicinal and<br />

aromatic plants will be introduced based on agro­climatic factors, demand and assured market). For this purpose the private sector and Institutions and<br />

Organizations specialized in the subject concerned can also be contracted by the W<strong>CD</strong>C on specific approval of SLNA. Training will also be provided in<br />

application of new technologies; storage techniques; etc.<br />

� Identify the farmers and the lands proposed for this activity.<br />

� Identify the crops, farming system in which demonstration are required by GP<br />

‐ 125 ‐


• Value addition and marketing support: This sub­component will support agribusiness development. The project will make investments that would:<br />

(i) identify potential niche market opportunities; (ii) establish links with entrepreneurs who could help in exploiting the market potential; (iii) disseminate<br />

appropriate information and technology to farmers to help them to enter into production; (iv) co­finance subprojects with UGs & SHGs (on a one­time<br />

subsidy basis); (v) co­finance subprojects with entrepreneurs (on a one­time subsidy basis) for storage, processing and or marketing infrastructure<br />

needed to exploit the market potential.<br />

• Income generating activities for vulnerable groups: This is designed to finance small income generating micro­enterprises for vulnerable groups<br />

(women and landless), which will promote the project's objective of equity and sustainable NRM. These SHGs would be identified during the watershed<br />

planning process through a wealth/ asset ranking PRA methods). Training will be provided to vulnerable groups to encourage their entrepreneurial<br />

development. The Income Generating Activity proposals will be developed after the implementation of the Entrepreneurial Development Program (EDP)<br />

and reflection of WC of the overall envelope and the target groups. The funds will be disbursed through the GPs to the SHGs, who will manage them.<br />

The funds will be disbursed in two installments based on the implementation performance of the SHGs who are managing the income generating<br />

activities for which specific indicators have been included. The WDT's endorsement (sign off) will be required on each proposal to ensure that the E&SA<br />

has been applied.<br />

• Revolving Fund: Revolving fund (RF) has been provided for marginalized groups, which are either left out or receive little benefits from the watershed<br />

treatment activities of the project. Most of the proposed watershed interventions are land­based and thus, to provide benefits to these groups, special<br />

activities have to be thought that the project does not profit only the landed and affluent sections of the village. In addition, this is a mechanism to<br />

involve these people with the implementation of the project, who may otherwise remain indifferent.<br />

Since all income generation activities, from the selection of the activity to the final disposal of the product would be decided and executed by the Self<br />

Help Groups (SHGs) themselves, a participatory process methodology would serve best. This would not only result in poverty alleviation in tangible<br />

terms but also help marginalized section to organize themselves into sustainable SHGs. This would go a long way in meeting the goal of productivity<br />

enhancement of the project areas.<br />

‐ 126 ‐


The overall objective of the RF is the socio­economic upliftment of women, poor, SC/ST and transhumant communities by the expansion of income<br />

earning options / through on farm & off farm employment and sustainable and efficient use of natural resources. Some key preconditions are needed<br />

for this:<br />

� Availability of infrastructure, both physical and institutional, at local level.<br />

� Access to support services (e.g. credit, inputs, training and information)<br />

� Access to markets and knowledge.<br />

� Safeguard against ecological problems (e.g. land degradation, overexploitation of natural resources and endangered bio­diversity)<br />

• Implementation Strategy for IGAs; The implementation strategy for enhancing incomes of vulnerable groups will take place in seven steps:<br />

� Identification of vulnerable sections/individuals and their need assessment<br />

� Formation of SHGs of identified vulnerable groups/individuals and women<br />

� Entrepreneurship Development of the SHGs.<br />

� Selection of(the Income Generating Activity (IGA)<br />

� Formation of ,Sub Plan for RF<br />

� Implementation of Sub Plan for RF<br />

� Networking of Groups for the sustainability of IGA<br />

VIII Identification of Vulnerable Groups and their Needs:<br />

Who: WDT<br />

When: After orientation of the GP & community to the project<br />

‐ 127 ‐


• Help the communities understand the reasons for their poverty, what opportunities could reduce their poverty and how they can collectively act to make<br />

this happen.<br />

• Conduct Participatory Rural Appraisal (PRA) for the identification of vulnerable group /individuals<br />

• Identification of vulnerable sections of the society, poorest of the poor, through the process of wealth ranking<br />

• Ascertain their special needs and existing gaps.<br />

• Take stock of the needs of the community for viable economic development.<br />

IX Formation of SHGs:<br />

Who: WDT<br />

When: After identification of vulnerable groups/individuals.<br />

• SHGs of groups/individuals identified as part of the above­mentioned exercise and will be formed as per the NABARD guidelines. Economic homogeneity<br />

and emotional affinity will be key factors for formation of any SHG.<br />

• They will function as credit and thrift groups. However, to promote Income Generation Activities from the beginning itself, commodity approach will be<br />

emphasized during the formation of SHG. This will enable to develop further linkages regarding IGAs at a cluster level.<br />

• Other factors to be considered in formation of SHGs are:<br />

� Availability of resources , needs and demands of the community as regards taking up viable IGA in the project areas.<br />

� Scenario of other ongoing IGA schemes and their beneficiaries.<br />

� Members of those vulnerable groups, not covered under other ongoing Schemes will be given priority during formation of SHGs under the project.<br />

‐ 128 ‐


X Capacity Building of SHGs:<br />

Who: W<strong>CD</strong>C/Other institutes assigned by SLNA.<br />

When: Upon identification of capacity building needs by the SHGs & PIA staff<br />

• Prepare comprehensive capacity building plan in consultation with SHGs.<br />

• Training would cover the following areas:<br />

� Aspects including market analysis and trends, pricing, rights and rules, etc.<br />

� Production aspects of IGA including technical training.<br />

� Value addition and storage.<br />

� Marketing<br />

� Record keeping, bookkeeping and management of finances.<br />

� Follow up training to meet the ever­changing needs of the market<br />

� Institutional development, cooperatives, federations<br />

• The above mentioned subjects will be covered under two sub­components of capacity building program:<br />

i. Entrepreneurship Development Program (EDP):<br />

The EDP will be conducted after the completion of basic modules to the SHGs and within first 18 months of / the project. It will assist the SHG<br />

members in identifying a viable activity, which they can take up for the enhancement of their livelihood. Aspects such as market analysis, quality<br />

control, management of finance, establishing forward and backward linkages, pricing, rights and rules etc. will be covered through this training.<br />

For the selection of members for EDP, priority will be given to poor dependent on occupation merely adequate for subsistent living. Groups<br />

who are graded 'Good 1 will be eligible for this program.<br />

‐ 129 ‐


ii) Skill Training and Exposure program:<br />

Skill training will be conducted for those members who have participated in the EDP. It is presumed that the SHG members who start IGA<br />

activities will be given skill training and exposure.<br />

XI Selection of IGAs:<br />

Who: SHGs<br />

When: After completion of EDP<br />

• Following factors may be considered for the selection of a specific IGA for a specific group. The ES&A will also be applied at the time of the selection of<br />

IGA.<br />

� Availability of resources<br />

� Existing skills and capacity such as carpet weaving, handicraft, etc. which can be converted into IGAs<br />

� Quality and marketability of the product<br />

� Sufficient demand of the product<br />

� Risk taking capacities of the groups<br />

� Financial inputs required<br />

� Forward and backward linkages<br />

XII Sub Plan for RF:<br />

Who: WC Assisted by WDT<br />

When: Upon receipt of IGA proposals for funding from SHGs<br />

‐ 130 ‐


• Upon finalization of an IGA by the SHG, it will prepare a proposal for funding and submit the same to WDT for appraisal. Through WC clearance by the<br />

WDT, will be submitted to GP which shall incorporate a same into its annual sub plan for IGA activities.<br />

• If a proposal is not viable, it will be sent back to the SHG for appropriate changes and resubmitted by the SHG to WDT for appraisal. The same shall<br />

then be submitted to the WC.<br />

XIII Networking of Groups for the sustainability of IGAs:<br />

Who: SHGs , Experts including WDT<br />

When: Upon maturity of SHGs and starting of IGAs at a certain level<br />

• Upon maturity of SHGs and reaching of IGAs to a certain level, the project would encourage the formation of Association and Federations of SHGs.<br />

• These would be based on production, processing and marketing of the products.<br />

• The activities of these institutions would include Input Management, Common Storage Facilities, Grading and Packaging, Group Marketing, Market Outlet<br />

Development, Joint Market Negotiation and Transport Organization.<br />

XIV Utilization Mechanism for RF:<br />

Due to the limited saving capacity of SHGs, their savings amount may not be sufficient to undertake IGAs. Thus, under the project, it is proposed to<br />

provide working capital assistance to the SHGs engaged in IGAs. It will serve the purpose of promotion of micro­ enterprises and will work as a Revolving<br />

Fund. This fund will be utilized by the SHG either for a joint IGA or for individual initiatives. For additional funds, SHGs will be linked to the banks.<br />

‐ 131 ‐


At revenue village level a Sub Plan will be prepared by the vulnerable groups with the assistance of WC/WDT. This plan will include the following:<br />

1. Prioritization of IGA for the Revenue Village based on their viability<br />

1. Detail out the utilization and recovery mechanism of this Revolving Fund.<br />

This evaluation will be done by WDT after EDP and skill development program. The indicators for the assessment of SHGs will be mainly as follows:<br />

• Regularity of meeting and attendance<br />

• Regularity of saving and common fund generated<br />

• Bylaws formed and proceeding should be recorded<br />

• Awareness about income generation activities<br />

• Capacity building ( EDP, skill development)<br />

Further, the SHGs will carry out self­assessment to gauge their requirement of working capital and the,availability of resources. On the basis of both these<br />

assessments, the grading of SHGs will be done and money from the Revolving Fund will be given to such groups which will fulfill the parameters. SHGs not<br />

receiving funding during the year will be reassessed the following year.<br />

‐ 132 ‐


Fund Flow Mechanism<br />

Assessment of SHGs Preparation of IGA Proposal<br />

by SHGs<br />

Release of funds to SHG SPA signed between SHG &<br />

WC<br />

Under this project the mechanism of fund flow to SHGs for IGAs may not be very fruitful as communities are used to have access in a short­cut manner &<br />

such a trend may tend to distract SHGs taking initiatives. A locally viable system to be worked out by WC in consultation with WDT & PIA to provide<br />

assistance accordingly.<br />

XV Review and appraisal of GPWDP/Work plan:<br />

Who: PIA & W<strong>CD</strong>C<br />

When: After receiving proposed GPWDP/Work plan from WC<br />

• Receipt of the proposed GPWDP/work plan by W<strong>CD</strong>C.<br />

• Appraisal of the GPWDP by W<strong>CD</strong>C as per of E&SA.<br />

Appraisal by WDT<br />

Appraisal of proposal<br />

by WC<br />

‐ 133 ‐


• If any shortcoming is found or if the GPWDP proposes to spend beyond the financial ceiling set for the GP, then W<strong>CD</strong>C will send it back to the WC with<br />

written observations and recommendations.<br />

• The WC shall consider these observations and recommendations and may make appropriate changes in its GPWDP/Work plan for approval.<br />

• The final GPWDP shall be resubmitted to W<strong>CD</strong>C for further implementation<br />

(GPWDP /Work­ plan as evolved out in this DPR shall be implemented in toto ).<br />

XVI Payment to WC:<br />

Who: W<strong>CD</strong>C<br />

When: After approval of final Work plan/ GPWDP & submission of AWP .<br />

• After approval of GPWDP/Work Plan , the WC shall prepare a detailed Annual Work Plan (AWP) for the first year. This will contain details of activities to<br />

be funded and implemented, who shall implement them and when, who shall benefit from them, details of beneficiary contribution, and the cost to be<br />

incurred for each activity.<br />

• On­account payment' amounting to 10% of the approved AWP amount will be transferred to WC account by the W<strong>CD</strong>C.<br />

• The WC will need to maintain and submit books of accounts and other documents while claiming reimbursement.<br />

XVII Process of 2 nd and 3 rd year AWPs:<br />

Who: WC<br />

When: After successfully implementing 1 st year's AWP<br />

‐ 134 ‐


• The WC shall make a detailed AWP for the second year upon near completion of activities listed out in the first year's AWP.<br />

• This AWP will be submitted to the W<strong>CD</strong>C for information, MOU signed for its implementation, and transfer of due funds to the WC Account.<br />

• Same process will be followed for AWP for the third year.<br />

IMPLEMENTATION & FINANCIAL MANAGEMENT:<br />

The WC will get funds for implementation from the project through their W<strong>CD</strong>C and will also have to collect the beneficiary contributions as agreed to<br />

with SLNA. The Funds made available to WC by the project will be of two kinds.<br />

• Implementation Fund.<br />

• Revolving Fund<br />

And the fund generated by the WC will be watershed Development Fund.<br />

Implementation Fund:<br />

Implementation Fund will be the grant transferred to the WC for the implementation of Project activities. As such major amounts received by the WC<br />

will be under this head. This fund will be used only for the activities proposed in the Project. The amount will be received in a separate Bank Account i.e.<br />

'Watershed Development Project Account' which will be operated by Secretary of WC (under the control of Chairman, WC).This funds will be utilized for<br />

payment of works done & for which issue of cheques to be done jointly by Secretary, WC & a designated WDT member .<br />

Revolving Fund:<br />

‐ 135 ‐


This fund relates to the amounts transferred to the WC for the purpose of enhancing equity and providing small loans to vulnerable groups in the<br />

project area / village. The amount will be received by the WC in its 'Watershed Development Project Account.<br />

I. Flow of Funds to the WC :<br />

Initial On­Account Payment:<br />

On­Account payment to the extent of 10% of the Annual Work Plan shall be given at the beginning of the Project to the WC. It will be however adjusted on<br />

the completion of the GPWDP cycle.­ (The initial on account payment to WC will be guided & subject to time to time instructions of SLNA).<br />

Reimbursement of Cost of Works:<br />

During Implementation of the Project, reimbursement of expenditure on works shall be made on submission of monthly financial statements. All<br />

expenditures made as per the agreed work plan , incurred during the month will be reimbursed by the W<strong>CD</strong>C. In the event that the money is completely spent<br />

before the end of the month, the WC can submit the financial statements before the end of the month and receive the reimbursement.­( This arrangement will<br />

be subject to changes which is more appropriate for timely implementation).<br />

II. Estimates and Technical Sanction:<br />

Who: WC and PIA<br />

When: Before initiating any activity.<br />

• After preparation of detailed AWP and receipt of the initial On Account payment from the PIA the estimate for each activity to be initiated will be<br />

prepared by the WC with the help of the Technical Representative of the WDT .<br />

‐ 136 ‐


• Technical member of the WDT will carry out the following functions in preparation of detailed cost estimate of activities earmarked to be<br />

undertaken in a village:<br />

• The Technical Representative of WDT, along with a WC member shall take up survey of a particular work for preparing the estimates. For<br />

Departmental works, Respective Unit officer shall give technical approval. The design and the estimates need be discussed with the concerned<br />

members and finalized.<br />

• Technical member of the WDT will carry out the following functions in preparation of detailed cost estimate of activities earmarked to be<br />

undertaken in a village:<br />

• Sanction of the Activity:<br />

A technical sanction will have to be obtained for each estimate prepared by the project area before initiating any activity. The T/S<br />

amounts will be as per financial delegation of powers given to DRDA The format of Technical Sanction is as follows­<br />

Technical sanction for watershed works :<br />

Sanctioning Limit Sanctioning Authority<br />

Up to Rs 10,000 Should be passed in the meeting of WC. No sanction from PIA<br />

required. Copy will be sent to PIA for information.<br />

Above Rs. 10,000 1).Sanction from PIA is required according to norms. The<br />

estimates prepared will be submitted to the WDT by WC for<br />

according sanction from the W<strong>CD</strong>C under DRDA.<br />

2).Sanction upto Rs.1.50 Lakh to be done under the<br />

technical competency of APO/TA ­ cum­ designated officer<br />

‐ 137 ‐


under IWMP of W<strong>CD</strong>C, DRDA<br />

• Once sanction is granted, a 'technical sanction number.' shall be allotted for each activity.<br />

• An Integrated Activity register shall be maintained by the Secretary at each WC.<br />

• There will be no splitting of work/activity for the purpose of by passing sanctioning requirement from PIA for activities above Rs. 10,000.<br />

• Format for accord of Technical sanction is as under­<br />

<strong>FOR</strong>MAT <strong>FOR</strong> TECHNICAL SANCTION <strong>FOR</strong> EACH ACTIVITY<br />

NAME OF <strong>PROJECT</strong> AREA & UNDER WHICH GRAM PANCHAYAT_________<br />

Technical Sanction<br />

Activity Name:____________________________ Sanction No._______________________<br />

Units / Physical Measurement______________ Total Cost as per estimate:_________<br />

Place of Work:______________________________ Beneficiary Share:_________________<br />

‐ 138 ‐


Date of Start:_______________________________ Project Share:______________________<br />

Date of Completion:__________________________<br />

Summary of Estimated Expenditure, Sub­activity wise<br />

Total<br />

Sl. No Sub<br />

Activity<br />

Name<br />

Unit of<br />

Measurement<br />

Units Rate per<br />

Unit<br />

Less: Beneficiary contribution:______________________<br />

Project Share:______________________________________<br />

Sanctioning Authority<br />

Name :<br />

Signature:<br />

Date:<br />

Total Cost<br />

‐ 139 ‐


III. Implementation Agency for Work:<br />

• The WC will have the right to appoint anyone of the following Implementors for the implementation of the work:<br />

� The Gram Panchayat<br />

� The Individual Farmer (Beneficiary) for the work to be executed on his individual land. (Individual will work as a contractor, in the case.)<br />

� User Group/SHG may be engaged for the activities to be implemented on common/ community/ village assets or on individual land or asset, should<br />

the beneficiary have no ­ objection to this arrangement. Revenue Village Committee will also work as a contractor.<br />

� The First Right of implementation of each work under the project rests with village­level entities such as the User Group, SHG or the Van Panchayat,<br />

individual farmer. If these options are not available then the WC itself may decide to execute the works. If all the above options do not work out only<br />

then the works will be awarded to independent contractors, However the WC will have to obtain in writing their inability to undertake the project<br />

activities before awarding the contract for the 'said work to an independent contractor.­(WC will take liberty under guidance of PIA/W<strong>CD</strong>C to<br />

decide on this aspect)<br />

� In case of special technical requirements for which the above mentioned village level institutions do not possess adequate capacities, and then the WC<br />

may outsource a contractor having past experience in specialized technical works. Such a Contractor will be appointed only after the Beneficiaries have<br />

deposited the full amount of their share of the cost of the said activity in advance .<br />

‐ 140 ‐


Sub­Project Agreement between WC and Implementer:<br />

If the WC does not undertake to execute the work on its own, then for each activity a Sub­Project Agreement (SPA) shall be signed between the WC and<br />

the Implementer. The design and cost estimates prepared with the assistance of WDT Representative shall form part of the SPA. The major areas covered in<br />

the SPA will be as follows:<br />

Objectives:<br />

• Sub Contracting<br />

• Implementation of Works<br />

• Procurement of Material<br />

• Responsibility of Damages<br />

• Time Limit<br />

• Schedule of Payment<br />

• Duties and Responsibilities of the WC<br />

• Duties and responsibilities of the Implementer<br />

• Settlement of Disputes<br />

• Ownership and responsibility of maintenance post completion of works.<br />

IV. Implementing the Work:<br />

• Technical representative of the WDT will provide guidance to the Implementer and will monitor the work to ensure that the work is completed in time<br />

and as per the estimates and the designs prepared.<br />

• Work must be completed in the sequenced manner as approved & ratified by SLNA.<br />

‐ 141 ‐


• Technical Representative of the WDT team shall verify the progress of works at different stages and record in a Measurement Book (MB) after<br />

verification. The MBs however shall be kept in safe custody of the Secretary, WC. The format of the MB, as prescribed by the State Financial Rules vide<br />

form nos. 16 and 17, should be followed.<br />

V. Basis of Payment / Reimbursement:<br />

• If the WC undertakes to implement the work on its own then the WC cannot spend more than the amount sanctioned, net of beneficiary contribution.<br />

• In case the work is implemented by an Implementer other than WC, the total payment made shall not exceed the estimated unit cost (net of Beneficiary<br />

Contribution) as approved and adjusted proportionately for actual measurements.<br />

• If there is any change in design with respect to original estimation, revised sanction should be sought in this regard.<br />

• The above amounts will also be eligible for reimbursement to WC by W<strong>CD</strong>C.<br />

Authorization: The bill received will have to be routed through the Secretary who, before making any payments, shall cross check with the Integrated Activity<br />

Register to verify the quantum of earlier payments made before getting it approved by the WC. All payments shall be authorized by the WC, which shall meet<br />

for the purpose at least once a week.<br />

VI. Stages of payment:<br />

• Bills for the work implemented by WC itself will be paid as soon as it is authorized by the WDT<br />

• The payment to the Implementer (Individual/VP/UG/SHG) will be on the basis of running bills and subsequently on final bill supported by the Completion<br />

Certificate.<br />

Advances:<br />

No advance payments shall be made to the Implementers.<br />

‐ 142 ‐


Following Table summarizes the fund flow from WC to Implementer:<br />

Fund flow from WC to Implementer­<br />

Particulars Types of Implementers<br />

Individual<br />

Farmer<br />

VP/SHG/UG/<br />

Outside<br />

contractor<br />

Gram<br />

Panchayat/Proje<br />

ct communities.<br />

Basis of Work On contract Basis On contract Basis On actual basis<br />

Payment Timing On the Basis Of<br />

running bill and /<br />

or Completion Bill<br />

Basis of Reimbursement<br />

from DPD to GP<br />

On the basis of<br />

Estimated Unit<br />

Cost. (Net of<br />

On the Basis Of\<br />

running bill and /<br />

or Completion Bill<br />

On the basis of<br />

Estimated Unit<br />

Cost. (Net of<br />

On presentation of<br />

bills for Material/<br />

Labour etc<br />

On actual cost to<br />

the extent of<br />

amount sanctioned,<br />

net of Beneficiary<br />

‐ 143 ‐


Certification of Running<br />

Bill / Completion Bill<br />

Flow of<br />

Funds<br />

beneficiary) beneficiary) Contribution.<br />

To be prepared by<br />

Implementer and<br />

certified by<br />

Representative of<br />

RVC and WDT,<br />

Advance Nil Nil Nil<br />

Against<br />

Running Bill<br />

cum Work done<br />

Certificate<br />

Against Final<br />

Bill cum<br />

Completion<br />

Certificate<br />

80% of the<br />

amount certified<br />

as per the bill<br />

Full payment as<br />

sanctioned, net of<br />

Beneficiary<br />

Contribution<br />

80% of the<br />

amount certified as<br />

per the bill<br />

Full payment as<br />

sanctioned, net of<br />

Beneficiary<br />

Contribution<br />

On actual basis, up<br />

to the amount<br />

sanctioned, net of<br />

Beneficiary<br />

'Contribution<br />

‐ 144 ‐


Capacity building scheme:<br />

Sl. No Activity Name of the Scheme Nodal Department<br />

1 Skill up gradation SGSY RD<br />

2 Entrepreneurial<br />

Development<br />

programmes<br />

EDP Training Industry, Tourism<br />

, Textiles &<br />

Handicrafts.<br />

3 IT IT Training Self­employment.<br />

Proposed Plan:<br />

As per provision of the common Guidelines for Watershed Development Projects the proposed area will be treated according to the fund provision<br />

made by the Government of India. The administrative expenditure such as salary / honorarium to the staff engaged in the implementation of Projects,<br />

contingencies and other expenses of stationary, IEC activities etc. would be meet out from the provision of Administrative Head.<br />

Work Phase:<br />

Under this component the objectives are:<br />

‐ 145 ‐


• Economic development of community through optimum and sustainable utilization of natural resources like land, water, forest etc. to save<br />

environmental degradation and employment generation through works and development of human and other economic resources by<br />

promoting savings and income generation activities.<br />

• Restoration of ecological balance in the village through soil and water conservation measures leading to reduction in soil erosion, water<br />

conservation, increase in vegetative cover etc. and sustained community action to operate and maintain created assets and further<br />

development of natural resources in the watershed.<br />

• Improvement of socio economic condition of the village community particularly the resources poor and the disadvantaged sections of the<br />

community such as asset less, SC / ST and the women distribution of the benefits of land and watershed resources development and<br />

biomass production and greater access to income generation opportunities.<br />

Water management Activities:<br />

To improve the water availability in the project area by evolving various water harvesting technologies and promoting optimal use of available water for<br />

the purpose to improve the rural livelihood & economy of the farmers of the project area and to reduce the chances of floods and soil erosion in the areas<br />

down below, the following activities are proposed:<br />

(a) Rain Water Harvesting: It is common that in the water is used for providing irrigation, development of fish; cattle’s drinking etc. height of dam<br />

depends upon water demand, storage, catchments areas etc. But generally average height proposed is 6.00 meters.<br />

(b) R.C.C. Dam: These types of dams are constructed of mass concrete where foundation is rocky & cross section of nallah is small and stone<br />

aggregate is cheaply available. In these types of dams spill way is provided within the dam body.<br />

(c) Masonry Dams: These dams are constructed of stone masonry at places where stones are cheaply available as compared to stone aggregate.<br />

The purpose and size of the masonry dam are same as that of RCC dam.<br />

(d) Water use.<br />

Minor Irrigation Activities:<br />

‐ 146 ‐


The irrigation is the major component that play pivotal role to improve the agriculture, horticulture production and attractive income generation to the<br />

watershed communities. The proposed activities under this component are:<br />

(i) Lift / Gravity irrigation scheme: In take structure are constructed at the available water source from where it is taken to the fields either<br />

by lifting or by gravity through irrigation channels and accordingly the scheme is called lift or gravity irrigation scheme. In case the discharge<br />

at the source is not sufficient to meet the requirement, storage tanks are constructed from where the stored water is recycled to the<br />

command areas. This would include construction of protection works for productive management also.<br />

(ii) Makowal Type Structure: At locations where river beds are generally sandy and an impervious layer lies at a small depth, harvesting of<br />

sub­surface flow is done by construction of a head wall across the nallah up to the impervious layer, a water collection chamber with filters<br />

and wing walls. Water from the water chamber goes to the storage tank constructed on d/s side banks from where it is delivered to the field<br />

through pipes / irrigation channels.<br />

(iii) Irrigation channels ( MIC) : Under this activity, lining of existing water channels is done with cement concrete or stone masonry cement<br />

mortar so as to reduce the water loss due to seepage and more area is brought under irrigation. Size of channels depends upon the<br />

availability and requirement of water.<br />

All the works / activities under Non­arable Land Treatment will be identified in micro watershed basis as a part of watershed planning and will be<br />

implemented through Watershed development Committee in the jurisdiction area of watershed Committee with technical support from the Project Staff/WDT.<br />

Since the objective of the Project is to reverse the process of degradation of the natural resource base, soil and water conservation measures will<br />

receive priority. The basic principle of ridge­to valley approach in watershed management will be followed. As such, treatment of the catchments area before or<br />

along with the development of water resources will be the essential process for project implementation. The soil and water conservation measures will be areas<br />

specific, need based and will be decided for specific catchments area. Maximum importance will be given to vegetative and engineering measure for<br />

enhancement of livelihood local communities.<br />

Afforestration:<br />

‐ 147 ‐


Since the rural population of the state depends mostly on forest to meet their fuel and fodder needs, due to which there has been gradual depletion of<br />

forest wealth in the Himalayan. Afforestation is thus essential for the sustainability of Himalayan ecosystem. The forest blank are potential area for carrying out<br />

afforestation under which mix spices are suggested in various patches mainly to produced multi purpose products to improve the economic status of the<br />

watershed community.<br />

The catchments area treatment will receive priority over general improvement of forest area. The treatment will be site specific and will include<br />

not only tree plantation but also improve the grass production which is more attractive to the community due to quick and visible benefits. Concept of Ridge­<br />

to­Valley treatment is to be followed strictly.<br />

The plan of work and selection of tree and vegetative species will be the choice of the community / GPs and execution will be done by the GPs /<br />

WC. The watch and ward of plantation, to ensure the effective use and maintenance would be the responsibility of GPs / WCs. The need­based training to the<br />

Project staff and local community will be provided under this component. The treatment in inter­GP areas (i.e. those areas outside the jurisdiction of GPs) will<br />

be executed by the Project Implementing Agency.<br />

(i) Rehabilitation Plantation (Normal and Lantana): The objective is to improve, restore and maintain the stocking of desired species in the<br />

degraded forest areas where natural regeneration is deficient or absent. Temporarily un­stocked –forests, away from habitations and inter G.P areas<br />

will be taken up for treatment Indigenous species or specie growing under similar habitat condition elsewhere will be preferred.<br />

(ii) Conservation Plantation: The objective is to raise probative plantation in the form of three tire combination of grasses, shrubs and trees to check,<br />

soil erosion by both falling and flowing water, promote in situ moisture conservation and improve soil fertility, productivity and biodiversity.<br />

Ravines, erosion prone areas, large slips and catchments of reservoirs and dams, water harvesting structure will be taken up for treatment<br />

with species of soil conservation base of thick foliage. Efforts to control lantana will be made by special treatment of cutting twice a year till there is<br />

enough vegetative cover to suppress it.<br />

(iii) Community Plantation: The productive plantation of grasses and trees with people’s participation for augmentation of availability of fodder, fuel<br />

and small timber in the rural areas will be raised. Reducing the pressure on forestlands, Fringe areas between forests and habitation, common lands<br />

and wasteland will be taken up for treatment with species preferred by the local community.<br />

‐ 148 ‐


(iv) Development of Non Timber Forest Produce: Keeping in view the geographical condition and marketing potential, the medicinal grass, shrubs<br />

and tree species Rubber etc of economical importance to augment the rural house hold income will be introduced. Choice of species will be according<br />

to locally factors, choice of villagers and marketing possibilities.<br />

(v) Nursery raising: Under this component a centralized nurseries are raised at­least on 2 hac of land each in order to ensure adequate and low cost<br />

supply of desired spices for plantation purpose. It is also proposed to setup decentralized nurseries particularly in distance located watershed where<br />

the cost of transporting the plants become uneconomical so that the area proposed to cover under a forestation sector can be treated more<br />

effectively.<br />

With the active participation of watershed communities, the nurseries will be established with modern techniques to ensure the<br />

quality planting material for plantation in watershed areas. The capacity building measures will be initiated under the project to enhance the capacity<br />

of user groups to collect and market the NTFPs and sub­projects / activities will be implemented to encourage the plantation of medicinal and other<br />

high value crops­especially short duration species­to make the forestry plantation as an attractive income­generating component for the community.<br />

Pasture Development:<br />

With increase in cropping area under vegetable production alternative sources of fodder are shrinking and thus pressure on natural pastures is<br />

increasing. Natural grasslands and pastures are the major sources of fodder for wild animals / cattle and play critical role in livelihoods of transhumant and<br />

local alike. The production of dry grass ranges from 10­15 quintal / ha, which can be raised upto 150 q/ha with better management. Grasslands are facing<br />

major threats from invasion of weeds rendering them unproductive and women do not prefer cutting grass in such areas. The problem of grazing is further<br />

increased due to stopping of winter grazing facilities of transhumant, which were earlier available to the grazers of the State in adjoining states and the flocks<br />

of these grazers had to be accommodated in the state for winter grazing. Natural pasture are reported to be overgrazed. Such huge portion of land meant for<br />

permanent pasture can not be overlooked for development under watershed development programme. Thus the pasture lands will be developed by silvipasture<br />

methods including plantation of leguminous species, nutritious grasses and other economically useful species with active participation of village people to<br />

ensure the sufficient available of fodder through out the year. By sufficient quantity of fodder the Animal Husbandry Sector will definitely be strengthened and<br />

quantity and quality of milk production, wool production, will also be increased substantially in rural areas of the State. The developed pasture land will be<br />

protected by barded wire fencing and social fencing as suitable for the area and undesired bushes and weeds and other grasses with less nutrients particularly<br />

lantana bushes besides being harmful for the grazing animals will also be removed and area will be covered with improved quality grasses and fodder tree<br />

plantation.<br />

‐ 149 ‐


Soil Conservation Activities:<br />

(i) Drainage Line Treatment: To facilitate the establishment of vegetation or to provide protection (RCC/Boulder pitching) at points cannot be<br />

adequately protected in any other way. The erosive velocities of run off are reduced manifold by flattening out the steep uniform gradient of<br />

the gully by constructing a series of checks dams (commonly known as check dams) with locally available material from top to bottom.<br />

Activities proposed under this component are:<br />

(ii) Brush Wood Check Dams: In gullies having side slopes less than 45 degrees, poles of about 7.5 cm diameters are driven into the ground in<br />

a single or double row across the nalla at right angle to the flow. The brushwood is packed against the u/s face of the poles.<br />

(iii) Contour Trenching: Contour Trenches is excavated along the uniform level across the slope. Bunds are formed down hill along the trench<br />

with material taken out of them. The main idea is to create more favorable moisture condition and, thus accelerate the growth of the plated<br />

trees. Plants are put on the trench side of the bunds along the berms. The excess runoff is conveyed through a vertical disposal drain. Such<br />

contour trenchings are also in the form of land developments at certain places by which the production management is also done.<br />

Livelihood Component:<br />

In Lohit District, 90% population in rural areas are dependent on Agriculture, Horticulture, Animal Husbandry and other traditional activities like<br />

weaving, wood craft work, etc. Hence, the focus under watershed development will be to improve the socio­economics condition of the community of rural<br />

areas. Common guidelines for watershed development has specific provision of outlay kept for livelihood component.<br />

In certain pockets of Arunachal Pradesh, it is feared that the crafts like Metalcraft, Ornaments, Wood Carvings, wood Turnings, Kinnauri Shawl<br />

Weaving Traditional Footwears, Embroidery, Paintings etc. have either gone extinct or are on the decay. Besides their employment potential of these crafts<br />

depict the aesthetic genius and technical competence of the craftsman of the Pradesh.<br />

Livelihood is a key component of the household economy Lohit district. It is source of additional income to farming households, especially the<br />

poorest of them. About 73% total rural household in India keep and own livestock of one kind or another to drive an average 20% of their income from this<br />

source. Women provide nearly 90% of all labour for livestock management. The entire rural economy of the State centers on Agriculture, Horticulture, Animal<br />

Husbandry, Sheep and Wool Development, cattle rearing,Forest, Fishery, Poultry, bee Keeping, Floriculture, Mushroom cultivation, Sericulture, Mining etc.<br />

‐ 150 ‐


Livelihood dependent upon Forest goods and services are very high in many areas. Total rain­fed conditions and lack of access to markets alone (despite their<br />

large landholdings and greater livestock numbers) can make the people of such areas much poorer than those who have small holdings but line in the valley.<br />

Under watershed Development the productivity, enhancement and livelihood will be given priority alongwith conservation measures. The systematic<br />

approach would be adopted for resource development in order to promote farming and allied activities, by resource conservation and regeneration. Suitable<br />

water sources are to be creating community tank, assistance will be provided to the community / Group of farmers as per provision of the guidelines, besides<br />

providing assistance for maintenance and construction of ponds, wells Apart from developing water sources to ensure round the year irrigation. The use of<br />

plastics on farm management of water has gained significant importance in recent years. The plasticulture applications include water distribution network<br />

through plastic pipes, plastic sprinklers, micro irrigation, micro sprinkler, nursery nags, green house, net structures, walk in and low tunnels, plastic mulching<br />

etc. Drip irrigation is useful from the point of view of judicious utilization of scarce surface and ground water resources.<br />

In the rainfed areas the animal resources are major source of income and will be integrated with watershed development projects so that a<br />

comprehensive animal husbandry component would contribute significantly to ensuring a better and sustainable livelihood for the people of the watershed /<br />

rainfed areas. Watershed approach is gaining importance in planning and implementation of natural resources management programmes. Such approach will<br />

be used to check soil erosion and denudation of catchments areas of important river systems for mitigating floods, landslides and for reducing siltation.<br />

Synergies between concerned Government Agencies. PRIs and NGOs will be developed for supporting watershed approaches for natural resources<br />

management. This will be coordinated through nodal agency. The Project will explore the potential of market­based infrastructures for facilitating protection<br />

and development. The Government will also liaison with other mountain state in the country to explore market or ensuring payment for watershed services to<br />

the District and Village community for protecting, managing and developing watershed. Some activities in the village /project area to be taken up will be­<br />

• IT training small outlets.<br />

• Cycle repair<br />

• Plumbing<br />

• Mobil repair<br />

‐ 151 ‐


(a) Livelihood Frame Work:<br />

• Choosing the right livelihood activities for intervention through techno­ market feasibility<br />

• Choosing an appropriate form of household level groups to mobilize.<br />

• Choosing an appropriate structure at the cluster level to federate village level organizations and identify what they should do collectively.<br />

• Identifying a suitable market to sell the products.<br />

• Ensuring adequate finance to operate the whole chain from farm to market.<br />

(b) Institutional Building:<br />

• Promoting / strengthening community Groups / institutions / User Groups, Self –Help Groups (SGHs), particularly of the poor / women.<br />

• Promote and support the federations (of SHGs, CGs, User Groups).<br />

• Capacity building of PRIs and other local village level institutions to Plan, Implement and maintain the assets created under Watershed<br />

Development Programmes.<br />

• Building the skills and capacities of the poor and their service providers.<br />

• Sensitizing line department and banks to extend their moral support and responsive behavior according to the needs of inhabitants of the<br />

watershed area.<br />

• Organize Exposure visit for community leaders and representatives of the federations, GP representatives and the project staff.<br />

(c)Livelihood Gaps / Opportunities:<br />

Since the project’s livelihood interventions would target the poor sections, it becomes critical to define who will be those poor since many<br />

of the criteria for defining and under standing poverty at the village level may not be uniformly applicable. For instance, at high altitude, remote<br />

village or Panchayat land holdings may be comparatively larger than the valleys or livestock numbers may be greater, but total rain­fed conditions<br />

and lack of access to markets alone can make the people of such areas much poorer than those who hold less land but live in the valley. For the<br />

marginalized groups who are generally the poorest traditional occupations like grazing the village livestock, fuel wood and fodder collection, tree<br />

cutting and timber conversion, NTFP collection, etc. still form major livelihood.<br />

The gram Panchayat with the help of SHGs, professionals and WC, will initiate participatory process for preparation of watershed<br />

Development plan for the GP / Micro watershed. This plan will be a result of livelihoods analysis that includes resource mapping / assessment,<br />

analyzing existing livelihoods and new livelihoods opportunities against items like available of raw materials, Skills available, existing livelihood,<br />

‐ 152 ‐


Livelihood Activities:<br />

existing Market demand, marketing Facilities within and outside the village, transportation networks etc. Potential livelihood opportunities for<br />

communities will also be identified during this process.<br />

Natural resources form the livelihood basis for most people of the district. There is a high degree of dependence on these resources and as<br />

a result often conflicts are observed between resources managers and other stakeholders. With the active involvement of PRI, SHG and USGs ­all<br />

the conflicts will be resolved by introduction of equitable distribution system as outlined in the instant DPR.<br />

(i) Agricultural / Farm Sector activities:<br />

Out of total 521200 hectare area of the district, 1,31,967.84 ha (2.532 %) is net sown area . More population of women is engaged in<br />

agriculture. The climate of the district is suitable for growing non­ seasonal vegetables and there is sufficient scope for increase in production of off­<br />

season vegetables under watershed development projects. Similarly, the production of cereals and pulses can be increased with the intervention under<br />

Watershed management.<br />

Production of cereals and pulses have increased over last 30 years but during the same time period, total cropped area declined marginally<br />

. Area under vegetables has registered an increase during the last three decades. For traditional crops, fertilizers use is generally 40kg/ha, whereas for<br />

both HVC and fruits, this is up to 60 kg/ha. Agricultural practices are contributing to soil erosion and people are facing marketing related challenges.<br />

These gaps will be bridged through implementation of watershed development projects.<br />

This subcomponent will improve cropping systems through promoting adoption of new agronomic practices, crop diversification into high­<br />

value crops, reducing post­harvest losses and increasing value­addition. It will also improve water availability in the Project area using evolving water<br />

harvesting technologies and promoting optional use of available sources. The activities such as Land Development and to introduce improved cropping<br />

system, Introduction of High­Value crops / varieties, Improve cropping systems (Horticulture), Homestead Horticulture and High yielding Cultivars will be<br />

introduced in the watershed areas. The Agriculture will continue to remain the main source of income for the community in the project area, support will<br />

be provided for the traditional crops as well as the High­Value Crops (HVCs)<br />

‐ 153 ‐


While preparing the DPR the focus has been given for the land development activities particularly for the development of lands of weaker<br />

section with the active participation of the beneficiaries. The activities such as protection of soil erosion and introduction of vermi­culture will be<br />

given priority under watershed development within the prescribed limit of outlays as per common guidelines for watershed development. The<br />

convergence of other on going schemes relating to area development and poverty alleviation will also be taken into account on formation of<br />

action plan. Major emphasis will be given on the production of HVCs especially for those areas where new irrigation resources will be developed.<br />

This will include off­season vegetables, spices, floriculture, medicinal and aromatic plants. For vegetables and spices where the local market is<br />

available or can be stored before sale, demonstration will be laid out in an area of maximum 0.2 ha for one family. Besides the seed planting<br />

material, training / exposure visit, demonstration will be provided to build the confidence and know­how about the latest technology.<br />

For HVCs such as medicinal and aromatic plants which have no local market and the produce has to be partially or fully processed, a<br />

strategy will be developed to identify a new potential crops which (a) can be successfully cultivated in the Project area: (b) perfect production<br />

technologies are available: (c) quality seed and planting material can be made available in time: (d) facilities exist for processing or can be made<br />

available if essential before the produce can be marked: and (e) assured markets are available (specific trader with commitment and an<br />

important stakeholder( following will be the approach to facilities introduction of such crops.<br />

Farmer’s nurseries will be encouraged through training and providing support on cost sharing basis for greenhouse, plastic tunnels etc. The<br />

benefits of green house for high breed vegetables, floriculture and for nursery rising will be admissible to the framers from project funds as per<br />

provision exist under Horticulture Technology Mission.<br />

The support will be provided from the introduction of fruit crops in terms of quality seedlings for a family with the condition that all other<br />

practices will be implemented by the beneficiary as per agreed technology.<br />

‐ 154 ‐


(ii) Animal Husbandry and Diary development:<br />

Rising up of livestock is an integral component of rural economy for Arunachal Pradesh in general & west Siang in particular. There is a<br />

dynamic relationship between common property resources such as forest, water and grazing land, livestock and crops. Livestock depend at a<br />

certain extent on fodder and grass grown on common property resources as well as on crops. At the same time the animals returns, fodder grass<br />

and crop, residues to the common property resources and fields in the form of manure and provide much needed drought power.<br />

The perspective plan laid emphasis on the livestock sector and established Cows semen processing lab for breed improvement, emphasized mineral­<br />

mixture feed supplements provided chaff cutters, and promoted stall­feeding and the other facilities to the farmers in project areas as per admissibility in the<br />

guidelines and in other on going schemes.<br />

The main activities which will be considered under Watershed Development Project to enhance livelihood are as under:<br />

Lohit has no recognized breed of cattle except MITHUN and the livestock population mostly comprise of non­descript type with relatively low<br />

milk production potential. The productivity of animal maintained under village condition is comparatively low. Cattle­ Mithun & cow/ox of locals and Pig rearing<br />

for meat is the prominent animal husband dry occupation of the rural people and 90% of these rural households are engaged in keeping the livestock for<br />

supplementing their source of income and nutrition. Mitthun rearing fetch the villagers with huge income as it is one of most earning professions where<br />

manfolk engage themselves. A succesful farmer engaged in MIthun rearing is able to provide financial needs of children’s education & other exigencies as<br />

single Mithun is sold off for a price of Rs.15,000 to 32,000 based on size for meat or other rituals/ marriage purpose. Mithun rearing is a sacred job the<br />

community consider as it is recognized a precious domesticated cattle which is used in matrimony, rituals & having a huge meat value. It’s sale rate is around<br />

Rs.130­150/kg. This project will endeavour to undergo some systematic rearing of Cow & Mithun with needful facilities in collaboration of AHV at project area.<br />

In predominately agrarian economy of the district, agriculture and animal husbandry is the main stay for more than 80% of the rural people. The<br />

agriculture in general is restricted due to hilly­terrain, full of climatic hazards and small and scattered land holding with limited irrigation. Besides, agriculture,<br />

the farming families are having livestock as a primary or secondary source of earning from the sale of livestock and their produce such as milk, Mithun,Cows,<br />

Pigs, goats & their products, wool mutton etc. As a result of the ongoing cattle breeding programmes, the average milk production of cross breed cow is very<br />

low per day. The department has planned to increase the population of crossbreed cows from the present level in order to enhance the milk production<br />

‐ 155 ‐


substantially per day & meat from these cattle. The milk production shall be achieved by supplementing the present infrastructure by providing 100% breeding<br />

facility through the artificial insemination. Milk production shall be simultaneously sustained by boosting fodder production by cultivation in the field during both<br />

the Rabi and Kharif fodder production season for which a timetable for greens fodder production round the year shall be evolved. Cattle rearing will also<br />

attribute. Improved fodder seeds shall be distributed to the identified farmers as a cash crop to exploit milk production potential of a cross breed progeny.<br />

Factors like cattle breed, feeds and fodders, are variation, water supply, clean and hygienic sheds, disease free status, macro and micro nutrient level, stage of<br />

milking and frequency of milking are responsible for variation and production of milk, which needs to be taken into consideration of improvement under one or<br />

the other components for ensuring maximum level of production of milk. Cattle rearing will also attribute Mithun for the purpose of systematic rearing for<br />

employment generation, income & creating awareness of rampant slaughter may lead to extinction of the species for which we are the proud owner To<br />

promote these activities Self Help Group / Society Mode approach can be given emphasis so as to make them self­reliant and help them BPL families giving at­<br />

least 60% representation to woman and SC/ST families but the non BPL families can be considered for benefits as admissible under the common guidelines for<br />

watershed management<br />

The main objective of this venture is to develop the milk production & meat and to generate self­employment potential. To ensure the availability of<br />

fodder during dry season and to facilitate the weaker section of the society, the provision of fodder stores and cattle sheds can be considered the milk/ meat<br />

so produced shall be marketed directly by the self­help groups or through the already existing net work of Milk Society / Milk Federation. & meat in the local<br />

daily markets.<br />

iii). Goat Husbandry:<br />

Goat farming is a traditional occupation of economically weaker segment of the society having twin purpose i.e. wool development and meat<br />

production particularly in Tribal belts and remote areas of the State Comparatively, lower body size of the two species and their adoptability of<br />

vide range of agro­climatic condition have rendered them suitable for poor farmers. These animals are predominantly under extensive range<br />

management on community range land, cropped land after harvesting of standing crops and forest under mixed grazing conditions. The<br />

management of small ruminants does not require specialized skills: the surplus labour is gainfully employed for management and upkeeps of the<br />

animals. In West Siang, the organized breeding programmes, feeding management, husbandry practices, health coverage and marketing linkages<br />

are not adequate.<br />

‐ 156 ‐


The National Institute of Nutrition has recommended that a balance human diet should comprise of 11 KG of meat per annum. The available<br />

figures show that the current availability of meat is only 2.26 KG. Therefore the rapid increase in meat production is a necessity. But the lack of<br />

technical know how, improved bread and lack of marketing awareness are the main hurdles which are also effecting the economic health of<br />

particularly those families which entirely depend upon this activity. In order to boost and make this venture successful and more economic<br />

generating factor the following activities are proposed under this component:<br />

• To supply the veterinary facilities and equipments.<br />

• To improve breed through cross breeding with improved quality breed.<br />

• To impact training and technical know how to the breeders in order to improve their skill in sharing and breeding etc.<br />

• To establish wool research and quality control laboratories for research and extension work in wool.<br />

• To established wool procurement and grading centers.<br />

• To facilitating marketing of wool within a State and outside the State.<br />

• To promote production shearing, procurement and processing of the wool.<br />

� Poultry Farming:<br />

In Lohit , Poultry Farming has shown vast potential of self employment opportunity and augmenting the nutritional status of the rural<br />

population by enhancing the availability of proteins in the diet at a reasonable cost in view of decreasing trend of per capita availability of pulses.<br />

The poultry Farming in the district play an important role in improving the socio economic status of rural population because Poultry<br />

Farming requires minimum status of rural population requires minimum capital and ensure quick returns. The sale of eggs on day to day basis<br />

helps in increasing crop production through purchase of essential inputs such as seeds and insecticides etc., while the broiler faming provide<br />

handsome return for major investments at the farmers level. Therefore, need to start a chicken scheme in rural for major investments at the<br />

farmers level. Therefore, need to start a chicken scheme in rural area under watershed Development Programme especially of dual purpose<br />

variety, efficient for both egg as well as meat production as needed to make the rural inhabitants especially poor families self dependent. The<br />

people of district prefer quality units of small size i.e. 50 to 100 birds each rather then big units. The State department of Animal Husbandry has<br />

also developed poultry faming in the State through their net work.. The topography and the climate condition of the State are such that small size<br />

Poultry Farm are more successful. As such need to start small faming under subsidy especially for the beneficiary belonging to scheduled tribe<br />

families and marginal farmers in the project are is felt so that the poorest families are provided an incentive for starting poultry farming as an<br />

‐ 157 ‐


occupation. Under the proposed scheme one time assistance on sharing basis as per provision of guidelines in the form of poultry Farm sheds,<br />

chicks, equipments, medicines, Training and marketing will be provided.<br />

� Fishery Development:<br />

The scope of pond fish culture existed in the district but due to hilly terrain, valley and complex topography the better result under this<br />

component are yet to be achieved. In cold areas there are good scope for Trout culture and other cold water fishes. As such a scheme of fresh<br />

water fish culture in the district can be boosted successfully in private sector. The trout, which is international known fish is being cultured in the<br />

Government Farm. To take up this activity in project mode, some infrastructure will be setup, awareness activities amongst the people to be taken<br />

up on campaign and sustained basis, beside, raw material, seed and feed and marketing network need will be strengthened. The objective of the<br />

component is to generate more employment opportunity in fishery sector, to make fish farming a common man livelihood activity and to utilize the<br />

wasteland trout farms.<br />

One unit of trout farming required construction of at­least two cemented raceway with a provision of RCC wall (15m x 2m x 1.5m)<br />

which involve approximately Rs. 1.20 lacs, with each raceway costing Rs. 0.60 lac.<br />

Basic principle of Trout culture is “Running Water fish Culture”. Which lies in intensive stocking and fish rearing in barricaded longitudinal<br />

stretch well guarded by inlet and outlet properly flow of water required to each unit varies form 200­400 L/sec. Besides this facilitation of<br />

transportation for inputs and products, since fishery is a perishable commodity it needs to be transported in cool chain to the market. For this<br />

purpose special funds provision required.<br />

� Horticulture:<br />

The Horticulture section, which includes fruits has ample potential for development as compared to other crops in the Northern Eastern State<br />

of Arunachal Pradesh in view of diverse agro­climate condition, varying soil types and abundance of rain fall which has remained unexploited.<br />

The development of NE region examined by various commissions and committees recommended Integrated Development of Horticulture<br />

based on the recommendations a centrally sponsored scheme on technology mission for integrated development of horticulture.<br />

‐ 158 ‐


The Horticulture Technology Mission is working in the State with the goal to establish convergence and synergy among numerous on going<br />

governmental programmes in the field of horticulture development to achieve horizontal and vertical integration of these programmes to ensure<br />

adequate, appropriate, timely and concurrent attention to all the links in the production, post­harvest management and consumption chain.<br />

Maximize economic, ecological and social benefits from the existing investments and infrastructure created for horticulture development, promote<br />

ecologically sustainable intensification, economically desirable diversification and skilled employment to generate value addition, promote the<br />

development and dissemination of eco­technologies based on the blending of the traditional wisdom and technology with frontier knowledge such<br />

as bio­technology, information technology and space technology, and to provide the missing links in ongoing horticulture development projects.<br />

The components / activities of Horticulture Technology Mission will be adopted in the implementation of Watershed Development Programme.<br />

The small nurseries will be developed and provision will be made for the availability of plant material, equipments and Farm Tools besides<br />

facilitating the families in watershed areas with sufficient availability of water, birds’ protection nets, post harvest management technology in the<br />

cluster approach. Green House approach will also be given due weigtage under this component. Since the district is hilly terrain and in case of<br />

the areas where road connectivity is lacking the ropeways connectivity for trans­shipment of the agriculture horticulture product will be<br />

introduced. This will not facilitate the farmer for transshipment of their produce but also the transportation charge will be less in comparison to<br />

transportation of their produce through roads.<br />

� Bee Keeping:<br />

Small farmers of the district have adopted Bee keeping with the objective to produce disease resistant types as well as best quality honey and<br />

to promote the role of honey bee as agent of pollination for increasing crop productivity. Crop plants are cross­pollinated, as they need to receive<br />

pollen from other plants of the same species with the help of external agents. One of the most important such external agent are the honeybees. A<br />

few colonies of honeybee when placed in the filed, when crop is in flowering stage, press into service several thousand foragers for pollination. The<br />

abundance of pollinators, help in early setting of seed, resulting in early and more uniform crop yield. Scientific studies have established that increase<br />

in yields of various crops due to the pollination by honey bees range from 20% to 100%. On the basis of published information, 12 crops of<br />

economic importance such as almond, apple, coconut, grape, guava, mango, papaya, mustard, sunflower, cotton etc. are specifically dependent<br />

upon or benefit from honeybees pollination. Honeybees also produce honey, bee wax and royal jelly thus giving additional benefit to farmers.<br />

Moreover, honeybees do not limit their pollination services to a single species rather a large number of agricultural crops are pollinated by them. To<br />

encourage the groups of BPL / small farmers at district level bee keeping equipments with latest technology to assist the procurement storage and<br />

marketing of honey will be patronized under watershed development projects.<br />

‐ 159 ‐


� Mushroom Cultivation: The cultivation of mushroom was initially started because of rich contents of protein its cultivation has gained<br />

momentum, and there is large scope for cultivation of mushroom in the district on commercial scale. The Mushroom Development Project under<br />

the aegis of United National Development Programme was established in 1977. Under the Programme, the inputs such as compost, casing, soil &<br />

spawn etc. are supplied to the mushroom growers. Now this project has converted into National Centre for Mushroom Research and Training by<br />

the Government of India. Besides, making research and imparting training this centre is providing various incentives to the small­scale farmers<br />

and un­employed youths for the cultivation of mushroom. Resultantly Papum pare district of the State has been able to come up on the<br />

production Map of mushroom cultivation. In order to enhance the productivity of mushroom in the State, this activity will be adopted in the<br />

suitable areas by making the provision of funds for construction / renovation of mushroom sheds. Making provision of subsidy as per admissibility<br />

in the common guidelines will cover the other components of mushroom cultivation such as compost and spawn.<br />

� Cultivation of Medicinal / Aromatic Plants: A number of species, mostly important herbs of mid hills and particularly high hills required<br />

special attention for conserving them These species are threatened primarily due to habitant degradation, weed invasions and over exploitation<br />

(rampant extraction), as these are sources of livelihoods for poor. Plantation of sea buckthorn will be given high priority in cold desert areas and<br />

plantation technology for sea buckthorn will be standardized through collaborative research for wider adoption and acceptance. Better and<br />

modern nursery management practices will be adopted at block level to ensure the availability of quality planting stock.<br />

The climate and geographical condition of the District are suitable for growing medicinal and aromatic plants. An important aspect of this<br />

trade is that 24 species out of the top 100 medicinal plant species traded in the country are found in the State. An assessment in the buffer zone of<br />

Grant Himalayan National Park about the contribution of medicinal plants to the economy of forest side people reveals that harvesting and trade of<br />

medicinal plants get every household and average annual income of Rs. 14000. The trade in medicinal plants is largely unregulated, secretive and<br />

exploitative and takes place in the form of raw material. People therefore, do not get benefits of possible value addition to this raw material. Keeping in<br />

view the market requirements, cultivation of selected medicinal plants such as Kuth (Saussurea lappa) , Poshkar (Inula racemosa) and Caraway (Carun<br />

Carvi) will be done in the tribal region and have proved vary productive for the tribal population of other States. Similar initiatives in temperate Zone<br />

with selected high value species will be very fruitful to the farmers in augmenting their cash return.<br />

Most of these plants are collected from the natural forests and sold to the ‘local’ traders and middlemen on charging a very nominal export and<br />

collection fee for exporting these herbs outside the state.Regular exploitation of these important plants from their natural habitat. Production and<br />

collection as recorded by the State Forest Department is practically too less than the actual and which has also noticed a drastic decrease. Local people<br />

‐ 160 ‐


who were depended on these resources for augmentation of their cash earning are facing a lot of difficulty in meeting their day to day requirements.<br />

Since the agriculture is the main occupation of the rural people and collection of minor forest produce such as medicinal herbs was the easiest way of<br />

generating income for the families, which needs to be protected.<br />

Cultivation of selected medicinal plants of known commercial value is the need of hour and can arrest the on going exploitation from<br />

natural forest Development of cultivation practices will be useful on one hand to the local people as additional source of income and on the other hand<br />

technology will help in the conservation of these important biodiversity.<br />

There are a number of Protected Areas for which restricted area permits (RAP) are taken for access in districts of state. Access denial to<br />

resources affects livelihoods of communities in and around protected area. Besides the PA, there are some good quality patches of natural habitats<br />

falling in the State and these areas may require special attention. Under watershed Development Programme the cultivation of medicinal / aromatic<br />

plants will be propagated for generation of additional income of the people of watershed areas.<br />

� Sericulture: Mulberry based sericulture is a land – based activity with good potential for generating productive employment. It are several<br />

advantage such as labour intensive nature, low capital investment, short gestation period and good market. It has also special significance in<br />

employment of women and aged who have limitation like low resource base of less physical stamina or due to social custom against working<br />

outside the home. In the lower hills of the district majority of families are engaged in sericulture activities who are producing good quantity of<br />

cocoons and also earning good return. There is an existing network of technical service station and mulberry plantation, which provide a technical<br />

input to the farmers and which need to be further strengthened.<br />

However, sericulture is still being practiced in the most traditional way and in unhygienic condition, which has restricted growth of<br />

sericulture both in quality and quantity. The need of hour is, therefore, to organize the poor families in SHG’s and motivate them to adopt latest<br />

‐ 161 ‐


technology developed by the technical agencies, viz by adopting low cost humidity free rearing structure along with local technology inputs. Under<br />

Watershed Development Project the technical assistance and other inputs would be provided to rural poor for adopting sericulture as alternative<br />

economic activities.<br />

The Benefits to the poorest section of the society by way of organizing them into SHGs will be provided from project funds and necessary<br />

technical infrastructure will be created as per requirement of DPR. The capacity building infrastructure, technology and credit & marketing support will<br />

also be provided.<br />

Under Watershed Project additional area shall be identified and following opportunities will be created:<br />

• Macro propagation of Mulberry Plantation by involving SHG, GP, Yuvak Mandals, Mahila Mandals etc.<br />

• To double the numbers of existing sericulture families by introducing multiple rearing pattern.<br />

• Forward linkage by way of introducing silk reeling and weaving.<br />

� Mining:<br />

Unscientific mining of sand, aggregates, sand stones, limestone etc., is on the rise Based on conservative estimate, Huge quantities of sand,<br />

gravel and boulders are extracted annually from river / streams. Apart from generating substantial direct revenue of Rs.7016.35 lakh during 2004­<br />

2005 which has gone down to 193.51 lakh during 2006­07 with generation of direct / indirect employment in far flung areas of the State. Although<br />

the activity of mining cannot be adopted frequently due to environmental hazards but where the resource of livelihood depends on mining this<br />

activity can be considered under watershed development project subject to permission of competent training and mining techniques to ensure<br />

minimum damage to environment.<br />

� Handicrafts and Handlooms: Handicrafts are an important cottage Industry of District and have the second largest employment potential in<br />

the rural sector being next to Agriculture. Importance of Handicrafts Industry in the economy lies in the artistic designs, low capital investment<br />

and family based skills, which passes on from generation to generation with no formal training. Since the activity is not taken up as primary<br />

occupation & much of attention not provided for adequate design, the required price is not achieved & hence discouraging. There is a need to<br />

attribute more attention by communities in the project area with more artistic look & professionally. The state Govt. has set up Handicraft and<br />

Handloom Directorate with the primary objective of up­liftment of weavers / artisans of the Pradesh. The handicrafts, handloom and other rural<br />

‐ 162 ‐


artisan’s activities will be given priority under watershed development programme for additional income generation by the watershed<br />

communities.<br />

� Eco­Tourism: A wide variation in the geographical and climate condition prevailing in Arunachal Pradesh & Lohit has resulted in vast potential<br />

in tourism. In fact, the prevailing makers have always considered tourism as an industry while formulating strategy for actualization of this<br />

potential. If guided by the right policy, this particular industry has a potential for long term sustenance as well. Clean and beautiful environment,<br />

waterfalls, virgin forests, historic monuments and hospitality of the native people of the State complete the indicative list of prerequisites for<br />

sustaining tourism related activities in the long run. The potential for earning livelihood not only by the urban population but also by rural<br />

population of the district in this sector is immense. Tourism helps providing employment mainly in three ways:<br />

• Direct employment by rendering of hotel and catering services, as porters transport and working as tourist guides.<br />

• Employment through production of goods and services required by the tourist during their stay at the destination.<br />

• Employment through the activities undertaken for development of infrastructure required for promoting tourism.<br />

• Sumo Services to travel to hilly & zig­zaag destination.<br />

The number of tourists visiting in Arunachal Pradesh & districts has been increasing over the year. The number of tourists who visited the<br />

State in the year 2001­2002 was 6077 and this number declined to 51755 in 2006­07. Lohit has vast tourist potential, a large part of which is still<br />

unexploited. The entire region is known for their clean environment and raw beauty in terms of high snow clad mountain peaks, meadows, thick forests,<br />

wide range of flora and fauna and places of historic and religious importance. This region has slight advantage in term of natural beauty as compared to<br />

that available in the Low Hills and the Valleys and the Plains.<br />

Promoting tourism in the lesser known areas through a suitable designed policy will surely help in providing livelihood opportunities to the<br />

people living in these areas on sustainable basis. The tourism industry in the recent past has ventured into the field of recreational travel, adventure and<br />

sports tourism ands cultural tourism. Under Watershed management, the places of high attraction of tourists & others will be developed by adopting the<br />

activities linked with eco­tourism in identified areas. The big Check Dams / Ponds having the scope of boating / water games etc. the assistance from<br />

the watershed management Programme will be provided to the youths for purchase of boat, Dhabas and other business activities etc. Another segment<br />

‐ 163 ‐


which has a vast potential for promoting tourism is health tourism in term of herbal and medicinal plants cultivation. There is also a need to convert<br />

Arunachal Pradesh in general & the district in particular from being a holiday destination of medicinal / aromatic, plant will be propagated to attract<br />

more tourist and to generate additional income of the people of rural areas.<br />

The quantum of funds for these activities would be made according to the admissibility in the guidelines.<br />

� Micro Enterprises and Skill Up gradation:<br />

In Lohit approximately 70.62 % rural households are living below the poverty line. Apart from BPL families, some other households are<br />

having very small holdings. These households are mostly dependent for their survival on the agricultural, animal husbandry and other labour<br />

intensive activities. But due to limited opportunities and lack or technical know how the youth of rural area are visiting other places especially in<br />

urban areas for employment. Due to meagre opportunities of jobs for non technical persons in industries, these youths are either engaging<br />

themselves in uneconomical jobs or remained idle for long period involving wasteland expenditure and wasting valuable time. If the employment<br />

opportunities to the youths in micro enterprises are ensured at their door steps or nearby areas, the valuable time and expenditure can be saved and<br />

financial status of these families will be improved. Thus the opportunities exist under Watershed Management for skill up gradation of rural youths<br />

through reputed / recognized institution / organization in the field of micro enterprises. In the present scenario the electronic related items are<br />

available with almost every rural household and in case of any defects in these item the solution is to get repaired these items in the market or by<br />

engaging the mechanics with is time consuming as well as the costlier affair. It the youths of the area or nearby area are trained in these activities,<br />

the wage employment to the needy person and saving in the expenditure can be ensured at village level. Similarly the Refrigerator repair, Motor<br />

repair, Welding etc. can also be considered as trade for skill up gradation of rural youth in project area. Other professions like Masson Carpenter are<br />

also important mean of income generation in rural areas. But due to change in living standard of the people, the modern items are being used for<br />

construction / decoration of buildings for which the latest technical skills is required to be upgraded of the persons involved in massonary and<br />

carpenter works to earn sufficient income of rural poor people by providing assistance and skill up gradation training under these trades. The Animal<br />

Husbandry is most important mean for livelihood enhancement in rural area. But due to lack of proper marketing arrangements, the inhabitants use<br />

to sell their produce in throw away prices to the middleman. In case the local youths are trained in the preparation of especially bio product of milk<br />

such as cheese khoa etc. the wage employment opportunities will be increased and producer will also get more income from their products. The<br />

other trade relating to food products like Sepu Bari, Pickles, Souses, James, Juices and food cum medicinal items like Anbia Candi, Trifla, Murba etc.<br />

can also change the economic status of rural people in case these items are prepared properly in hygenic condition by maintaining standard. The<br />

training on these trades will be fruitful in relation to self employment opportunities and to increase the economic status of rural people. To make the<br />

‐ 164 ‐


ural youth self dependent the watershed Development Programme can be the most useful tools especially to build their skill / knowledge. It is<br />

therefore proposed that the self help constituted; and proper training for up gradation of their skills will be provided as per provision in the<br />

Watershed Development guidelines to make them self employed by adopting income generating activities.<br />

To upgrade the skill and to start the income generating activities, the provision of subsidy will be kept to all the rural household comes<br />

under the category of marginal farmers, unemployed youths, Agriculture labourer, non agriculture labourer and rural artisans through self help groups<br />

irrespective of their selection in BPL list. But the quantum of benefit would not be more than the prescribed limit under SGSY, in other projects and provision of<br />

the guidelines. However, the first priority for these benefits will be the BPL families/ST population.<br />

Watershed Development Fund (WDF):<br />

People’s contribution towards WDF is a mandatory condition for selection of village for watershed projects. The contribution will be 10% of the cost of<br />

NRM works executed on private land which will be a minimum of 5% in case of SC / ST. Other cost intensive farming system activities such Aquaculture,<br />

Horticulture, Ago­forestry, Animal Husbandary on private land directly benefiting the individual farmers, contribution will be 40% for general categories and<br />

20% for ST / SC beneficiaries.<br />

These contributions are acceptable either in cash at the time of execution of works or voluntary labours. An equivalent to the monetary value of<br />

the voluntary labour would be transferred from watershed project account to the WDF Bank Accounts which will be maintained separately apart from WC bank<br />

Account. User charges, sale proceeds and disposal amounts of intermediate usufruct right shall be deposited in the WDF account. Income earned from asset<br />

created under the project on common property resources shall also created to be WDF.<br />

Secretary, Watershed Committee shall maintain separate Account of income / expenditure of WDF. The rules for operation of WDF shall be<br />

prepared by watershed committee and ratified by PRI. This Account shall be operated by President of GP and any members from SHG nominated by Gram<br />

Sabba. The guidelines for management and utilization of WDF shall be evolved by SLNA / DoLR, GOI.<br />

‐ 165 ‐


After completion of phase­II at least 50% of WDF shall be reserved for maintainenance of assets created on community land or common use<br />

under the projects (work taken up on private land shall not be eligible for repair / maintenance of this fund).Remaining money to be used as revolving fund to<br />

advance loan to the villagers of the project area who have contributed to the fund. Individual / charitable institution shall be encouraged to contribute<br />

generously to this fund.<br />

In the instant projects the assets created are anticipated for common use although works are taken up on private land hence 50% of WDF funds<br />

is to be allowed for maintenance of asset. Remaining used as revolving fund to the villagers of the project area. Any remaining fund as a result of interest<br />

accrued by generous contribution by individuals / charitable institutions shall be mooted for onward transfer to the user group under the supervision of WC /<br />

PRI / W<strong>CD</strong>C, DRDA with proper Exit­protocol as per time to time instruction communicated by SLNA.<br />

PHYSICAL & FINANCIAL <strong>PROJECT</strong>IONS OF IWMP­I­WAKRO <strong>CD</strong> <strong>BLOCK</strong>:<br />

To achieve the objective of Watershed Development Project and to enhance the livelihood opportunities total 9955 hectare areas( Wakro,<br />

Kathan, Cibi, Tilangkyong, Old Pukhuri, Towam, Tamiliang & mawai­I) has been proposed for treatment in this DPR as IWMP­I­Wakro <strong>CD</strong> Block of<br />

the district of the State. The proposed area will be treated in a phased manner within a period of 4­7 years and involvement of Panchayati Raj Institutions and<br />

local communities constituted & annexed herewith will be ensured at each level to achieve the objectives of the watershed Development Projects. The financial<br />

provision as made in the guidelines are not sufficient for treatment of whole proposed areas but the concept of convergence is important for adding additional<br />

financial resources to be taken up as the concept of convergence is important for adding additional financial resources to take up the suitable infrastructure<br />

and livelihood related activities. The additional provision of funds are required for implementation of watershed project in the hilly areas of Arunachal Pradesh,<br />

However with the possibilities of increase in per hectare norms for hilly areas, the per hectare cost norms has been approved at the rate of Rs. 15,000/­ per<br />

Hectare instead of 12000/­( Plain ) & Rs.6000/­( earlier).<br />

The component wise phasing along with work plan showing physical and financial program of watershed development for a period of 4 years along<br />

with the activities to be taken up at each location as identified is depicted in the DPR­which shall be adhered in toto during execution. Lohit with Wakro<br />

being predominantly a hilly district with difficult terrain a financial outlay of Rs.15,000 per ha. has been taken . Thus a total outlay of<br />

Rs.14.93250 crores ( central share of 90% ­ Rs13.43925 crore & State share of 10% ­1.49325 crore ) has been projected for a period of 4<br />

years which may even be extended on unavoidable circumstances but not exceeding to 7 years subject to proper review/recommendation<br />

‐ 166 ‐


of SLNA & approval of DOLR,GOI. The financial provision required for the 1 st instalment (20% which shall be released in phases­6%<br />

instantly on receipt of sanction by SLNA followed by 14 % on DPR submission & recommendation of SLNA to DOLR,GOI), 2 nd instalment (50<br />

%) & 3 rd instal (30%).<br />

As per common guidelines para 9.3, the following budget component has been prescribed for the project:<br />

Budget Component:<br />

Sl. No Components Provisions (%age)<br />

a)<br />

1 Administrative Cost 10%<br />

2 Monitoring 1%<br />

3 Evaluation 1%<br />

b).Preparatory Phase<br />

1. Entry Point Activities 4%<br />

2. Institutional and capacity building 5%<br />

3. Detailed Project Report 1%<br />

c).Watershed work Phase<br />

1 Watershed development works 50%<br />

2. Livelihood activities 10%<br />

3. Production system and micro enterprise 13%<br />

d).Consolidation Phase<br />

1 Consolidation phase 5%<br />

Grand total (a + b + c + d) 100%<br />

‐ 167 ‐


a).COMPONENT WISE FINANCIAL OUTLAYS <strong>FOR</strong> TREATMENT OF 9955 HECTARE<br />

LAND AGAINST IWMP­I­WAKRO <strong>CD</strong> <strong>BLOCK</strong> (@ Rs. 15,000/­ per hectare :<br />

Total Project Area : 9955 Ha.<br />

Total Budget :Rs. 14,93,25,000<br />

Sl. No.<br />

Budget distribution of IWMP WAKRO.<br />

Particulars ( Budget<br />

Component) Norms (%)<br />

Total amount<br />

(Rs. in lakhs) Remarks<br />

1 2 3 4 5<br />

1 Administrative over head<br />

i) Administrative Costs 10 14932500.00<br />

ii) Monitoring 1 1493250.00<br />

iii) Evaluation 1 1493250.00<br />

2 Preparatory Phase<br />

‐ 168 ‐


i) Entry point activities, 4 5973000.00<br />

ii) Institution and capacity<br />

building 5 7466250.00<br />

iii) Detail Project Report<br />

(DPR) 1 1493250.00<br />

3 Watershed works phase<br />

i) Watershed development<br />

works 50 74662500.00<br />

ii) Livelihood activities for the<br />

asset less person 10 14932500.00<br />

iii) Production system and<br />

micro enterprises 13 19412250.00<br />

4 Consolidation Phase 5 7466250.00<br />

Total 100 149325000.00<br />

‐ 169 ‐


Total Cost : Rs. 1493.25<br />

GLANCE OF YEARWISE EXPENDITURE TO BE INCURRED AGAINST IWMP­I­WAKRO <strong>CD</strong> <strong>BLOCK</strong>.<br />

Central Share : Rs. 1343.925<br />

State Share :Rs. 149.325<br />

Sl No Year Installment<br />

Percentage<br />

release<br />

Central<br />

Share<br />

Amount<br />

State<br />

share Total<br />

‐ 170 ‐<br />

Expenditu<br />

re to<br />

be made<br />

in which<br />

year<br />

Activities to be<br />

taken up<br />

along with<br />

financial<br />

involvement<br />

1 2 3 4 5 6 7 8 9 10<br />

1 1st Year 1st installment 20%<br />

2<br />

2nd & 3rd<br />

years 2nd instalment 50%<br />

3 4th year 3rd instalment 30%<br />

4 years<br />

3 Nos of<br />

Instalment 100%<br />

2687850<br />

0.00<br />

6719625<br />

0.00<br />

4031775<br />

0.00<br />

1343925<br />

00.00<br />

2986500.0<br />

0 29865000.00<br />

7466250.0<br />

0 74662500.00<br />

4479750.0<br />

0 44797500.00<br />

14932500.<br />

00<br />

149325000.0<br />

0<br />

2009­<br />

2010<br />

As per work­<br />

plan<br />

2010­<br />

2012 do<br />

2012­<br />

2013 do<br />

Remar<br />

ks


N.B.: a). The project should be completed within 4 years but may vary 4­7 years under exceptional cases subject<br />

to approval of SLNA & DOLR, GOI on reasonable grounds.<br />

b).The watershed development funds(WDF) shall be used as per provisions of guideline ( 50% to be used for maintenance of<br />

assetts created for common use & remaining for providing revolving funds to the villagers of project area ) & balance of<br />

interest accrued/ contributions of volutary organizations to be transferred to UGs of the respective project area under the<br />

supervision of WC/PRI/PIA/W<strong>CD</strong>C for income generation,post project management on community land.The Exit­Protocol<br />

mehcanisms shall be evolved by WC/PRI of project area under guidance of PIA/W<strong>CD</strong>C,DRDA.<br />

The Treatment plans & activities identified to be carried out for the project is highlighted as follows­<br />

1).Watershed Development Plans for IWMP­I­Wakro <strong>CD</strong> Block:<br />

WORK PLAN <strong>FOR</strong>MULATED UNDER THE INTEGRATED WATERSHED MANAGEMENT PROGRAMME.<br />

Name of the project:IWMP­I­ Wakro <strong>CD</strong> Block( Wakro,Kathan, Cibi, Tilangkyong, Old Pukhuri,<br />

Towam, Tamliang& Mawai­I) .<br />

‐ 171 ‐<br />

Project Outlay: 1493.25 lakhs<br />

District: Lohit Total Area: 9955 ha<br />

WC: 1<br />

no<br />

SHG: 03<br />

nos<br />

State: Arunachal Pradesh Date of Apprvl. Of the Work Plan as in DPR:<br />

Date of Sanction:3rd Nov'2009.<br />

UGs:03<br />

nos.


Sl.<br />

No<br />

Activites Cost<br />

/<br />

Unit<br />

‐ 172 ‐<br />

Target ( Activities to be taken up) Total<br />

Year­1 (2009­10) Year­2 & 3(10­12) Year­4(2012­13) Year<br />

Physical Financial Physical Financial Physical Financial Physical Financial<br />

1 2 3 4 5 6 7 8 9 14 15 16<br />

1<br />

2<br />

Financial Assistance given for<br />

I Administrative Costs(10%). 29.865 74.6625 44.798 149.325<br />

II Monitoring (1%) 2.99 7.47 4.48 14.93<br />

III Evaluation(1%) 2.99 7.47 4.48 14.93<br />

Sub­Total 35.84 89.60 53.76 179.19<br />

Preparatory Phase (<br />

Nos):<br />

I Entry PointActivities (4%)<br />

a).Repair/upgradation of<br />

communities assetts for use of<br />

WC in watershed activities.<br />

2 8.93 2 8.93<br />

b).Repair/ Renovation of farm<br />

ponds 2 8.00 2 8.00<br />

Remarks


c).Upgradation of land protection<br />

for productivity management. 2 6.30 2 6.30<br />

c).Repair / restoration of<br />

damaged water supply intake<br />

points, platforms . 2 7.50 2 7.50<br />

d). Renovation of Community<br />

buildings. 2 6.50 2 6.50<br />

e).Recharging of natural Spring &<br />

renovation i/c Channelization . 2 4.50 2 4.50<br />

e). Establishment of Transit local<br />

hut with drinking water supply<br />

tank ( 5m x 5m, ht­3m) i/c water<br />

supply arrangement i/c<br />

approaches, cc footpaths to<br />

community assetts.<br />

f).Others (WC,SHG, UG<br />

formation,Awareness<br />

geneartion,IEC,Baseline surveys,<br />

Tech­network,DPR, Resource­<br />

use agreements, participatory<br />

monitoring etc.)<br />

3 6.00 3 6.00<br />

12 12.00 12 12.00<br />

27 59.73 27 59.73<br />

‐ 173 ‐


3<br />

II<br />

Institution & Capacity Building<br />

(5%)­ (In nos) which includes: 14.93 37.33 22.40 0 74.66<br />

i).Community Sensitization &<br />

PRA exercise etc. 3 7.93 4 10.16 2 4.00 9 22.09<br />

ii).Training of all PIA<br />

staff,WDT,WC,SHGs,UGs etc. 3 7.00 7 14.00 4 8.00 14 29.00<br />

iii).Exposure visits & others 4 13.17 3 10.40 7 23.57<br />

6 14.93 15 37.33 9 22.40 30 74.66<br />

III DPR (1%) 1 14.93 1 14.93<br />

Sub Total 34 89.59 15 37.33 9 22.4 58 149.32<br />

Watershed Works<br />

Phase: 74.64 186.60 111.96 373.20<br />

A). Watershed<br />

DevelopmentWorks<br />

(50%):<br />

I<br />

Soil & Moisture Conservation<br />

Works( ha) 24.60 61.50 36.90 123.00<br />

a Vegetative barriers 26.67 4.00 80 12.00 53.33 8.00 160 24.00<br />

b Gully Plugs 40 6.00 33.33 5.00 73.33 11.00<br />

‐ 174 ‐


c Contour & Graded bounds 26.67 4.00 100 15.00 33.33 5.00 160.00 24.00<br />

d Bench terracing 20 3.00 60 9.00 33.33 5.00 113.33 17.00<br />

e Others which includes following­ 90.67 13.60 130 19.50 92.67 13.90 313.33 47.00<br />

II<br />

i).Land development<br />

ii).Field bunds etc.<br />

164 24.6 410 61.5 246 36.9 820 123<br />

Water Harvesting Structure<br />

(Nos) 35.93 89.81 53.89 179.63 `<br />

a Farm ponds 2 7.00 8 17.00 2 5.00 12 29.00<br />

b Nallah bandh 4 8.00 6.00 4 14.00<br />

c Check Dam 2 7.00 3 7.80 7.00 5 21.80<br />

d Percolation Tank/Storage Tank 1 4.00 5 12.00 4.00 6 20.00<br />

e Others­ 0 0.00<br />

i).Minor irrigation channel 2 7.00 8 16.00 2 4.00 12 27.00<br />

ii).Gabion structure 3 5.00 4 9.00 7 14.00<br />

iii).Land protection (RRM) for<br />

channel 3 7.00 5 13.00 3 8.00 11 28.00<br />

‐ 175 ‐


iv).Ground water Recharge 1 3.93 4 8.00 2 4.00 7 15.93<br />

v).Earthen/Brushwood/Loose<br />

Boulder Checks 2 3.01 3 6.89 5 9.90<br />

11 35.93 42 89.81 16 53.89 69 179.63<br />

III Afforestation ( Ha) 185.33 27.80 463.33 69.50 278 41.70 926.67 139.00<br />

a Private Agriculture Land<br />

b Community Land<br />

c Forest Land<br />

Others including­<br />

i).Regeneration of vegetative<br />

cover<br />

ii).Rubber,Aromatic, Medicial tree<br />

plantation.<br />

iii).Bio­fuel plantation<br />

185.33 27.8 463.33 69.5 278 41.7 926.6667 139<br />

IV Pasture Development (ha) 33.20 83.00 49.80 166.00<br />

a Private Agriculture Land 70.67 10.60 300 45.00 160 24.00 530.6667 79.60<br />

‐ 176 ‐


Community Land 70.67 10.60 153.33 23.00 86.67 13.00 310.6667 46.60<br />

c<br />

Others which includes<br />

following also­ 80 12.00 100 15.00 85.33 12.80 265.3333 39.80<br />

i).Sericulture<br />

ii).Bee keeping ( apiculture)<br />

iii). Cattle Rearing & Livestock<br />

iv).Micro­enterprise.<br />

v).Backyard Poultry<br />

Sub­Total 221.33 33.20 553.33 83.00 332 49.80 1106.67 166.00<br />

V Horticulture Development (Ha) 27.80 69.50 41.70 139.00<br />

a Private Agriculture Land 86.67 13.00 233.33 35.00 120 18.00 440 66.00<br />

b Community Land 45.33 6.80 140 21.00 80 12.00 265.33 39.80<br />

c Others including­ 53.33 8.00 90 13.50 78 11.70 221.33 33.20<br />

i).Nursery Raising for Podder &<br />

crops.<br />

ii).Floriculture<br />

185.33 27.80 463.33 69.50 278 41.70 926.67 139.00<br />

‐ 177 ‐


B).Livelihood Activities for<br />

Assettless/downtrodden/marginal farmers(10%) (in<br />

nos) which includes­<br />

ii).IT training & related jobs,Mobile<br />

repairs<br />

iii).Handicraft­wood/bamboo carvings<br />

& Cane Works<br />

iv).Bamboo veneers for Plywood<br />

v).Cycle Repairs<br />

vi).Plumbing<br />

v).Procurement,processing,marketing<br />

of foodgrains.<br />

vi).Value addition to Agri products.<br />

7 29.87 18 74.66 11 44.80 36 149.33<br />

7 29.87 18 74.66 44.80 36 149.33<br />

C). Production<br />

System & Micro­<br />

enterprise(13%)<br />

(in nos) which<br />

will include­ 7 38.82 17 97.06 9 58.24 33 194.12<br />

‐ 178 ‐


4<br />

i).Dairy Milk production & collective<br />

marketing.<br />

ii).Pisciculture<br />

iii),Weaving<br />

iv).Piggery<br />

v).Crop demonstration,seed<br />

muliplication & banks.<br />

vi).Vermi­Compost<br />

vii).Promotion & Propagation of non­<br />

conventional energy saving devices,.<br />

‐ 179 ‐<br />

38.82 17 97.06 9 58.24 33 194.12<br />

Consolidation<br />

Phase(5%)<br />

which includes­ 10 74.66 10 74.66<br />

i).Completion of various works.<br />

ii).Capacity building for new agenda<br />

items for post project period.<br />

iii).Sustainable management of<br />

developed resources.


5<br />

iv).Up­scaling successes on farm<br />

production/ off­farm livelihoods.<br />

v).Preparation of project completion<br />

report<br />

vi).Documentation of successful<br />

experience/lessons learnt etc.<br />

Sub Total 0 10 74.66 10 74.66<br />

G/Total 808 343.4475 1982 671.95875 1178 477.84 3986 1493.248<br />

Area to be<br />

treated*<br />

TOTAL<br />

i).Forest Land<br />

II).Community Land 1991 298.65 4977.5 746.63 2986.5 447.98 9955 1493.25<br />

iii).Others<br />

Total area to be treated 1991 298.65 4977.5 746.625 2986.5 447.98 9955 1493.25<br />

People's Contribution to WDF account to be<br />

deducted as per para­73 of guideline & @ ­<br />

i).5 % of the cost of NRM works<br />

executed on private lands for<br />

‐ 180 ‐


N.B:<br />

SC/ST.<br />

ii).20 % for other cost intensive<br />

farming system for SC/ST.<br />

* : Treatment map enclosed. The<br />

geographical locations of project<br />

areas as identified indicated with<br />

Latitude­longitude.<br />

: Incase of plantation Activies No.<br />

of Plants per Ha may be indicated in<br />

remark col.<br />

1).These activities shall be carried out in respective project area duly indicated as per MWS­12 nos polygon & at<br />

locations of respective farmers . There will be no deviation & allocations should be utilized judiciously for<br />

implementation as per indication till completion of the project<br />

‐ 181 ‐


Chapter 10<br />

Capacity building<br />

a) Stake holders and capacity building requirements<br />

Sl. Project<br />

Critical capacity gaps<br />

No. Stakeholder<br />

1 Target community Sensitization on concept and importance of<br />

2 GPs<br />

watershed approach as a development unit.<br />

Training on watershed development. Delineation of<br />

watershed areas and PRA exercise, monitoring,<br />

evaluation and social audit.<br />

3 Watershed Planning on yearly calendar of activities, assessment<br />

Committees of needs in the watershed areas, monitoring of day<br />

to day in watershed projects and book keeping.<br />

4 SHGs Records maintenance, bank linkage, up gradation of<br />

skill for enhancing productivity.<br />

5 UGs Importance of soil & water conservation,<br />

afforestation, horticultural crops, records<br />

maintenance on common property resources.<br />

6 WDTs GIS mapping, Remote sensing, community<br />

organization, planning and implementation of<br />

watershed programme.<br />

7 PIAs Planning and implementation of watershed<br />

programme, monitoring, MIS, online reporting to<br />

SLNA and CLNA.<br />

8 DRDA/ZP cell<br />

9 SLNA Policy and sanctioning of projects.<br />

‐ 182 ‐


) Strategies for capacity building:<br />

Based on SLNA’s Action Plan and policy for watershed development in the state, the strategy taken up for capacity building is to identify national and<br />

state institutions where PIAs and all functionaries of the watershed project will be sensitized and trained. A calendar of training module shall be framed<br />

and conducted by involving the following institutions.<br />

i).NIRD,Guwahati, ii). NESAC, Megalaya iii). SIRD, Itanagar, iv). ICAR, Basar , v).SRSAC, Ita,vi).NERIST, Nirjuli,vii).KVK itanagar,viii).District Industrial<br />

& Training Centre, Tezu ,ix).KVIC, Itanagar.<br />

c) Capacity building programme to be taken up<br />

a. PRA exercise­ Watershed development is a bottom up planning process. Before watershed project is started the farmers/Village communities<br />

have to be involved in watershed plan process. Orientation training and capacity building for PRA exercise shall be imparted to PIA, WDT<br />

members, WC and Users Group.<br />

b. Training on survey and watershed mapping: WDT members and PIA have to be equipped with survey and watershed mapping with the<br />

scientific equipments such as GIS and other survey materials. Hence capacity building training for them will be conducted before the<br />

watershed projects starts.<br />

c. Training for SHG: Concept and activities of SHG has to be imparted to each member. Micro financing and loan system and introducing them<br />

to financial institution will be done through the capacity building process.<br />

d) Training manuals for training programme and field training :<br />

W<strong>CD</strong>C under DRDA shall bring out training manuals for every items of watershed development. All the<br />

functionaries of watershed project will go through the field training which will be planned and worked out as soon<br />

as per SLNA directive based on approved State Perspective & Strategic Plan..<br />

‐ 183 ‐


List of Training Institutes identified for Capacity Building at District level :<br />

The State level technical experts headed by Head, professional experts being in constant touch with the DOLR, GOI acqiuants all<br />

aspects of IWMP & shall be invited to give short­term trainings for the project stakeholders­W<strong>CD</strong>C(under DRDA),PIA,WC,SHG, UG & PRI.<br />

W<strong>CD</strong>C(DRDA) & PIA/ WC may go in for outsourcing training needs to reputed NGO on specific approval of SLNA. Moreover, following<br />

institutes are identified for the same­<br />

1 2 3 4 5 6 7<br />

S.<br />

No<br />

.<br />

Name of<br />

the<br />

Training<br />

Institute<br />

1 NIRD,<br />

Guwahati<br />

2 NESAC,<br />

Shillong<br />

3 SIRD,<br />

Itanagar<br />

Full Address with contact<br />

no., website & e­mail<br />

NIRD, Guwahati, Khanapura<br />

Ph:No.<br />

www.nird.org.in<br />

NESAC, Department of Space,<br />

GOI, Umiam­793103<br />

(Meghalaya) Telephone: +91<br />

364 2570140/141 Fax: +91<br />

364 2570139<br />

Email:<br />

pinnamanemi1953@yahoo.com<br />

rao.npp@nesac.gov.in<br />

Website: http://nesac.gov.in<br />

State Institute of Rural<br />

Development<br />

Name &<br />

Designation<br />

of the Head<br />

of Institute<br />

N. Mallo,<br />

Director<br />

Dr PP<br />

Nageswar<br />

Rao, Director<br />

Shri. Tope<br />

Bam<br />

‐ 184 ‐<br />

Type of<br />

Institute<br />

National<br />

Training<br />

Centre<br />

National<br />

Training<br />

Centre<br />

State<br />

Training<br />

Area(s) of<br />

specialization<br />

Watershed & Rural<br />

Development<br />

Accreditation<br />

details<br />

National level<br />

Remote Sensing and GIS National level<br />

Rural Development /<br />

Watershed programmme<br />

State level


4 NERIST,<br />

Nirjuli<br />

Itanagar, Arunachal Pradesh<br />

­ 791111.<br />

Ph.No. 0360­2216911 (O &<br />

fax)<br />

Director, NERIST, Nirjuli,<br />

Papum Pare District, Arunachal<br />

Pradesh<br />

5. ICAR,<br />

Ph:0360/2257401.Fax:0360/22<br />

58533<br />

Joint Director, Basar, West<br />

Basar Siang, Arunachal Pradesh,<br />

Ph: 919435252487<br />

Fax:03795/­­<br />

Information, Education & Communication (IEC) Activities<br />

Director Centre<br />

Dr. Joram<br />

Begi, Director<br />

R.<br />

Bhagawati,<br />

Jt. Director<br />

‐ 185 ‐<br />

Regional<br />

Engineerin<br />

g Collage<br />

Agri.<br />

Reasearch<br />

Institute<br />

Tech.College with<br />

knowhow in RD<br />

Programmes<br />

Watershed including<br />

specilization in Agri /<br />

Forest etc.<br />

Reasearch institute in<br />

Agriculture<br />

National level<br />

State Level<br />

All the necessary information like temperature, rainfall, soil type will be communicated from micro­watershed level to W<strong>CD</strong>C/PIA to SLNA and from<br />

SLNA to DOLR/ NRAA, GOI through website. SLNA shall have a separate office of its own and it shall have a fund provision for information, education and<br />

communication. All the IT equipments provided to SLNA shall be made use by PIA/W<strong>CD</strong>C with the help of DOLR/ NRAA, GOI. Hard copies of any reports<br />

and information shall be supplied to the concerned authority through speed post.


Details of IEC activities :<br />

1 2 3 4 5 6<br />

Sl.<br />

No.<br />

District Activity<br />

1. Infrastructure<br />

development<br />

Executing<br />

agency<br />

W<strong>CD</strong>C<br />

(DRDA) in<br />

consultation<br />

with PIA<br />

&WDT/<br />

WC.<br />

2. Training W<strong>CD</strong>C<br />

(DRDA) in<br />

consultation<br />

with PIA<br />

&WDT/<br />

WC.<br />

3. Exposure trip W<strong>CD</strong>C<br />

(DRDA) in<br />

consultation<br />

with PIA<br />

&WDT/<br />

WC.<br />

4.<br />

Lohit<br />

‐ 186 ‐<br />

Estimated<br />

expenditure<br />

for XI Plan<br />

period<br />

(Rs. in lakh)<br />

Expected Outcome (may<br />

quantify, wherever<br />

possible)<br />

5.20 i. 3 sets of computers with<br />

printers.<br />

ii. 01 sets of Xerox machines.<br />

iii. 01 sets of Fax machines.<br />

1.75 Skill enhancement of field<br />

staff with the latest IT, GIS,<br />

Remote sensing and<br />

community organization.<br />

2.2 Trip to renowned institutes,<br />

centres and project areas for<br />

firsthand experience.<br />

Documentation W<strong>CD</strong>C 2.5 Documentation of best


Chapter 11<br />

Monitoring and Evaluation (M & E)<br />

&<br />

Translation<br />

(DRDA) in<br />

consultation<br />

with PIA<br />

&WDT/<br />

WC.<br />

‐ 187 ‐<br />

indigenous practices and<br />

success stories. Translation of<br />

scientific methods and<br />

practices of watershed<br />

programme into local<br />

dialects.<br />

a) Performance monitoring of projects: National level monitors will be appointed by the ministry of Rural Development whereas State Level monitors<br />

will be appointed by SLNA. W<strong>CD</strong>C, DRDA & PIA/WC will take all initiative for the same.<br />

b) Institutional performance monitoring: Monitoring on Institutional performance will be carried out from time to time with the monitors appointed by<br />

SLNA.<br />

c) Internal learning: Through monitoring and evaluation the activities of SLNA, W<strong>CD</strong>C and PIAs will be monitored and corrective measures will be taken<br />

up.<br />

d) Evaluation: SLNA will prepare a panel of evaluators with the approval of DOL, GOI. They will evaluate the performance in the watershed project in<br />

different stages.


List of Institutes identified for M & E at District level :<br />

1 2 3 4 5 6 7<br />

S.<br />

No<br />

.<br />

Name of<br />

the<br />

Training<br />

Institute<br />

1 NIRD,<br />

Guwahati<br />

Full Address with<br />

contact no., website &<br />

e­mail<br />

NIRD, Guwahati, Khanapura<br />

Ph:No. 09435019953<br />

www.nird.org.in<br />

2. ICAR, Basar Joint Director, Basar, West<br />

Siang, Arunachal Pradesh,<br />

Ph:09436252487<br />

3. SIRD,<br />

Itanagar<br />

4. NERIST,<br />

Nirjuli<br />

03795­222237(F)<br />

State Institute of Rural<br />

Development<br />

Itanagar, Arunachal<br />

Pradesh<br />

­ 791111.<br />

Ph:09436041338<br />

0360/2216911(O &F)<br />

Director, NERIST, Nirjuli,<br />

Papum Pare District,<br />

Arunachal Pradesh<br />

Ph:0360/2257401<br />

Fax:0360/2258533<br />

Name &<br />

Designation of<br />

the Head of<br />

Institute<br />

I.Mallo<br />

, Director<br />

R. Bhagawati,<br />

Jt. Director<br />

Shri. Tope Bam<br />

Director I/C<br />

Dr. Joram Begi,<br />

Director<br />

‐ 188 ‐<br />

Type of<br />

Institute<br />

Central<br />

Govt.<br />

Agri.<br />

Reasearch<br />

Institute<br />

State<br />

Training<br />

Centre<br />

Regional<br />

Engineerin<br />

g Collage<br />

Area(s) of<br />

specialization<br />

Agriculture &<br />

Rural<br />

Development<br />

Reasearch<br />

institute in<br />

Agriculture<br />

Rural<br />

Development /<br />

Watershed<br />

programmme<br />

Technical<br />

Collage with<br />

knowhow in Rd<br />

Programmes /<br />

Watershed<br />

including<br />

specilization in<br />

Agri / Forest<br />

Accreditation<br />

details<br />

National level<br />

State Level<br />

State level<br />

National level


Chapter 12<br />

Expected outcomes<br />

IWMP­I­Wakro is a poverty alleviation programme. With the implementation of this project the various outcomes expected are:<br />

1. Increase in productivity of the land<br />

2. Create employment opportunities<br />

3. Raise rural incomes and living standard<br />

4. Reduction in migration from rural areas<br />

5. Increase in water table in the area. This can be accomplished by water harvesting structure ,checkdam, afforestation & other watershed intervention by<br />

recharging the ground water. As of now the water table of the project area is around 4 to 4.5 m at Karko of Tasar.<br />

6. Restore ecological balance and overall environmental improvement.<br />

7. Change in system of cultivation from shifting to permanent cultivation.<br />

Expected/Estimated Outcomes :<br />

1 2 3 4 5 6 7<br />

S.<br />

No.<br />

Name<br />

of the<br />

District<br />

1 Lohit<br />

Item<br />

Status of water<br />

table<br />

Ground water<br />

structures<br />

repaired/<br />

rejuvenated<br />

Unit of<br />

measurement<br />

‐ 189 ‐<br />

Pre­project<br />

Status<br />

etc.<br />

Expected Post­<br />

project Status<br />

meters 3.5­5.5mtrs. 3­4 mtrs.<br />

No. of unit Ground water<br />

recharging &<br />

rejuvenation not<br />

initiated.<br />

Remarks<br />

Rivers and<br />

streams will<br />

be recharged<br />

through<br />

water


Quality of<br />

drinking water<br />

Availability of<br />

drinking water<br />

mg/L Unhygienic and<br />

contaminated(with<br />

Hilikamiya source,<br />

PH­7,Total<br />

hardness caco3­<br />

20mg/l, Alkalinity­<br />

109.8, Turbidity­0<br />

NTU, Iron­.3 mg/l,<br />

chloride­10<br />

mg/l,sulphate­96<br />

mg/l,Nitrate­30<br />

mg/l & residual<br />

‐ 190 ‐<br />

chlorine­0.2 mg/l.<br />

months Water available<br />

for 9­10 months.<br />

Hygienic and pure<br />

All 12 months at<br />

project area with<br />

treates<br />

w/s,rainwater<br />

harvesting<br />

structures, Agri<br />

film/Polythene, Ring<br />

well, pumping set,<br />

etc.<br />

Increase in Hectares 326 ha More irrigation<br />

conservation<br />

measures like<br />

water<br />

harvesting<br />

structures,<br />

afforestation.


irrigation<br />

potential<br />

Change in<br />

cropping/ land<br />

use pattern<br />

Area under<br />

agricultural crop<br />

i Area under<br />

single crop<br />

ii Area under<br />

double crop<br />

iii Area under<br />

multiple crop<br />

Net increase in<br />

crop production<br />

area<br />

Increase in area<br />

under<br />

vegetation<br />

Increase in area<br />

under<br />

horticulture<br />

Increase in area<br />

under fuel &<br />

fodder<br />

Type Traditional &<br />

Subsistence (rice,<br />

Maize & millet)<br />

‐ 191 ‐<br />

potential to be<br />

created­342.3<br />

High yielding<br />

varieties of<br />

rice,maize,millet &<br />

adoption of multiple<br />

cropping with cash<br />

crops,chillies,ginger..<br />

Hectares 52,980 58,278<br />

Hectares 6759 7434.9<br />

Hectares<br />

Hectares 29,967 32,963.70<br />

Hectares 4,70,044.5 5,17,048.95<br />

Hectares 17 19<br />

Hectares 44 57.2


Production:<br />

Milk<br />

Fish<br />

Meat<br />

Ltr/year<br />

Tones/yr<br />

Tones/yr<br />

No. of SHGs No.<br />

Increase in no.<br />

of livelihoods<br />

‐ 192 ‐<br />

150<br />

60<br />

­<br />

165<br />

1071.892<br />

­<br />

No. 12 17 (Permanent<br />

cultivation, Mithun<br />

rearing, horticulture,<br />

fishery, apiculture,<br />

weaving,<br />

handicrafts, etc.<br />

Rs./month/Household Rs. 2737/­ Rs. 3345/­<br />

Aerage income<br />

increase<br />

Migration Person/yr 10 ( block) 7<br />

SHG Federations<br />

No. ­ 11 One SHGs<br />

formed<br />

Federation in<br />

each district.<br />

Credit linkage<br />

No. ­ 15 SBI, Rural<br />

with banks<br />

Bank of<br />

Arunachal,<br />

Arunachal<br />

state<br />

Cooperative<br />

Bank, UTI,<br />

etc.<br />

Resource use<br />

­ ­ ­ Agreement<br />

agreements<br />

with user<br />

groups for<br />

management


WDF collection<br />

& management<br />

Summary of<br />

lessons learnt<br />

‐ 193 ‐<br />

and<br />

maintenance<br />

of the<br />

resources<br />

created.<br />

Rupees ­ ­ Watershed<br />

Committee<br />

will monitor<br />

and manage<br />

the fund.<br />

● Bottom­up approach in planning process is found to be effective.<br />

● Watershed as a development unit is found to be more focussed as it has a<br />

common outlet to easily assess or compute the sediment and water lossage.<br />

● Promotion of women SHGs and their representation in the water shed<br />

committee has given the women a platform in the decision making and also<br />

enhancing their income through livelihood activities.<br />

● Change in the mindset of people from the practice of jhum cultivation to<br />

permanent cultivation.<br />

● Conservation measures of soil, moisture and water helped in reducing the<br />

problem of soil erosion and recharge of ground water table.<br />

● Reversal in migration from rural to urban.<br />

● Watershed programme resulted in increase of green cover, soil moisture and<br />

thereby improving the eco­system.<br />

************