27.02.2013 Views

Supplier Tooling Manual - Vought Aircraft Division

Supplier Tooling Manual - Vought Aircraft Division

Supplier Tooling Manual - Vought Aircraft Division

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

a. An annual PTI consisting of a visual inspection of the tool for damage, wear<br />

or missing details (some tools may require level and plumb). The supplier<br />

shall have a tracking system documenting the frequency, last PTI and next<br />

due date.<br />

The supplier shall either place a placard, decal or other documentation on the<br />

tool depicting PTI expiration date and QA acceptance as evidence.<br />

b. Perform PTI by visually inspecting the tool prior to each usage in production.<br />

The supplier shall have an operation in the production planning stating "visual<br />

inspect tool for wear, damage or missing details." This production planning<br />

paper shall serve as the evidence of performing the PTI.<br />

7.4 REJECTION OF TOOLING<br />

<strong>Tooling</strong> that fails to meet the acceptance criteria (i.e., purchasing documents, tool design<br />

drawings, engineering drawings, first article acceptance or the applicable tool<br />

specifications) shall be rejected by the supplier and or <strong>Vought</strong>. Disposition for the tool<br />

may require tool maintenance or rework as defined in Section 4 of this manual.<br />

<strong>Tooling</strong> that is rejected for maintenance issues, shall be repaired by the supplier as<br />

defined by the purchasing documents Terms and Conditions.<br />

<strong>Tooling</strong> rejected for issues that affect form, fit, or function of the part requires notification<br />

to <strong>Vought</strong> using SIR form. Limited use of rejected tools is at the discretion of <strong>Vought</strong> and<br />

shall be authorized in writing. Upon satisfactory completion of the disposition, SQE, or<br />

their designee shall remove tool rejection tags.<br />

When a tool rejection is found that could affect fit, form or function of the production<br />

hardware, the supplier shall ensure that the previously produced hardware conforms to<br />

engineering requirements. If the hardware is non-conforming, the supplier shall<br />

immediately notify <strong>Vought</strong> as specified in the SQAR document.<br />

SECTION 8 - TOOL CONTROL AND ACCOUNTABILITY<br />

8.1 TOOL ACCOUNTABILITY<br />

The supplier shall be responsible for maintaining accountability of tooling in its<br />

possession in accordance with the purchase order terms and conditions note(s) as noted<br />

in Section 12, Table 1. This consists of sighting, tagging or marking, describing,<br />

recording, reporting the ST/STE, and reconciling records of all property including items in<br />

storage.<br />

<strong>Supplier</strong>s shall flow responsibilities for tool inventory to sub-tier suppliers. Inventory<br />

requirements are defined in the terms and conditions note(s) and may differ between<br />

contracts.<br />

<strong>Supplier</strong> <strong>Tooling</strong> <strong>Manual</strong><br />

23 October 7, 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!