25.02.2013 Views

download/files/LCQ Deca_Duo Hardware Troubleshooting_8601.pdf

download/files/LCQ Deca_Duo Hardware Troubleshooting_8601.pdf

download/files/LCQ Deca_Duo Hardware Troubleshooting_8601.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>LCQ</strong> Recommended Maintenance Schedule<br />

Daily:<br />

Evening Recommendations:<br />

◗ Put the system in the stand-by mode.<br />

◗ Turn off the Ion Gauge and rinse the Heated Capillary with methanol<br />

or an appropriate solvent. When finished, turn Ion Gauge back on.<br />

◗ Cap off the heated capillary with the septum cap.<br />

◗ Secure the API probe to the API stack.<br />

◗ Make sure the solvent waste bottle is empty.<br />

◗ Open the mechanical pump ballast for roughly 0.5 hour.<br />

◗ While the pump is ballasting, maintain (move, delete, and/or copy)<br />

<strong>files</strong> at the <strong>LCQ</strong> computer.<br />

◗ If bottled nitrogen gas is being used, check the nitrogen gas.<br />

◗ After 0.5 hour, close the ballast valve.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!