download/files/LCQ Deca_Duo Hardware Troubleshooting_8601.pdf
download/files/LCQ Deca_Duo Hardware Troubleshooting_8601.pdf
download/files/LCQ Deca_Duo Hardware Troubleshooting_8601.pdf
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>LCQ</strong> Recommended Maintenance Schedule<br />
Daily:<br />
Evening Recommendations:<br />
◗ Put the system in the stand-by mode.<br />
◗ Turn off the Ion Gauge and rinse the Heated Capillary with methanol<br />
or an appropriate solvent. When finished, turn Ion Gauge back on.<br />
◗ Cap off the heated capillary with the septum cap.<br />
◗ Secure the API probe to the API stack.<br />
◗ Make sure the solvent waste bottle is empty.<br />
◗ Open the mechanical pump ballast for roughly 0.5 hour.<br />
◗ While the pump is ballasting, maintain (move, delete, and/or copy)<br />
<strong>files</strong> at the <strong>LCQ</strong> computer.<br />
◗ If bottled nitrogen gas is being used, check the nitrogen gas.<br />
◗ After 0.5 hour, close the ballast valve.