Proceedings - Teaching and Learning Centre - Simon Fraser ...
Proceedings - Teaching and Learning Centre - Simon Fraser ... Proceedings - Teaching and Learning Centre - Simon Fraser ...
Fraser River Action Plan 3rd Research Workshop Figure 2: Location mill A and B near-field zones for collecting fish during the field surveys on the upper Fraser River, Prince George, B.C. Page 24
Fraser River Action Plan 3rd Research Workshop Response Parameters • whole organism measurements: — size-at-age — mean age — condition — liver weight — gonad weight — fecundity — egg size • physiological measurements — hepatic MFO induction (EROD) — circulating and in vitro sex steroid levels Pilot Survey • possible sentinel species included: longnose dace leopard dace peamouth chub redside shiner prickly sculpin slimy sculpin • final selection based on abundance and capture efficiency • sampling gear included: electrofisher, beach seine, minnow traps and gillnets Page 25
- Page 2 and 3: PROCEEDINGS 3rd RESEARCH WORKSHOP F
- Page 4 and 5: TABLE OF CONTENTS Participants ....
- Page 6 and 7: Development of a Citizen’s Monito
- Page 8 and 9: Fraser River Action Plan 3rd Resear
- Page 10 and 11: Fraser River Action Plan 3rd Resear
- Page 12 and 13: Fraser River Action Plan 3rd Resear
- Page 14 and 15: Fraser River Action Plan 3rd Resear
- Page 16 and 17: Fraser River Action Plan 3rd Resear
- Page 18 and 19: Fraser River Action Plan 3rd Resear
- Page 20 and 21: Fraser River Action Plan 3rd Resear
- Page 22 and 23: Fraser River Action Plan 3rd Resear
- Page 24 and 25: Fraser River Action Plan 3rd Resear
- Page 26 and 27: SESSION 1 PULP MILL EFFLUENT ISSUES
- Page 28 and 29: Fraser River Action Plan 3rd Resear
- Page 30 and 31: Page 4 - t 91 8 .--- i I -_-___ Fra
- Page 32 and 33: Fraser River Action Plan 3rd Resear
- Page 34 and 35: Fraser River Action Plan 3rd Resear
- Page 36 and 37: Fraser River Action Plan 3rd Resear
- Page 45 and 46: Fraser River Action Plan 3rd Resear
- Page 47: Fraser River Action Plan 3rd Resear
- Page 57 and 58: Fraser River Action Plan 3rd Resear
- Page 60 and 61: Fraser River Action Plan 3rd Resear
- Page 63 and 64: Fraser River Action Plan 3rd Resear
- Page 65: Fraser River Action Plan 3rd Resear
- Page 68: Fraser River Action Plan 3rd Resear
- Page 72: Fraser River Action Plan 3rd Resear
- Page 78 and 79: Fraser River Action Plan 3rd Resear
- Page 81 and 82: Fraser River Action Plan 3rd Resear
- Page 83: Fraser River Action Plan 3rd Resear
- Page 87 and 88: Fraser River Action Plan 3rd Resear
- Page 89 and 90: Fraser River Action Plan 3rd Resear
- Page 91 and 92: Fraser River Action Plan 3rd Resear
- Page 93 and 94: Fraser River Action Plan 3rd Resear
- Page 95 and 96: Fraser River Action Plan 3rd Resear
- Page 97 and 98: Fraser River Action Plan 3rd Resear
<strong>Fraser</strong> River Action Plan 3rd Research Workshop<br />
Response Parameters<br />
• whole organism measurements:<br />
— size-at-age<br />
— mean age<br />
— condition<br />
— liver weight<br />
— gonad weight<br />
— fecundity<br />
— egg size<br />
• physiological measurements<br />
— hepatic MFO induction (EROD)<br />
— circulating <strong>and</strong> in vitro sex steroid levels<br />
Pilot Survey<br />
• possible sentinel species included:<br />
longnose dace<br />
leopard dace<br />
peamouth chub<br />
redside shiner<br />
prickly sculpin<br />
slimy sculpin<br />
• final selection based on abundance <strong>and</strong> capture<br />
efficiency<br />
• sampling gear included: electrofisher, beach seine,<br />
minnow traps <strong>and</strong> gillnets<br />
Page 25