BOCA FIRE RESCUE NET - City of Boca Raton
BOCA FIRE RESCUE NET - City of Boca Raton
BOCA FIRE RESCUE NET - City of Boca Raton
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Page 3<br />
<strong>BOCA</strong> <strong>FIRE</strong> <strong>RESCUE</strong><br />
Medic Bike Unit<br />
Left to Right: Assistant Chief Raul Travieso, Firefighter/Paramedic David Weyer,<br />
Fire Inspector/Paramedic Scott Stinecipher, and Firefighter/Paramedic Val Polestina<br />
Operations<br />
By: Daryl Scott<br />
Assistant Chief<br />
The Battalion/Division Chief and<br />
Driver Engineer promotional exams<br />
have been completed. We would like<br />
to thank and congratulate all personnel<br />
that recently participated in the promotional<br />
process. The Department appreciates<br />
the time and commitment that is<br />
necessary when competing in any promotional<br />
process. The next exam will<br />
be posted sometime in January for the<br />
position <strong>of</strong> Lieutenant with the examination<br />
to be held in the Spring <strong>of</strong> 2012.<br />
Those <strong>of</strong> you eligible for this exam<br />
need to ensure that you meet all the<br />
requirements for the position.<br />
As the New Year approaches, there are<br />
several additional projects that the Op-<br />
erations Division has, and will be, working<br />
on. The first will be the balancing <strong>of</strong><br />
each shift’s personnel with all the different<br />
step-up classifications. All the<br />
moves will be completed by mid-<br />
January 2012. Next, vacation picks will<br />
be conducted and completed by mid-<br />
December. Following the personnel<br />
moves and vacation picks, the station<br />
bidding process will be conducted sometime<br />
in January.<br />
The Operations Division would like to<br />
wish everyone a happy and joyous Holiday<br />
Season along with a healthy and<br />
prosperous New Year!<br />
Until next time be safe.<br />
Recycle Your Holiday Lights<br />
Send them to:<br />
HolidayLEDs.com Recycling Program<br />
C/O Classic Turning, Inc.<br />
4905 James McDivitt Street<br />
Jackson, MI 49201-8958<br />
Logistics &<br />
Support<br />
By:<br />
Michael A. Gergora<br />
Assistant Fire Chief<br />
The new fiscal year brings a number <strong>of</strong><br />
exciting events for our Department.<br />
New fire apparatus, medic units, newly<br />
hired firefighters, winter jackets, safety<br />
vests, and side cutters just to name a<br />
few. Please join me in welcoming our<br />
10 new firefighters.<br />
Ladder Trucks/Medic Units<br />
We are scheduled to receive our new<br />
Sutphen SPH 100’ ladder truck on November<br />
2, 2011. This will be replacing<br />
our current 1996 100’ Platform that has<br />
served us well over the past 15 years<br />
and 160,000 plus miles. The new Platform<br />
is a state-<strong>of</strong>-the-art firefighting<br />
machine. Here are some <strong>of</strong> the highlights<br />
<strong>of</strong> this apparatus. It is more compact<br />
than our current truck resulting in<br />
more maneuverability. The hydraulic<br />
ladder is a 5 section configuration as<br />
compared to our 3 section ladder. The<br />
ladder has full length illumination with<br />
LED lighting to aid in visibility while<br />
climbing and any low flying aircraft.<br />
The “bucket” has multiple entry points<br />
and a driver’s side access toward the<br />
rear <strong>of</strong> the truck. Please see the pictures<br />
below <strong>of</strong> the new flagship <strong>of</strong> our<br />
fleet.<br />
A Sutphen representative will be here<br />
on November 17 th & 18 th to provide a<br />
train-the-trainer session for our personnel.<br />
The entire Department will then<br />
receive training once the Ladder Truck<br />
is fully outfitted and prior to being<br />
placed in service. This should occur<br />
during the week <strong>of</strong> November 29 th<br />
through December 2 nd . After the training<br />
has been completed, it will be<br />
headed to Fire Station 1 and ready for<br />
its first call.<br />
Our new Horton Medic Units will also<br />
begin to arrive on November 2 nd . They