ANNEXURE III<br />

THE CHECK LIST MUST BE COMPLETED AND RETURNED WITH YOUR OFFER. PLEASE ENSURE THAT ALL THESE POINTS<br />

ARE COVERED IN YOUR OFFER. THESE WILL ENSURE THAT YOUR OFFER IS PROPERLY EVALUATED. PLEASE TICK<br />

MARK 'YES' OR 'NO' TO THE FOLLOWING QUESTIONS, IN THE RIGHT HAND COLUMN.<br />

( A) TECHNICAL CHECK LIST<br />

Sl# REQUIREMENT COMPLIANCE<br />

1. All Gas Detectors should have valid DGMS approval certificates . YES/NO<br />

2. SMART Detector, 4-20 mA Output, 24 V DC Supply. YES/NO<br />

3. Sensor Enclosure material: Suitable for use in Hazardous area and corrosion free. YES/NO<br />

4. Detectors suitable for Area Monitoring. YES/NO<br />

5. Detector Type: IR (Infrared). YES/NO<br />

6. Audio-Visual Alarm facility with alarm display/indication. YES/NO<br />

7. Control System/display designed for installation inside operator’s room room and wall<br />

mounted.<br />

YES/NO<br />

8. Display of Concentration/Alarm level(0-100 % LEL and PPM).<br />

9. Power supply unit. YES/NO<br />

10. Control System Engineering details, technical documents of detectors & other YES/NO<br />

instrumentation system provided.<br />

11. Control System Cabinet, Power supply unit and Hooter as per tender requirement. YES/NO<br />

12. On-Line UPS(Uninterrupted Power Supply) of one hour duration. YES/NO<br />

13. Calibration Kit with all accessories. YES/NO<br />

14. Length of cables must be quoted in unit rate. YES/NO<br />

15. Installation & Commissioning of the system. YES/NO<br />

16. Accessories quoted are as per OIL's approved vendors list. YES/NO<br />

17. Offer includes commissioning spares free of cost at the time of installation and<br />

commissioning as well as during test run of the system. (YES/NO)<br />

18. Installation & commissioning cost is inclusive of supply of all other materials like cable<br />

trays, casings etc. required for the system. (YES/NO)<br />

Offer reference<br />

Name of the Bidder<br />

YES/NO<br />

YES/NO<br />

<strong>Tender</strong> No. SDG7299P13/09 Page 23 of 25