5. CONCLUSION<<strong>br</strong> />

Balance reserves of the deposit South<<strong>br</strong> />

Mining District Majdanpek were determined<<strong>br</strong> />

on the basis of limit natural indicators<<strong>br</strong> />

related to the quality of mineral resources<<strong>br</strong> />

and mining technical conditions of<<strong>br</strong> />

exploitation, using the software Whittle<<strong>br</strong> />

and Gemcom.<<strong>br</strong> />

For selection the most suitable contour<<strong>br</strong> />

of balance reserves, the deposit optimi<strong>za</strong>tion<<strong>br</strong> />

was made in the software Whittle,<<strong>br</strong> />

based on developed block model of deposit,<<strong>br</strong> />

where several variants were obtained<<strong>br</strong> />

in a contour of limit copper content 0.15%,<<strong>br</strong> />

more precisely 86 variants of open pits.<<strong>br</strong> />

The mentioned software package sets<<strong>br</strong> />

the open pit limit per Lersh-Grossman<<strong>br</strong> />

algorithm, and the Cut-off procedure was<<strong>br</strong> />

applied. This method is used to calculate a<<strong>br</strong> />

potential profit for each mineralized block<<strong>br</strong> />

and costs in the event of its excavation.<<strong>br</strong> />

Fig. 2. View of the final open pit contour<<strong>br</strong> />

Calculation of balance reserves was<<strong>br</strong> />

mode in the software Gemcom, module<<strong>br</strong> />

Volumetrics.<<strong>br</strong> />

Limit open pit for the aforementioned<<strong>br</strong> />

initial techno-economic parameters is the<<strong>br</strong> />

open pit with a factor of income equal to<<strong>br</strong> />

one, or the open pit No.36. Since the open<<strong>br</strong> />

pits from No.34 to No.38 are positive,<<strong>br</strong> />

according to the “best“ variant of excavation,<<strong>br</strong> />

with the existing data taken into optimi<strong>za</strong>tion,<<strong>br</strong> />

the open pit No.33 was selected<<strong>br</strong> />

for construction the open pit that<<strong>br</strong> />

includes the balance reserves. The assumed<<strong>br</strong> />

profit, obtained in the software<<strong>br</strong> />

package Whittle for the variant of open pit<<strong>br</strong> />

No.33, would provide the additional investments,<<strong>br</strong> />

while the economic value of<<strong>br</strong> />

deposit remains positive.<<strong>br</strong> />

No 4, <strong>2011</strong>. 91<<strong>br</strong> />

MINING ENGINEERING