Rearranging the expression for the<<strong>br</strong> />
stope capacity in drawing, the following<<strong>br</strong> />
form is obtained:<<strong>br</strong> />
qvp = (8,5 x d – 8,5) x 0,91 x<<strong>br</strong> />
1,<<strong>br</strong> />
75<<strong>br</strong> />
x (0,62 + ﴿ (t/shift)<<strong>br</strong> />
d<<strong>br</strong> />
Calculation of parameter values was<<strong>br</strong> />
done by computer per mathematical<<strong>br</strong> />
model, and interdependences of tested<<strong>br</strong> />
values are shown in tables and diagrams.<<strong>br</strong> />
1. d = 3, ... , 10m<<strong>br</strong> />
2. qvn = Fn x g x n,<<strong>br</strong> />
Fn = 8,5 m 2<<strong>br</strong> />
3. qvp = (8,5 x d – 8,5) x 0,91 x<<strong>br</strong> />
1,<<strong>br</strong> />
75<<strong>br</strong> />
x (62 + )<<strong>br</strong> />
d<<strong>br</strong> />
4. qvob = (qvn + qvp) x 1,5<<strong>br</strong> />
5. Qvn = 3 x qvn x 264<<strong>br</strong> />
6. Qvp = 3 x qvp x 264<<strong>br</strong> />
7. Qvob = 3 x qvob x 264<<strong>br</strong> />
8. Nvn = 3168<<strong>br</strong> />
9. Nvp = 3168<<strong>br</strong> />
10. Nvob = (Nvn + Nvp) x 1,5 = 9504<<strong>br</strong> />
Q<<strong>br</strong> />
11. U = vn<<strong>br</strong> />
vn<<strong>br</strong> />
Nvn<<strong>br</strong> />
Q<<strong>br</strong> />
12. U =<<strong>br</strong> />
vp<<strong>br</strong> />
vn<<strong>br</strong> />
Nvp<<strong>br</strong> />
Q<<strong>br</strong> />
13. U =<<strong>br</strong> />
vob<<strong>br</strong> />
vob<<strong>br</strong> />
Nvob<<strong>br</strong> />
14. N1 = 3 x 264 x 1,5 = 1188<<strong>br</strong> />
15. N2 = 1188 x n2 s<<strong>br</strong> />
Table 1. Input data of program for calculation the parameters of pillar stope with DDB<<strong>br</strong> />
technology<<strong>br</strong> />
Seam Stope capacity Stope progress - drawing Wages Effect<<strong>br</strong> />
thickness<<strong>br</strong> />
d (m)<<strong>br</strong> />
Shift<<strong>br</strong> />
qvp(t/shift)<<strong>br</strong> />
Daily<<strong>br</strong> />
qvpd (t/v)<<strong>br</strong> />
Shift<<strong>br</strong> />
n2s(m/shift)<<strong>br</strong> />
DAily<<strong>br</strong> />
n2d(m/d)<<strong>br</strong> />
In a<<strong>br</strong> />
shift<<strong>br</strong> />
Daily<<strong>br</strong> />
Stope<<strong>br</strong> />
Up(t/wage)<<strong>br</strong> />
1 2 3 4 5 6 7 8<<strong>br</strong> />
3 18.62 55.86 1.20 3.60 4 12 4.65<<strong>br</strong> />
4 24.54 73.62 1.05 3.17 4 12 6.13<<strong>br</strong> />
5 30.01 90.03 0.97 2.91 4 12 7.50<<strong>br</strong> />
6 35.26 105.78 0.91 2.73 4 12 8.81<<strong>br</strong> />
7 40.38 121.14 0.87 2.61 4 12 10.09<<strong>br</strong> />
8 45.41 134.84 0.83 2.49 4 12 11.35<<strong>br</strong> />
9 50.40 151.20 0.81 2.43 4 12 12.60<<strong>br</strong> />
10 55.34 166.02 0.79 2.38 4 12 13.84<<strong>br</strong> />
No 4, <strong>2011</strong>. 77<<strong>br</strong> />