4. CONCLUSION<<strong>br</strong> />

Fig. 4. Disposition of facilities for relocation the Krivelj River in the zone of<<strong>br</strong> />

flotation tailing dump Veliki Krivelj large Krivelj<<strong>br</strong> />

Implementation the development plans<<strong>br</strong> />

of the Veliki Krivelj Mine, in the next<<strong>br</strong> />

forty year period, involves filling a number<<strong>br</strong> />

of pre-conditions, including the very<<strong>br</strong> />

important one as the construction of capital<<strong>br</strong> />

facilities for relocation the Krivelj<<strong>br</strong> />

River in the zone of flotation tailing dump<<strong>br</strong> />

Veliki Krivelj, as follows:<<strong>br</strong> />

- tunnel for deviation the Krivelj River<<strong>br</strong> />

in the zone of Field 2<<strong>br</strong> />

- tunnel for deviation the Krivelj River<<strong>br</strong> />

in the zone of Field 3<<strong>br</strong> />

10<<strong>br</strong> />

7<<strong>br</strong> />

BRANA 1<<strong>br</strong> />

LEGENDA - OBJEKTI:<<strong>br</strong> />

1 Postojeci kolektor Kriveljske reke<<strong>br</strong> />

2 Postojeci tunel Kriveljske reke<<strong>br</strong> />

3 Novi tunel Kriveljske reke u Polju 2<<strong>br</strong> />

4 Novi tunel Kriveljske reke u Polju 3<<strong>br</strong> />

5 Postojeci tunel <strong>Bor</strong>ske reke<<strong>br</strong> />

6 Novi tunel <strong>Bor</strong>ske reke<<strong>br</strong> />

7 Postojeci kolektor Saraka<<strong>br</strong> />

8 Novi tunel Saraka<<strong>br</strong> />

9 Cevovov Surdup-<strong>Bor</strong><<strong>br</strong> />

10 Kriveljska reka<<strong>br</strong> />

9<<strong>br</strong> />

No 4, <strong>2011</strong>. 63<<strong>br</strong> />

MINING ENGINEERING<<strong>br</strong> />

BRANA 2<<strong>br</strong> />

-<<strong>br</strong> />

1<<strong>br</strong> />

- connections (tunnel - collector) between<<strong>br</strong> />

the existing tunnel for the <strong>Bor</strong><<strong>br</strong> />

River and a new tunnel for the<<strong>br</strong> />

Krivelj River<<strong>br</strong> />

- collector for introduction the Saraka<<strong>br</strong> />

Stream into a new tunnel of the<<strong>br</strong> />

Krivelj River.<<strong>br</strong> />

Also, to avoid a possible formation of<<strong>br</strong> />

flooding wave upstream of Dam 4, as the<<strong>br</strong> />

consequence of a tunnel construction<<strong>br</strong> />

through Field 3 of the flotation tailing<<strong>br</strong> />

dump and threatening the open pit,