4. CONCLUSION<<strong>br</strong> />
Fig. 4. Disposition of facilities for relocation the Krivelj River in the zone of<<strong>br</strong> />
flotation tailing dump Veliki Krivelj large Krivelj<<strong>br</strong> />
Implementation the development plans<<strong>br</strong> />
of the Veliki Krivelj Mine, in the next<<strong>br</strong> />
forty year period, involves filling a number<<strong>br</strong> />
of pre-conditions, including the very<<strong>br</strong> />
important one as the construction of capital<<strong>br</strong> />
facilities for relocation the Krivelj<<strong>br</strong> />
River in the zone of flotation tailing dump<<strong>br</strong> />
Veliki Krivelj, as follows:<<strong>br</strong> />
- tunnel for deviation the Krivelj River<<strong>br</strong> />
in the zone of Field 2<<strong>br</strong> />
- tunnel for deviation the Krivelj River<<strong>br</strong> />
in the zone of Field 3<<strong>br</strong> />
10<<strong>br</strong> />
7<<strong>br</strong> />
BRANA 1<<strong>br</strong> />
LEGENDA - OBJEKTI:<<strong>br</strong> />
1 Postojeci kolektor Kriveljske reke<<strong>br</strong> />
2 Postojeci tunel Kriveljske reke<<strong>br</strong> />
3 Novi tunel Kriveljske reke u Polju 2<<strong>br</strong> />
4 Novi tunel Kriveljske reke u Polju 3<<strong>br</strong> />
5 Postojeci tunel <strong>Bor</strong>ske reke<<strong>br</strong> />
6 Novi tunel <strong>Bor</strong>ske reke<<strong>br</strong> />
7 Postojeci kolektor Saraka<<strong>br</strong> />
8 Novi tunel Saraka<<strong>br</strong> />
9 Cevovov Surdup-<strong>Bor</strong><<strong>br</strong> />
10 Kriveljska reka<<strong>br</strong> />
9<<strong>br</strong> />
No 4, <strong>2011</strong>. 63<<strong>br</strong> />
MINING ENGINEERING<<strong>br</strong> />
BRANA 2<<strong>br</strong> />
-<<strong>br</strong> />
1<<strong>br</strong> />
- connections (tunnel - collector) between<<strong>br</strong> />
the existing tunnel for the <strong>Bor</strong><<strong>br</strong> />
River and a new tunnel for the<<strong>br</strong> />
Krivelj River<<strong>br</strong> />
- collector for introduction the Saraka<<strong>br</strong> />
Stream into a new tunnel of the<<strong>br</strong> />
Krivelj River.<<strong>br</strong> />
Also, to avoid a possible formation of<<strong>br</strong> />
flooding wave upstream of Dam 4, as the<<strong>br</strong> />
consequence of a tunnel construction<<strong>br</strong> />
through Field 3 of the flotation tailing<<strong>br</strong> />
dump and threatening the open pit,