Fig. 3. Review of the present appearance of the flotation tailing dump Veliki Krivelj with the<<strong>br</strong> />

existing facilities for deviation of the Krivelj River in 3D format<<strong>br</strong> />

3. TECHNICAL DESCRIPTION OF<<strong>br</strong> />

THE NEW FACILITIES FOR<<strong>br</strong> />

DEVIATION OF THE<<strong>br</strong> />

KRIVELJ RIVER<<strong>br</strong> />

To realize the plans of potential development<<strong>br</strong> />

the Veliki Krivelj Mine, which<<strong>br</strong> />

include the following period until 2050, it<<strong>br</strong> />

is necessary to meet a number of preconditions,<<strong>br</strong> />

among them is certainly the<<strong>br</strong> />

construction of facilities for relocation the<<strong>br</strong> />

Krivelj River in the zone of flotation tailing<<strong>br</strong> />

dump Veliki Krivelj.<<strong>br</strong> />

For further exploitation of this mine,<<strong>br</strong> />

the construction of the following capital<<strong>br</strong> />

facilities is anticipated:<<strong>br</strong> />

- tunnel for deviation the Krivelj River<<strong>br</strong> />

in the zone of Field 2<<strong>br</strong> />

- tunnel for deviation the Krivelj River<<strong>br</strong> />

in the zone of Field 3<<strong>br</strong> />

- connections (tunnel - collector) between<<strong>br</strong> />

the existing tunnel for the <strong>Bor</strong><<strong>br</strong> />

River and a new tunnel for the<<strong>br</strong> />

Krivelj River<<strong>br</strong> />

- collector for introduction the Saraka<<strong>br</strong> />

Stream into a new tunnel of the<<strong>br</strong> />

Krivelj River.<<strong>br</strong> />

Also, it is necessary to construct the<<strong>br</strong> />

following hydrotechnical facilities:<<strong>br</strong> />

- drainage system for Dam 4<<strong>br</strong> />

- pump station of drainage water for<<strong>br</strong> />

Dam 4<<strong>br</strong> />

- system for supply of pulp and gravitational<<strong>br</strong> />

power of hydrocyclone on<<strong>br</strong> />

Dam 4.<<strong>br</strong> />

In addition to the construction of these<<strong>br</strong> />

facilities, it is necessary to install the new<<strong>br</strong> />

pipelines for return the feedback water<<strong>br</strong> />

from the lake of Field 3 to the tanks of the<<strong>br</strong> />

Krivelj Flotation Plant or connection into<<strong>br</strong> />

the existing system of feedback water and<<strong>br</strong> />

to make the relocation of pipeline for<<strong>br</strong> />

drinking water Surdup - <strong>Bor</strong>.<<strong>br</strong> />

No 4, <strong>2011</strong>. 61<<strong>br</strong> />

MINING ENGINEERING