Works on overburden excavation began<<strong>br</strong> />

in 1979, and the first quantity of ore<<strong>br</strong> />

were excavated in 1982.Today, production<<strong>br</strong> />

of copper concentrate from the ore of the<<strong>br</strong> />

open pit Veliki Krivelj makes about 75%<<strong>br</strong> />

of the total production of RBB, while the<<strong>br</strong> />

share of open pit ore is with about 90% of<<strong>br</strong> />

the excavated ore, with a trend of further<<strong>br</strong> />

increasing.<<strong>br</strong> />

The crushing plants, flotation and<<strong>br</strong> />

other auxiliary facilities were built in the<<strong>br</strong> />

near vicinity of open pit, necessary for<<strong>br</strong> />

exploitation and processing, and enrichment<<strong>br</strong> />

of ore by the flotation method. The<<strong>br</strong> />

resulting copper concentrate is transported<<strong>br</strong> />

and processed in the Smelter in <strong>Bor</strong>.<<strong>br</strong> />

Copper mine Veliki Krivelj since the<<strong>br</strong> />

beginning of ore exploitation uses the<<strong>br</strong> />

space, obtained by damming the Krivelj<<strong>br</strong> />

River valley, for disposal the flotation<<strong>br</strong> />

tailings.<<strong>br</strong> />

In order to realize the new extension of<<strong>br</strong> />

flotation tailing dump, it is necessary to<<strong>br</strong> />

previously build the new facilities for deviation<<strong>br</strong> />

the Krivelj River, located in the<<strong>br</strong> />

zone of flotation tailings. In this way, the<<strong>br</strong> />

space will be provided for permanent disposal<<strong>br</strong> />

of flotation tailings.<<strong>br</strong> />

2. CONCEPT OF DEVELOPMENT<<strong>br</strong> />

THE COPPER MINE<<strong>br</strong> />

VELIKI KRIVELJ<<strong>br</strong> />

Based on the verified reserves of copper<<strong>br</strong> />

ore, the adopted annual ore mining<<strong>br</strong> />

capacity of 10.6 million tons of copper<<strong>br</strong> />

and predicted copper price on the world<<strong>br</strong> />

metal market of 6 000 $ per ton of cathode,<<strong>br</strong> />

the final optimum contour of open pit<<strong>br</strong> />

was defined to k-100, within which the<<strong>br</strong> />

future exploitation will be developed until<<strong>br</strong> />

2050, Figures 1 and 2.<<strong>br</strong> />

Conceptual development of open pit in<<strong>br</strong> />

the future period of exploitation is committed<<strong>br</strong> />

on the basis of the following conditions:<<strong>br</strong> />

� maximum utili<strong>za</strong>tion of deposit,<<strong>br</strong> />

� maintaining the continuity in the ore<<strong>br</strong> />

excavation, with corresponding<<strong>br</strong> />

quantities of overburden,<<strong>br</strong> />

� possibility of mining the ore parties<<strong>br</strong> />

with different copper contents and<<strong>br</strong> />

making the certain suitable composite,<<strong>br</strong> />

� creation the opportunities for smooth<<strong>br</strong> />

operation of several units of the applied<<strong>br</strong> />

basic equipment, and their<<strong>br</strong> />

work on different locations at the<<strong>br</strong> />

open pit,<<strong>br</strong> />

� providing the necessary security,<<strong>br</strong> />

both in the execution of mining<<strong>br</strong> />

works, and after excavation at the<<strong>br</strong> />

open pit.<<strong>br</strong> />

The basic exploitation parameters of<<strong>br</strong> />

the final optimum contour of the open pit<<strong>br</strong> />

Veliki Krivelj are:<<strong>br</strong> />

� total quantity of excavation, t<<strong>br</strong> />

..................................912 773 628<<strong>br</strong> />

� quantity of overburden, t<<strong>br</strong> />

..................................503 115 419<<strong>br</strong> />

� quantity of ore, t<<strong>br</strong> />

..................................409 658 209<<strong>br</strong> />

� limit copper content in the ore, % Cu<<strong>br</strong> />

..................................0.150<<strong>br</strong> />

� average copper content in the ore, % Cu<<strong>br</strong> />

..................................0.324<<strong>br</strong> />

� overburden coefficient, t/t<<strong>br</strong> />

..................................1.228<<strong>br</strong> />

No 4, <strong>2011</strong>. 58<<strong>br</strong> />

MINING ENGINEERING