Works on overburden excavation began<<strong>br</strong> />
in 1979, and the first quantity of ore<<strong>br</strong> />
were excavated in 1982.Today, production<<strong>br</strong> />
of copper concentrate from the ore of the<<strong>br</strong> />
open pit Veliki Krivelj makes about 75%<<strong>br</strong> />
of the total production of RBB, while the<<strong>br</strong> />
share of open pit ore is with about 90% of<<strong>br</strong> />
the excavated ore, with a trend of further<<strong>br</strong> />
increasing.<<strong>br</strong> />
The crushing plants, flotation and<<strong>br</strong> />
other auxiliary facilities were built in the<<strong>br</strong> />
near vicinity of open pit, necessary for<<strong>br</strong> />
exploitation and processing, and enrichment<<strong>br</strong> />
of ore by the flotation method. The<<strong>br</strong> />
resulting copper concentrate is transported<<strong>br</strong> />
and processed in the Smelter in <strong>Bor</strong>.<<strong>br</strong> />
Copper mine Veliki Krivelj since the<<strong>br</strong> />
beginning of ore exploitation uses the<<strong>br</strong> />
space, obtained by damming the Krivelj<<strong>br</strong> />
River valley, for disposal the flotation<<strong>br</strong> />
tailings.<<strong>br</strong> />
In order to realize the new extension of<<strong>br</strong> />
flotation tailing dump, it is necessary to<<strong>br</strong> />
previously build the new facilities for deviation<<strong>br</strong> />
the Krivelj River, located in the<<strong>br</strong> />
zone of flotation tailings. In this way, the<<strong>br</strong> />
space will be provided for permanent disposal<<strong>br</strong> />
of flotation tailings.<<strong>br</strong> />
2. CONCEPT OF DEVELOPMENT<<strong>br</strong> />
THE COPPER MINE<<strong>br</strong> />
VELIKI KRIVELJ<<strong>br</strong> />
Based on the verified reserves of copper<<strong>br</strong> />
ore, the adopted annual ore mining<<strong>br</strong> />
capacity of 10.6 million tons of copper<<strong>br</strong> />
and predicted copper price on the world<<strong>br</strong> />
metal market of 6 000 $ per ton of cathode,<<strong>br</strong> />
the final optimum contour of open pit<<strong>br</strong> />
was defined to k-100, within which the<<strong>br</strong> />
future exploitation will be developed until<<strong>br</strong> />
2050, Figures 1 and 2.<<strong>br</strong> />
Conceptual development of open pit in<<strong>br</strong> />
the future period of exploitation is committed<<strong>br</strong> />
on the basis of the following conditions:<<strong>br</strong> />
� maximum utili<strong>za</strong>tion of deposit,<<strong>br</strong> />
� maintaining the continuity in the ore<<strong>br</strong> />
excavation, with corresponding<<strong>br</strong> />
quantities of overburden,<<strong>br</strong> />
� possibility of mining the ore parties<<strong>br</strong> />
with different copper contents and<<strong>br</strong> />
making the certain suitable composite,<<strong>br</strong> />
� creation the opportunities for smooth<<strong>br</strong> />
operation of several units of the applied<<strong>br</strong> />
basic equipment, and their<<strong>br</strong> />
work on different locations at the<<strong>br</strong> />
open pit,<<strong>br</strong> />
� providing the necessary security,<<strong>br</strong> />
both in the execution of mining<<strong>br</strong> />
works, and after excavation at the<<strong>br</strong> />
open pit.<<strong>br</strong> />
The basic exploitation parameters of<<strong>br</strong> />
the final optimum contour of the open pit<<strong>br</strong> />
Veliki Krivelj are:<<strong>br</strong> />
� total quantity of excavation, t<<strong>br</strong> />
..................................912 773 628<<strong>br</strong> />
� quantity of overburden, t<<strong>br</strong> />
..................................503 115 419<<strong>br</strong> />
� quantity of ore, t<<strong>br</strong> />
..................................409 658 209<<strong>br</strong> />
� limit copper content in the ore, % Cu<<strong>br</strong> />
..................................0.150<<strong>br</strong> />
� average copper content in the ore, % Cu<<strong>br</strong> />
..................................0.324<<strong>br</strong> />
� overburden coefficient, t/t<<strong>br</strong> />
..................................1.228<<strong>br</strong> />
No 4, <strong>2011</strong>. 58<<strong>br</strong> />
MINING ENGINEERING