24.02.2013 Views

Rudarski radovi br 4 2011 - Institut za rudarstvo i metalurgiju Bor

Rudarski radovi br 4 2011 - Institut za rudarstvo i metalurgiju Bor

Rudarski radovi br 4 2011 - Institut za rudarstvo i metalurgiju Bor

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Structural characteristics<<strong>br</strong> />

Determining the relationship between<<strong>br</strong> />

humidity and dry bulk density of soil using<<strong>br</strong> />

the Proctor test, the optimum water content<<strong>br</strong> />

Wopt. is 5.93% at which maximum bulk<<strong>br</strong> />

density γdmax = 2.282 g/cm 3 (Figure 4).<<strong>br</strong> />

Fig. 4. Determining the relationship between moisture content and dry bulk density of soil<<strong>br</strong> />

Determination of the Californian loading<<strong>br</strong> />

index (Figure 5), derived after the<<strong>br</strong> />

Proktor test, showed that the CBR (95%<<strong>br</strong> />

γdmax) is 98% (prescribed min. is 80%).<<strong>br</strong> />

Fig. 5. Determination of the Californian loading index<<strong>br</strong> />

No 4, <strong>2011</strong>. 47<<strong>br</strong> />

MINING ENGINEERING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!