MINING AND METALLURGY INSTITUTE BOR YU ISSN: 1451-0162<<strong>br</strong> />

COMMITTEE OF UNDERGROUND EXPLOITATION OF THE MINERAL DEPOSITS UDK: 622<<strong>br</strong> />

UDK: 622.272:666.972 (045)=20<<strong>br</strong> />

Abstract<<strong>br</strong> />

Dragan Ignjatović*, Milenko Ljubojev * , Lidija Đurđevac Ignjatović * , Dušan Tašić *<<strong>br</strong> />

PHYSICAL AND MECHANICAL PROPERTIES OF<<strong>br</strong> />

ANCHOR MIXTURE APPLIED IN THE ORE BODY “T” **<<strong>br</strong> />

One of the materials, used for ensuring the stability in exploitation the ore body “T“ is the anchor<<strong>br</strong> />

mixture. It was necessary to check the physical and mechanical properties of anchor mixture<<strong>br</strong> />

because of its participation in the rock mass stability. The results of these tests are present in this<<strong>br</strong> />

paper.<<strong>br</strong> />

Key words: anchor mixture, ore body “T”, physical and mechanical properties<<strong>br</strong> />

INTRODUCTION<<strong>br</strong> />

Concrete is a heterogeneous, multiphase<<strong>br</strong> />

material, obtained by binding various<<strong>br</strong> />

types of aggregates with the cement<<strong>br</strong> />

paste. Aggregate present a linear elastic<<strong>br</strong> />

component and the cement paste is high<<strong>br</strong> />

elastic component.<<strong>br</strong> />

Mixing of concrete components in the<<strong>br</strong> />

controlled conditions is aimed to obtain<<strong>br</strong> />

more complete homogeni<strong>za</strong>tion of mixture<<strong>br</strong> />

with properly bound aggregate and cement<<strong>br</strong> />

paste.<<strong>br</strong> />

On the request of the company<<strong>br</strong> />

Polimerinžekt Ltd. from Bulgaria, which<<strong>br</strong> />

carried out the works on ensuring the rock<<strong>br</strong> />

mass stability in exploitation the “T” ore<<strong>br</strong> />

body in the <strong>Bor</strong> pit mine, the samples of<<strong>br</strong> />

anchor mixture were tested on a compressive<<strong>br</strong> />

strength.<<strong>br</strong> />

Samples were delivered by Polimerinžekt<<strong>br</strong> />

Ltd.<<strong>br</strong> />

TESTS RESULTS<<strong>br</strong> />

Anchor mixture samples were delivered<<strong>br</strong> />

to the Laboratory for Geomechanics.<<strong>br</strong> />

Dimensions of the samples were 7.3 cm<<strong>br</strong> />

(diameter) and 7.5 cm (height), Figure 1.<<strong>br</strong> />

Figure 2 presents the appearance of<<strong>br</strong> />

samples after testing.<<strong>br</strong> />

* Mining and Metallurgy <strong>Institut</strong>e <strong>Bor</strong><<strong>br</strong> />

** This paper is produced from the project no. 33021 “Researching and monitoring changes in<<strong>br</strong> />

stress-deformation condition of rock massif “in-situ” around undergraund facilities with development<<strong>br</strong> />

of model with special emphasis on Krivelj river tunnel and <strong>Bor</strong> pit”, which is funded by<<strong>br</strong> />

means of the Ministry of Education and Science of the Republic of Serbia<<strong>br</strong> />

No 4, <strong>2011</strong>. 33<<strong>br</strong> />