24.02.2013 Views

Rudarski radovi br 4 2011 - Institut za rudarstvo i metalurgiju Bor

Rudarski radovi br 4 2011 - Institut za rudarstvo i metalurgiju Bor

Rudarski radovi br 4 2011 - Institut za rudarstvo i metalurgiju Bor

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Changing the first position for alternative<<strong>br</strong> />

A 2 can occur if there is a<<strong>br</strong> />

change of weight criteria F7, F11, F12,<<strong>br</strong> />

F17, or if the value of weight to these<<strong>br</strong> />

criteria (Table 17) is respectively<<strong>br</strong> />

higher than 0.201;0.196;0.195;0.195.<<strong>br</strong> />

11. CONCLUSION<<strong>br</strong> />

The need for a compromise solution<<strong>br</strong> />

is more pronounced for solving tasks<<strong>br</strong> />

with conflicting and heterogeneous criteria<<strong>br</strong> />

(opposed and expressed in different<<strong>br</strong> />

units of measure) as it is the case in this<<strong>br</strong> />

paper. The result of VKO has a great<<strong>br</strong> />

chance to be accepted as a good compromise<<strong>br</strong> />

between the different interests<<strong>br</strong> />

of participants in deciding if it is acceptable<<strong>br</strong> />

to the majority in decision-making<<strong>br</strong> />

process, but also that there are no bad<<strong>br</strong> />

criterion indicators that would make<<strong>br</strong> />

«opponents» not to accept it.<<strong>br</strong> />

REFERENCES<<strong>br</strong> />

[1] Faculty of Civil Engineering in<<strong>br</strong> />

Podgorica, <strong>Institut</strong>e of Transport and<<strong>br</strong> />

Traffic Engineering in Belgrade,<<strong>br</strong> />

Study of traffic flows and<<strong>br</strong> />

determining the emergency of<<strong>br</strong> />

bottlenecks in the network of<<strong>br</strong> />

existing roads in the corridor of<<strong>br</strong> />

planned highways and roads<<strong>br</strong> />

reserved for motor vehicles in<<strong>br</strong> />

Montenegro, 1998 (in Serbian)<<strong>br</strong> />

[2] <strong>Institut</strong>e of Transport and Traffic<<strong>br</strong> />

Engineering, Project evaluation<<strong>br</strong> />

version of the highway Belgrade –<<strong>br</strong> />

South Adriatic on the part of<<strong>br</strong> />

Belgrade to Požega, Belgrade,<<strong>br</strong> />

November 1998 (in Serbian)<<strong>br</strong> />

[3] Kuzović Lj., Determining the need<<strong>br</strong> />

and justification for transit traffic<<strong>br</strong> />

separation from city arteries by<<strong>br</strong> />

constructing bypasses, University of<<strong>br</strong> />

Belgrade, Belgrade, 1997 (in<<strong>br</strong> />

Serbian)<<strong>br</strong> />

[4] Kuzović Lj., Evaluation in<<strong>br</strong> />

management with development and<<strong>br</strong> />

exploitation of the road network,<<strong>br</strong> />

University of Belgrade, Belgrade,<<strong>br</strong> />

1994 (in Serbian)<<strong>br</strong> />

[5] Kuzović Lj., Evaluation in<<strong>br</strong> />

optimizing plans and projects of<<strong>br</strong> />

roads, SIT traffic and link of<<strong>br</strong> />

Yugoslavia, Belgrade, 1984 (in<<strong>br</strong> />

Serbian)<<strong>br</strong> />

[6] Louis Berger, Technical<<strong>br</strong> />

Memorandum No. 14 conducted on<<strong>br</strong> />

traffic counts and interviews in the<<strong>br</strong> />

road network of Montenegro,<<strong>br</strong> />

October, 2007<<strong>br</strong> />

[7] M. Maletin, et al., The study of<<strong>br</strong> />

alternative solutions of route of the<<strong>br</strong> />

outside main road tangent (OMRT),<<strong>br</strong> />

University of Belgrade, The Faculty<<strong>br</strong> />

of Civil Engineering, Geotechnical<<strong>br</strong> />

and Roads <strong>Institut</strong>e, Belgrade 1989<<strong>br</strong> />

(in Serbian)<<strong>br</strong> />

[8] Opricović S., Multicriterion<<strong>br</strong> />

optimi<strong>za</strong>tion systems in construction,<<strong>br</strong> />

The Faculty of Civil Engineering,<<strong>br</strong> />

University of Belgrade, Belgrade,<<strong>br</strong> />

1998 (in Serbian)<<strong>br</strong> />

No 4, <strong>2011</strong>. 190<<strong>br</strong> />

MINING ENGINEERING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!