24.02.2013 Views

Rudarski radovi br 4 2011 - Institut za rudarstvo i metalurgiju Bor

Rudarski radovi br 4 2011 - Institut za rudarstvo i metalurgiju Bor

Rudarski radovi br 4 2011 - Institut za rudarstvo i metalurgiju Bor

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Fig. 2. Distribution of responses for goals 3,4,5 and 6<<strong>br</strong> />

Table 14. Difficulties of goals and criterion functions<<strong>br</strong> />

Goal W Indicators<<strong>br</strong> />

Minimum costs of construction<<strong>br</strong> />

Minimum costs of maintenance<<strong>br</strong> />

Minimum costs of exploitation<<strong>br</strong> />

Minimum costs of of<<strong>br</strong> />

traffic accidents (maximum<<strong>br</strong> />

security and safety)<<strong>br</strong> />

Maximum positive impact<<strong>br</strong> />

on the development<<strong>br</strong> />

of the area<<strong>br</strong> />

0.17<<strong>br</strong> />

0.16<<strong>br</strong> />

0.164<<strong>br</strong> />

0.24<<strong>br</strong> />

0.146<<strong>br</strong> />

The route in<<strong>br</strong> />

spatial conflict<<strong>br</strong> />

with the adopted<<strong>br</strong> />

SP<<strong>br</strong> />

Preservation of<<strong>br</strong> />

existing settlements<<strong>br</strong> />

and encouragement<<strong>br</strong> />

of<<strong>br</strong> />

urban planning<<strong>br</strong> />

Preservation of<<strong>br</strong> />

agricultural and<<strong>br</strong> />

forest areas<<strong>br</strong> />

The reality of<<strong>br</strong> />

performance<<strong>br</strong> />

No 4, <strong>2011</strong>. 187<<strong>br</strong> />

MINING ENGINEERING<<strong>br</strong> />

W<<strong>br</strong> />

rel<<strong>br</strong> />

Crit. F. Wrel fi Wi<<strong>br</strong> />

Total construction<<strong>br</strong> />

costs in<<strong>br</strong> />

Euro<<strong>br</strong> />

Construction<<strong>br</strong> />

costs in<<strong>br</strong> />

Euro/year<<strong>br</strong> />

Exploitation<<strong>br</strong> />

costs in<<strong>br</strong> />

Euro/year<<strong>br</strong> />

Costs of traffic<<strong>br</strong> />

accidents in<<strong>br</strong> />

Euro/year<<strong>br</strong> />

Compliance<<strong>br</strong> />

with SP<<strong>br</strong> />

Preservation and<<strong>br</strong> />

promotion rating<<strong>br</strong> />

of the future<<strong>br</strong> />

urban planning<<strong>br</strong> />

Land area under<<strong>br</strong> />

unfavorable<<strong>br</strong> />

influence<<strong>br</strong> />

The needs for<<strong>br</strong> />

displacement,<<strong>br</strong> />

possibility of<<strong>br</strong> />

material procurement,construction<<strong>br</strong> />

in<<strong>br</strong> />

stages<<strong>br</strong> />

1 0.17<<strong>br</strong> />

2 0.16<<strong>br</strong> />

3 0.164<<strong>br</strong> />

4 0.24<<strong>br</strong> />

0.15 5 0.022<<strong>br</strong> />

0.20 6 0.029<<strong>br</strong> />

0.30 7 0.044<<strong>br</strong> />

0.35 8 0.051

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!