24.02.2013 Views

Rudarski radovi br 4 2011 - Institut za rudarstvo i metalurgiju Bor

Rudarski radovi br 4 2011 - Institut za rudarstvo i metalurgiju Bor

Rudarski radovi br 4 2011 - Institut za rudarstvo i metalurgiju Bor

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• changes in natural look of terrainlandscape<<strong>br</strong> />

occurs in those parts of<<strong>br</strong> />

the route that is visible, respectively<<strong>br</strong> />

in those sections where the road runs<<strong>br</strong> />

in the cut, embankment, and where<<strong>br</strong> />

Table 12. Ratings of evaluation the spatial-ecological criteria<<strong>br</strong> />

Ord<<strong>br</strong> />

.<<strong>br</strong> />

No.<<strong>br</strong> />

Variants<<strong>br</strong> />

Minimum<<strong>br</strong> />

air<<strong>br</strong> />

pollutin <<strong>br</strong> />

Minimum<<strong>br</strong> />

water<<strong>br</strong> />

pollution <<strong>br</strong> />

Minimum<<strong>br</strong> />

loss<<strong>br</strong> />

and<<strong>br</strong> />

land<<strong>br</strong> />

pollution<<strong>br</strong> />

Minimum<<strong>br</strong> />

impact on<<strong>br</strong> />

biotic<<strong>br</strong> />

factor<<strong>br</strong> />

*favorable variants are rated with higher grade (points)<<strong>br</strong> />

10. EVALUATION CRITERIA AND<<strong>br</strong> />

THE APPLIED METHODS<<strong>br</strong> />

To determine the optimum variant, it is<<strong>br</strong> />

necessary to take into account all traffic<<strong>br</strong> />

and technical parameters and to form the<<strong>br</strong> />

criteria based on them.<<strong>br</strong> />

Measure of achievement the objectives<<strong>br</strong> />

can be expressed by defining the following<<strong>br</strong> />

criteria:<<strong>br</strong> />

• Minimum construction costs;<<strong>br</strong> />

• Minimum maintenance costs;<<strong>br</strong> />

• Minimum exploitation costs;<<strong>br</strong> />

Minimum<<strong>br</strong> />

impact on<<strong>br</strong> />

population<<strong>br</strong> />

health and<<strong>br</strong> />

sociological<<strong>br</strong> />

factors<<strong>br</strong> />

the obstacles are overcome by<<strong>br</strong> />

<strong>br</strong>idges, overpasses and other overhead<<strong>br</strong> />

constructions.<<strong>br</strong> />

Ratings are given in Table 12.<<strong>br</strong> />

Minimum<<strong>br</strong> />

noise<<strong>br</strong> />

and<<strong>br</strong> />

vi<strong>br</strong>ation<<strong>br</strong> />

Minimum<<strong>br</strong> />

contact with<<strong>br</strong> />

protected<<strong>br</strong> />

natural<<strong>br</strong> />

areas<<strong>br</strong> />

Minimum<<strong>br</strong> />

negative<<strong>br</strong> />

impact on<<strong>br</strong> />

culturalhistoricalmonuments <<strong>br</strong> />

Minimum<<strong>br</strong> />

impact<<strong>br</strong> />

on<<strong>br</strong> />

landscape<<strong>br</strong> />

+ +<<strong>br</strong> />

High<<strong>br</strong> />

variant<<strong>br</strong> />

from<<strong>br</strong> />

+ + + + + + + + +<<strong>br</strong> />

1. 0.0 km to<<strong>br</strong> />

9.5 km +<<strong>br</strong> />

High to<<strong>br</strong> />

Uvča<<strong>br</strong> />

High<<strong>br</strong> />

variant<<strong>br</strong> />

from<<strong>br</strong> />

90 85 65 70 85 85 95 100 50<<strong>br</strong> />

2. 0.0 km to<<strong>br</strong> />

9.5 km +<<strong>br</strong> />

Low to<<strong>br</strong> />

Uvča<<strong>br</strong> />

90 85 80 80 85 85 95 100 60<<strong>br</strong> />

• Maximum security, safety and traffic<<strong>br</strong> />

comfort (which corresponds to<<strong>br</strong> />

minimum costs of accidents);<<strong>br</strong> />

• Maximum impact on development of<<strong>br</strong> />

the area;<<strong>br</strong> />

• Minimum spatial-ecological effects<<strong>br</strong> />

(which corresponds to maximum protection<<strong>br</strong> />

against impact of negative effects).<<strong>br</strong> />

No 4, <strong>2011</strong>. 185<<strong>br</strong> />

MINING ENGINEERING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!