Rudarski radovi br 4 2011 - Institut za rudarstvo i metalurgiju Bor
Rudarski radovi br 4 2011 - Institut za rudarstvo i metalurgiju Bor
Rudarski radovi br 4 2011 - Institut za rudarstvo i metalurgiju Bor
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Table 11. Ratings of individual criteria evaluation indicators, impact on the overall<<strong>br</strong> />
development of area<<strong>br</strong> />
Ord.<<strong>br</strong> />
No.<<strong>br</strong> />
1<<strong>br</strong> />
2<<strong>br</strong> />
Variants<<strong>br</strong> />
High variant<<strong>br</strong> />
from<<strong>br</strong> />
0.0 km to<<strong>br</strong> />
9.5 km +<<strong>br</strong> />
High to<<strong>br</strong> />
Uvča<<strong>br</strong> />
High variant<<strong>br</strong> />
from<<strong>br</strong> />
0.0 km to<<strong>br</strong> />
9.5 km +<<strong>br</strong> />
Low to<<strong>br</strong> />
Uvča<<strong>br</strong> />
Route in<<strong>br</strong> />
spatial<<strong>br</strong> />
conflict<<strong>br</strong> />
with the<<strong>br</strong> />
adopted<<strong>br</strong> />
PP<<strong>br</strong> />
9. SPATIAL-ECOLOGICAL<<strong>br</strong> />
CONSEQUENCES<<strong>br</strong> />
Several parameters were considered<<strong>br</strong> />
and analyzed:<<strong>br</strong> />
• air pollution – based on the number<<strong>br</strong> />
of facilities in the highway zone exposed<<strong>br</strong> />
to air pollution, pollution of<<strong>br</strong> />
surface water, ground water and<<strong>br</strong> />
sources of drinking water – based<<strong>br</strong> />
on vicinity of route and watercourses,<<strong>br</strong> />
intersection of watercourses<<strong>br</strong> />
by the highway route, vicinity of water<<strong>br</strong> />
sources,<<strong>br</strong> />
• loss and pollution of agricultural<<strong>br</strong> />
and forest land – based on the surface<<strong>br</strong> />
of affected land by the highway<<strong>br</strong> />
route,<<strong>br</strong> />
• biotic factor during construction<<strong>br</strong> />
and exploitation - on living habitat<<strong>br</strong> />
of flora and fauna, impact of the motorway<<strong>br</strong> />
was evaluated on the basis of<<strong>br</strong> />
the highway route length in the open<<strong>br</strong> />
(tunnels have no effect),<<strong>br</strong> />
EVALUATION INDICATORS BY VARIANTS<<strong>br</strong> />
Preservation of the<<strong>br</strong> />
existing settlements,<<strong>br</strong> />
encouragement of<<strong>br</strong> />
urban planning<<strong>br</strong> />
Preservation of<<strong>br</strong> />
agricultural<<strong>br</strong> />
and forest areas<<strong>br</strong> />
Reality of<<strong>br</strong> />
reali<strong>za</strong>tion<<strong>br</strong> />
1 2 3 4<<strong>br</strong> />
100 100 45 100<<strong>br</strong> />
100 100 100 100<<strong>br</strong> />
• health of population – in the parts<<strong>br</strong> />
where the highway route passes<<strong>br</strong> />
through or near settlements,<<strong>br</strong> />
• sociological opportunities – displacement<<strong>br</strong> />
or dislocation of housing<<strong>br</strong> />
and other facilities; suspension, dislocation<<strong>br</strong> />
or interception the existing<<strong>br</strong> />
communication; changed living conditions<<strong>br</strong> />
due to housing in the area of<<strong>br</strong> />
new physical structures,<<strong>br</strong> />
• noise and vi<strong>br</strong>ation – lengths were<<strong>br</strong> />
defined at which this phenomenon is<<strong>br</strong> />
expressed and their evaluation was<<strong>br</strong> />
made,<<strong>br</strong> />
• protected natural heritage – the existence<<strong>br</strong> />
of collision points of the<<strong>br</strong> />
highway route with natural objects,<<strong>br</strong> />
• existence of sites were discussed that<<strong>br</strong> />
are classified as the cultural and<<strong>br</strong> />
historical monuments on the routes<<strong>br</strong> />
of highway variants,<<strong>br</strong> />
No 4, <strong>2011</strong>. 184<<strong>br</strong> />
MINING ENGINEERING