Rudarski radovi br 4 2011 - Institut za rudarstvo i metalurgiju Bor
Rudarski radovi br 4 2011 - Institut za rudarstvo i metalurgiju Bor
Rudarski radovi br 4 2011 - Institut za rudarstvo i metalurgiju Bor
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
7. EXPLOITATION COSTS<<strong>br</strong> />
Exploitation costs, discussed in this<<strong>br</strong> />
paper, include the following costs:<<strong>br</strong> />
• fuel costs<<strong>br</strong> />
• costs of lu<strong>br</strong>icants,<<strong>br</strong> />
• costs of pneumatics,<<strong>br</strong> />
• maintenance costs and repair of vehicles.<<strong>br</strong> />
The costs for fuel, lu<strong>br</strong>icants, pneumatics,<<strong>br</strong> />
vehicle maintenance and repair are<<strong>br</strong> />
calculated according to the expressions [3]<<strong>br</strong> />
to the amount of (values in Table 9):<<strong>br</strong> />
Table 9 Average exploitation costs by<<strong>br</strong> />
variants<<strong>br</strong> />
Ord.<<strong>br</strong> />
No.<<strong>br</strong> />
Designation<<strong>br</strong> />
of variant<<strong>br</strong> />
Total<<strong>br</strong> />
length<<strong>br</strong> />
[km]<<strong>br</strong> />
Total averageexploitation<<strong>br</strong> />
costs<<strong>br</strong> />
(€/year)<<strong>br</strong> />
1 V+V 40.80 28.869.724<<strong>br</strong> />
2 V+N 36.10 26.139.172<<strong>br</strong> />
8. COSTS OF TRAFFIC ACCIDENTS<<strong>br</strong> />
Total economic costs caused by all traffic<<strong>br</strong> />
accidents on the move of road in one<<strong>br</strong> />
year, are determined by the formula [3] :<<strong>br</strong> />
T su = L×<<strong>br</strong> />
∑ Nk<<strong>br</strong> />
× Ck<<strong>br</strong> />
(€/god)<<strong>br</strong> />
k<<strong>br</strong> />
where:<<strong>br</strong> />
k – indication of accident type<<strong>br</strong> />
( 1 –accident with deadly injuries;<<strong>br</strong> />
2 – accidents with serious body<<strong>br</strong> />
injuries; 3 – accidents without<<strong>br</strong> />
serious body injuries).<<strong>br</strong> />
Table 10. Average exploitation costs by<<strong>br</strong> />
variants<<strong>br</strong> />
Ord.<<strong>br</strong> />
No.<<strong>br</strong> />
Designation<<strong>br</strong> />
of variant<<strong>br</strong> />
Total<<strong>br</strong> />
length<<strong>br</strong> />
[km]<<strong>br</strong> />
Average<<strong>br</strong> />
costs of traffic<<strong>br</strong> />
accidents<<strong>br</strong> />
(€/year)<<strong>br</strong> />
1 V+V 40.80 261.692,00<<strong>br</strong> />
2 V+N 36.10 231.627,00<<strong>br</strong> />
Nk – average number of accidents per<<strong>br</strong> />
kilometer per year, for the certain<<strong>br</strong> />
types of accidents k (accident/km/year).<<strong>br</strong> />
This value depends<<strong>br</strong> />
on the type of road and<<strong>br</strong> />
AADT.<<strong>br</strong> />
L - length of a part of variant (km),<<strong>br</strong> />
Ck- average economic costs per accident<<strong>br</strong> />
for k – this type of accident<<strong>br</strong> />
(€)<<strong>br</strong> />
Overview of these costs is given in<<strong>br</strong> />
Table 10.<<strong>br</strong> />
9. IMPACT ON THE OVERALL<<strong>br</strong> />
DEVELOPMENT OF AREA<<strong>br</strong> />
Parameters that affect the overall development<<strong>br</strong> />
of the area have been avaluated<<strong>br</strong> />
through the following items:<<strong>br</strong> />
• route in the spatial conflict (conflict<<strong>br</strong> />
with regional plans is evaluated through<<strong>br</strong> />
the length of such track, or points);<<strong>br</strong> />
• preservation of existing settlements<<strong>br</strong> />
and encouragement of future urbani<strong>za</strong>tion<<strong>br</strong> />
(evaluation of points);<<strong>br</strong> />
• preservation of ugricultural and forest<<strong>br</strong> />
areas (is evalued by points);<<strong>br</strong> />
• the reality of performance, which is<<strong>br</strong> />
evaluated based on the need for resettlement,<<strong>br</strong> />
the possibility of obtaining<<strong>br</strong> />
the necessary material (for embankments),<<strong>br</strong> />
etc..<<strong>br</strong> />
Assessments for evaluation are given<<strong>br</strong> />
in Table 11.<<strong>br</strong> />
No 4, <strong>2011</strong>. 183<<strong>br</strong> />
MINING ENGINEERING