24.02.2013 Views

Rudarski radovi br 4 2011 - Institut za rudarstvo i metalurgiju Bor

Rudarski radovi br 4 2011 - Institut za rudarstvo i metalurgiju Bor

Rudarski radovi br 4 2011 - Institut za rudarstvo i metalurgiju Bor

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

7. EXPLOITATION COSTS<<strong>br</strong> />

Exploitation costs, discussed in this<<strong>br</strong> />

paper, include the following costs:<<strong>br</strong> />

• fuel costs<<strong>br</strong> />

• costs of lu<strong>br</strong>icants,<<strong>br</strong> />

• costs of pneumatics,<<strong>br</strong> />

• maintenance costs and repair of vehicles.<<strong>br</strong> />

The costs for fuel, lu<strong>br</strong>icants, pneumatics,<<strong>br</strong> />

vehicle maintenance and repair are<<strong>br</strong> />

calculated according to the expressions [3]<<strong>br</strong> />

to the amount of (values in Table 9):<<strong>br</strong> />

Table 9 Average exploitation costs by<<strong>br</strong> />

variants<<strong>br</strong> />

Ord.<<strong>br</strong> />

No.<<strong>br</strong> />

Designation<<strong>br</strong> />

of variant<<strong>br</strong> />

Total<<strong>br</strong> />

length<<strong>br</strong> />

[km]<<strong>br</strong> />

Total averageexploitation<<strong>br</strong> />

costs<<strong>br</strong> />

(€/year)<<strong>br</strong> />

1 V+V 40.80 28.869.724<<strong>br</strong> />

2 V+N 36.10 26.139.172<<strong>br</strong> />

8. COSTS OF TRAFFIC ACCIDENTS<<strong>br</strong> />

Total economic costs caused by all traffic<<strong>br</strong> />

accidents on the move of road in one<<strong>br</strong> />

year, are determined by the formula [3] :<<strong>br</strong> />

T su = L×<<strong>br</strong> />

∑ Nk<<strong>br</strong> />

× Ck<<strong>br</strong> />

(€/god)<<strong>br</strong> />

k<<strong>br</strong> />

where:<<strong>br</strong> />

k – indication of accident type<<strong>br</strong> />

( 1 –accident with deadly injuries;<<strong>br</strong> />

2 – accidents with serious body<<strong>br</strong> />

injuries; 3 – accidents without<<strong>br</strong> />

serious body injuries).<<strong>br</strong> />

Table 10. Average exploitation costs by<<strong>br</strong> />

variants<<strong>br</strong> />

Ord.<<strong>br</strong> />

No.<<strong>br</strong> />

Designation<<strong>br</strong> />

of variant<<strong>br</strong> />

Total<<strong>br</strong> />

length<<strong>br</strong> />

[km]<<strong>br</strong> />

Average<<strong>br</strong> />

costs of traffic<<strong>br</strong> />

accidents<<strong>br</strong> />

(€/year)<<strong>br</strong> />

1 V+V 40.80 261.692,00<<strong>br</strong> />

2 V+N 36.10 231.627,00<<strong>br</strong> />

Nk – average number of accidents per<<strong>br</strong> />

kilometer per year, for the certain<<strong>br</strong> />

types of accidents k (accident/km/year).<<strong>br</strong> />

This value depends<<strong>br</strong> />

on the type of road and<<strong>br</strong> />

AADT.<<strong>br</strong> />

L - length of a part of variant (km),<<strong>br</strong> />

Ck- average economic costs per accident<<strong>br</strong> />

for k – this type of accident<<strong>br</strong> />

(€)<<strong>br</strong> />

Overview of these costs is given in<<strong>br</strong> />

Table 10.<<strong>br</strong> />

9. IMPACT ON THE OVERALL<<strong>br</strong> />

DEVELOPMENT OF AREA<<strong>br</strong> />

Parameters that affect the overall development<<strong>br</strong> />

of the area have been avaluated<<strong>br</strong> />

through the following items:<<strong>br</strong> />

• route in the spatial conflict (conflict<<strong>br</strong> />

with regional plans is evaluated through<<strong>br</strong> />

the length of such track, or points);<<strong>br</strong> />

• preservation of existing settlements<<strong>br</strong> />

and encouragement of future urbani<strong>za</strong>tion<<strong>br</strong> />

(evaluation of points);<<strong>br</strong> />

• preservation of ugricultural and forest<<strong>br</strong> />

areas (is evalued by points);<<strong>br</strong> />

• the reality of performance, which is<<strong>br</strong> />

evaluated based on the need for resettlement,<<strong>br</strong> />

the possibility of obtaining<<strong>br</strong> />

the necessary material (for embankments),<<strong>br</strong> />

etc..<<strong>br</strong> />

Assessments for evaluation are given<<strong>br</strong> />

in Table 11.<<strong>br</strong> />

No 4, <strong>2011</strong>. 183<<strong>br</strong> />

MINING ENGINEERING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!