Table 6. Forecasts for AADT<<strong>br</strong> />
Year PA BUS LT ST TT AV<<strong>br</strong> />
PGDS<<strong>br</strong> />
(drive/day)<<strong>br</strong> />
2007 4623 143 257 292 86 399 5800<<strong>br</strong> />
2008 5085 157 283 321 95 439 6380<<strong>br</strong> />
2009 5594 173 311 353 104 483 7018<<strong>br</strong> />
2010 6153 190 342 389 115 531 7720<<strong>br</strong> />
<strong>2011</strong> 6769 209 377 427 126 584 8492<<strong>br</strong> />
2012 7073 218 394 447 132 610 8874<<strong>br</strong> />
2013 7391 228 411 467 138 638 9273<<strong>br</strong> />
2014 7724 239 430 488 144 667 9691<<strong>br</strong> />
2015 8072 249 449 510 150 697 10127<<strong>br</strong> />
2016 8378 259 466 529 156 723 10511<<strong>br</strong> />
2017 8697 269 484 549 162 751 10911<<strong>br</strong> />
2018 9027 279 502 570 168 779 11325<<strong>br</strong> />
2019 9370 289 521 592 175 809 11756<<strong>br</strong> />
2020 9726 300 541 614 181 839 12203<<strong>br</strong> />
2021 10096 312 562 637 188 871 12666<<strong>br</strong> />
2022 10479 324 583 662 195 904 13148<<strong>br</strong> />
2023 10878 336 605 687 203 939 13647<<strong>br</strong> />
2024 11291 349 628 713 210 974 14166<<strong>br</strong> />
2025 11720 362 652 740 218 1012 14704<<strong>br</strong> />
2026 12165 376 677 768 227 1050 15263<<strong>br</strong> />
2027 12628 390 703 797 235 1090 15843<<strong>br</strong> />
Table 7. Total construction costs by variants<<strong>br</strong> />
Ord.No.<<strong>br</strong> />
Designation of<<strong>br</strong> />
variant<<strong>br</strong> />
Total length<<strong>br</strong> />
Total amount of<<strong>br</strong> />
construction costs<<strong>br</strong> />
Average price per<<strong>br</strong> />
km<<strong>br</strong> />
[km] (€) (€/km)<<strong>br</strong> />
1 V+V 40.80 649,056,603 15,903,182.88<<strong>br</strong> />
2 V+N 36.10 639,725,443 17,709,153.00<<strong>br</strong> />
6. MAINTENANCE COSTS<<strong>br</strong> />
The maintenance costs include the<<strong>br</strong> />
costs of:<<strong>br</strong> />
• regular maintenance,<<strong>br</strong> />
• investment maintenance, and<<strong>br</strong> />
• winter maintenance.<<strong>br</strong> />
Regular maintenance includes the repair<<strong>br</strong> />
of damage: the roadway, gutters, other drai<<strong>br</strong> />
age facilities, traffic signals, etc. Investment<<strong>br</strong> />
maintenance includes the restoration of asphalt<<strong>br</strong> />
wearing layer. Winter maintenance<<strong>br</strong> />
includes the maintenance of roads in satisfactory<<strong>br</strong> />
condition during the winter period. Total<<strong>br</strong> />
maintenance costs are calculated by variants<<strong>br</strong> />
in [3] and given in Table 8.<<strong>br</strong> />
Table 8. Total maintenance costs by variants<<strong>br</strong> />
Ord.No.<<strong>br</strong> />
Designation of variant<<strong>br</strong> />
Total length [km]<<strong>br</strong> />
Total costs of maintenance<<strong>br</strong> />
(€/year)<<strong>br</strong> />
1 V+V 40.80 1,403,036.00<<strong>br</strong> />
2 V+N 36.10 1,246,085.00<<strong>br</strong> />
No 4, <strong>2011</strong>. 182<<strong>br</strong> />