Table 3. Slopes of level<<strong>br</strong> />
Variant<<strong>br</strong> />
The total length of the<<strong>br</strong> />
route -<<strong>br</strong> />
Slopes of the level<<strong>br</strong> />
m ≤2% 2-5% >5%<<strong>br</strong> />
V+V 40.813 13.094 19.054 8.664<<strong>br</strong> />
V+N 36.124 8.689 17.758 9.666<<strong>br</strong> />
Table 4. Inclusion of facilities along the route<<strong>br</strong> />
Variant<<strong>br</strong> />
Length<<strong>br</strong> />
Viaducts and <strong>br</strong>idges<<strong>br</strong> />
on the left and right<<strong>br</strong> />
roadway<<strong>br</strong> />
Tunnels on the left and<<strong>br</strong> />
right roadway<<strong>br</strong> />
[km] Number [km] Number [km]<<strong>br</strong> />
V+V 40.81 32 10.09 22 21.96<<strong>br</strong> />
V+N 36.12 38 9.18 26 27.43<<strong>br</strong> />
Table 5. Structure of traffic flow<<strong>br</strong> />
Category PA BUS LT ST TT AV TOTAL<<strong>br</strong> />
Participation % 79.7 2.5 4.4 5.0 1.5 6.9 100<<strong>br</strong> />
4. TRAFFIC LOAD<<strong>br</strong> />
Traffic load in the base year is determined<<strong>br</strong> />
on the basis of reports of traffic<<strong>br</strong> />
counting Bioče (Louis Berger, October<<strong>br</strong> />
2007), or empirical and modeling annual<<strong>br</strong> />
average daily traffic (AADT) in 2007 for the<<strong>br</strong> />
road M-2, section Podgorica – Bioče and<<strong>br</strong> />
the road R-19, section Bioče – Mateševo.<<strong>br</strong> />
Structure of traffic flow in the future<<strong>br</strong> />
highway is determined based on permanent<<strong>br</strong> />
seven-day traffic count (Table 5) on<<strong>br</strong> />
the road M-2, section Podgorica – Bioče<<strong>br</strong> />
in October 2007.<<strong>br</strong> />
Based on the mentioned data and assumptions,<<strong>br</strong> />
the traffic load (AADT) for<<strong>br</strong> />
future highway section Smokovac – Uvač<<strong>br</strong> />
(Table 6) was calculated in the period<<strong>br</strong> />
2008 – 2027.<<strong>br</strong> />
5. CONSTRUCTION COSTS<<strong>br</strong> />
Estimation of construction costs was<<strong>br</strong> />
made on the basis of route structures and<<strong>br</strong> />
facilities (<strong>br</strong>idges, viaducts and tunnels,<<strong>br</strong> />
etc.) and price evaluation for these facilities.<<strong>br</strong> />
Price estimation (Table 7) was made<<strong>br</strong> />
on the basis of previously realized projects,<<strong>br</strong> />
respectively the market prices for<<strong>br</strong> />
this type of works. Unit prices for <strong>br</strong>idges<<strong>br</strong> />
are determined as the average prices based<<strong>br</strong> />
on individually determined prices for each<<strong>br</strong> />
<strong>br</strong>idge. Estimation the cost of works on<<strong>br</strong> />
tunnels was carried out on the basis of the<<strong>br</strong> />
average price 1 m of tunnel tube (for the<<strong>br</strong> />
left or right roadway depending on length,<<strong>br</strong> />
and the same was adopted for tunnels at<<strong>br</strong> />
high or low route).<<strong>br</strong> />
No 4, <strong>2011</strong>. 181<<strong>br</strong> />