The difference in computation between<<strong>br</strong> />
the calculation for various specific α values<<strong>br</strong> />
and the calculation where α appears as<<strong>br</strong> />
parameter occurring only in the calculation<<strong>br</strong> />
of Rz29 early completion.<<strong>br</strong> />
(in comparison the Hamming distance for:<<strong>br</strong> />
Rz28+ t29<<strong>br</strong> />
and Rz26 t29<<strong>br</strong> />
This is why a slight difference occurred<<strong>br</strong> />
for the project completion.<<strong>br</strong> />
Similar calculation will be deduced for<<strong>br</strong> />
the calculation of late completion of some<<strong>br</strong> />
activities, for calculation of time reserve,<<strong>br</strong> />
etc.<<strong>br</strong> />
+ )<<strong>br</strong> />
Fig. 4. Representation of possibility function π(t)<<strong>br</strong> />
Project completion obtained by means of α<<strong>br</strong> />
intersection where concrete values were<<strong>br</strong> />
not replaced<<strong>br</strong> />
The authors of the paper have determined<<strong>br</strong> />
the time of project reali<strong>za</strong>tion for<<strong>br</strong> />
the given example by probabilisticpossibilistic<<strong>br</strong> />
procedure according to [3].<<strong>br</strong> />
The difference of the two calculations is<<strong>br</strong> />
that when we apply the fuzzy number<<strong>br</strong> />
comparison method it is necessary to calculate<<strong>br</strong> />
the network layout only once after<<strong>br</strong> />
which the possibility function can be defined<<strong>br</strong> />
(Figure 4).<<strong>br</strong> />
When we calculate the possibility<<strong>br</strong> />
function using the probability-possibility<<strong>br</strong> />
probabilistic-possibilistic procedure, it is<<strong>br</strong> />
necessary to calculate the entire network<<strong>br</strong> />
layout several times for concrete α parameter<<strong>br</strong> />
values (α=0; 0,25; 0,50;<<strong>br</strong> />
0,75; 1,0). In other words, it is<<strong>br</strong> />
necessary to calculate the network layout<<strong>br</strong> />
for each α value twice, except for the value<<strong>br</strong> />
α=1, when it is necessary to calculate the<<strong>br</strong> />
network layout only once (Figure 5).<<strong>br</strong> />
Fig. 5 .Representation of possibiltiy function π(t)<<strong>br</strong> />
Project completion obtained by multiple<<strong>br</strong> />
calculation of network layout by means of α<<strong>br</strong> />
concrete values<<strong>br</strong> />
(α=0; α=0,25; α= 0,50; α= 0,75 ;α=1,0)<<strong>br</strong> />
CONCLUSION<<strong>br</strong> />
The procedure presented in the paper<<strong>br</strong> />
and the specific examples have illustrated<<strong>br</strong> />
the use of Possibility Theory in planning<<strong>br</strong> />
the time of facility completion. The possibility<<strong>br</strong> />
function of the project completion<<strong>br</strong> />
was determined for those respective activities<<strong>br</strong> />
of possibility function, which is known<<strong>br</strong> />
and represented by the appropriate αsections.<<strong>br</strong> />
This procedure can determine the<<strong>br</strong> />
possibility functions of execution the individual<<strong>br</strong> />
stages of the project. The fuzzy<<strong>br</strong> />
number comparison method, described in<<strong>br</strong> />
detail, was used in order to define the project<<strong>br</strong> />
completion possibility function. The<<strong>br</strong> />
illustrated example contained the total of<<strong>br</strong> />
30 general activities and the end result suggested<<strong>br</strong> />
that, compared with other methods,<<strong>br</strong> />
the authors used to apply, this procedure<<strong>br</strong> />
which offers the easiest way to the end result,<<strong>br</strong> />
particularly in the real cases<<strong>br</strong> />
when the number of activities exceeds considerably<<strong>br</strong> />
30. Establishing the data bases<<strong>br</strong> />
and their updating provides the full<<strong>br</strong> />
No 4, <strong>2011</strong>. 167<<strong>br</strong> />