18. Laying of external installations 13 15 18<<strong>br</strong> />

19. Assembly of the main roof beams (truss) 1 2 3<<strong>br</strong> />

20. Assembly of concrete facade elements 4 5 7<<strong>br</strong> />

21. Assembly of secondary roof beams 4 5 7<<strong>br</strong> />

22. Installation of vitrified facade joinery 6 8 10<<strong>br</strong> />

23. Assembly of crane-track support for <strong>br</strong>idge crane 3 4 5<<strong>br</strong> />

24. Assembly of roof covering and hall rain gutters 7 10 12<<strong>br</strong> />

25. Installation of skylights 2 3 4<<strong>br</strong> />

26. Laying of internal hall installations 10 11 12<<strong>br</strong> />

27. Assembly of <strong>br</strong>idge cranes 8 10 13<<strong>br</strong> />

28. Painting and decorating works in the hall 6 7 9<<strong>br</strong> />

29. Acceptance of the finished works on the facility 2 3 4<<strong>br</strong> />

30. Trial run 8 10 12<<strong>br</strong> />

Rz1 = t1<<strong>br</strong> />

[ ]<<strong>br</strong> />

Rz1 = α + 2;4−α<<strong>br</strong> />

Rz2 = Rz1+ t2<<strong>br</strong> />

Fig. 3. Network layout structure analysis<<strong>br</strong> />

[ ]<<strong>br</strong> />

t 2 = 2 α + 5;9 − 2α<<strong>br</strong> />

[ ]<<strong>br</strong> />

Rz2 = α + 2+ 2α + 5;4− α + 9−2α [ ]<<strong>br</strong> />

Rz2 = 3α + 7;13−3α No 4, <strong>2011</strong>. 164<<strong>br</strong> />

MINING ENGINEERING