Step 2<<strong>br</strong> />
If it is not possible to determine by<<strong>br</strong> />
step 1 if one fuzzy number is smaller or<<strong>br</strong> />
larger than the other, then we proceed to<<strong>br</strong> />
step 2. This step compares the scope values<<strong>br</strong> />
of both fuzzy numbers which are assigned<<strong>br</strong> />
the highest values of possibility<<strong>br</strong> />
distribution functions.<<strong>br</strong> />
Formally, step 2 is represented as follows:<<strong>br</strong> />
• max ( μ ( x ) )<<strong>br</strong> />
is the assigned<<strong>br</strong> />
M<<strong>br</strong> />
value of the fuzzy number<<strong>br</strong> />
*<<strong>br</strong> />
M scope which is denoted as x<<strong>br</strong> />
• assigned value of the fuzzy number<<strong>br</strong> />
*<<strong>br</strong> />
N scope which is denoted as x<<strong>br</strong> />
Now, it the two fuzzy numbers are given<<strong>br</strong> />
be M = { x, μ ( x),<<strong>br</strong> />
} and N = { y, μ ( y)<<strong>br</strong> />
} .<<strong>br</strong> />
M<<strong>br</strong> />
N<<strong>br</strong> />
Table 1. List of general activities with duration in days<<strong>br</strong> />
No. of activities in<<strong>br</strong> />
network layout<<strong>br</strong> />
M<<strong>br</strong> />
N<<strong>br</strong> />
It is considered that the fuzzy number M is<<strong>br</strong> />
smaller than the fuzzy number N if and<<strong>br</strong> />
* *<<strong>br</strong> />
only if the following is valid: x < x<<strong>br</strong> />
M N<<strong>br</strong> />
Step 3<<strong>br</strong> />
This step is performed when it is not<<strong>br</strong> />
possible to determine in the first two steps<<strong>br</strong> />
how much one fuzzy number is bigger or<<strong>br</strong> />
smaller than the other. In this step we<<strong>br</strong> />
compare the “bases” of fuzzy numbers.<<strong>br</strong> />
The term “base” determines a length of<<strong>br</strong> />
the fuzzy number basis.<<strong>br</strong> />
PRACTICAL USE THE FUZZY<<strong>br</strong> />
NUMBER COMPARISON METHOD<<strong>br</strong> />
There is a list of general activities with<<strong>br</strong> />
duration in days for an industrial hall (Table<<strong>br</strong> />
1) which includes the works on the<<strong>br</strong> />
construction site as well as the works on<<strong>br</strong> />
prefa<strong>br</strong>ication the assembling elements.<<strong>br</strong> />
Description of activities l m r<<strong>br</strong> />
1. Fulfilling the contract obligations towards the contractor 2 3 4<<strong>br</strong> />
2. Preliminary works (building of commercial construction site) 5 7 9<<strong>br</strong> />
3. Prefa<strong>br</strong>ication of concrete facade elements 24 30 35<<strong>br</strong> />
4. Prefa<strong>br</strong>ication of concrete columns and rain-water girders 14 16 18<<strong>br</strong> />
5. Removal of humus topsoil and location levelling 3 4 5<<strong>br</strong> />
6. Fa<strong>br</strong>ication of the main roof beams (truss) 7 10 12<<strong>br</strong> />
7. Construction of transport routes around the facility 9 12 14<<strong>br</strong> />
8. Spot footing pits excavation 1 2 3<<strong>br</strong> />
9. Fa<strong>br</strong>ication of secondary roof beams (purlins, <strong>br</strong>acings) 13 15 17<<strong>br</strong> />
10. Construction the base for hall floor plate 3 4 5<<strong>br</strong> />
11. Excavation of external installation ducts 3 4 5<<strong>br</strong> />
12. Making of transport route wearing course 1 2 3<<strong>br</strong> />
13. Concreting of spot footings and ground beams 8 10 12<<strong>br</strong> />
14. Transport and stockpiling of steel structure 1 3 4<<strong>br</strong> />
15. Erection of concrete columns and rain-water girders 2 3 4<<strong>br</strong> />
16. Construction of the hall floor slab with waterproofing 4 6 7<<strong>br</strong> />
17. Connecting the truss parts into a whole 1 2 3<<strong>br</strong> />
No 4, <strong>2011</strong>. 163<<strong>br</strong> />