24.02.2013 Views

Rudarski radovi br 4 2011 - Institut za rudarstvo i metalurgiju Bor

Rudarski radovi br 4 2011 - Institut za rudarstvo i metalurgiju Bor

Rudarski radovi br 4 2011 - Institut za rudarstvo i metalurgiju Bor

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Step 2<<strong>br</strong> />

If it is not possible to determine by<<strong>br</strong> />

step 1 if one fuzzy number is smaller or<<strong>br</strong> />

larger than the other, then we proceed to<<strong>br</strong> />

step 2. This step compares the scope values<<strong>br</strong> />

of both fuzzy numbers which are assigned<<strong>br</strong> />

the highest values of possibility<<strong>br</strong> />

distribution functions.<<strong>br</strong> />

Formally, step 2 is represented as follows:<<strong>br</strong> />

• max ( μ ( x ) )<<strong>br</strong> />

is the assigned<<strong>br</strong> />

M<<strong>br</strong> />

value of the fuzzy number<<strong>br</strong> />

*<<strong>br</strong> />

M scope which is denoted as x<<strong>br</strong> />

• assigned value of the fuzzy number<<strong>br</strong> />

*<<strong>br</strong> />

N scope which is denoted as x<<strong>br</strong> />

Now, it the two fuzzy numbers are given<<strong>br</strong> />

be M = { x, μ ( x),<<strong>br</strong> />

} and N = { y, μ ( y)<<strong>br</strong> />

} .<<strong>br</strong> />

M<<strong>br</strong> />

N<<strong>br</strong> />

Table 1. List of general activities with duration in days<<strong>br</strong> />

No. of activities in<<strong>br</strong> />

network layout<<strong>br</strong> />

M<<strong>br</strong> />

N<<strong>br</strong> />

It is considered that the fuzzy number M is<<strong>br</strong> />

smaller than the fuzzy number N if and<<strong>br</strong> />

* *<<strong>br</strong> />

only if the following is valid: x < x<<strong>br</strong> />

M N<<strong>br</strong> />

Step 3<<strong>br</strong> />

This step is performed when it is not<<strong>br</strong> />

possible to determine in the first two steps<<strong>br</strong> />

how much one fuzzy number is bigger or<<strong>br</strong> />

smaller than the other. In this step we<<strong>br</strong> />

compare the “bases” of fuzzy numbers.<<strong>br</strong> />

The term “base” determines a length of<<strong>br</strong> />

the fuzzy number basis.<<strong>br</strong> />

PRACTICAL USE THE FUZZY<<strong>br</strong> />

NUMBER COMPARISON METHOD<<strong>br</strong> />

There is a list of general activities with<<strong>br</strong> />

duration in days for an industrial hall (Table<<strong>br</strong> />

1) which includes the works on the<<strong>br</strong> />

construction site as well as the works on<<strong>br</strong> />

prefa<strong>br</strong>ication the assembling elements.<<strong>br</strong> />

Description of activities l m r<<strong>br</strong> />

1. Fulfilling the contract obligations towards the contractor 2 3 4<<strong>br</strong> />

2. Preliminary works (building of commercial construction site) 5 7 9<<strong>br</strong> />

3. Prefa<strong>br</strong>ication of concrete facade elements 24 30 35<<strong>br</strong> />

4. Prefa<strong>br</strong>ication of concrete columns and rain-water girders 14 16 18<<strong>br</strong> />

5. Removal of humus topsoil and location levelling 3 4 5<<strong>br</strong> />

6. Fa<strong>br</strong>ication of the main roof beams (truss) 7 10 12<<strong>br</strong> />

7. Construction of transport routes around the facility 9 12 14<<strong>br</strong> />

8. Spot footing pits excavation 1 2 3<<strong>br</strong> />

9. Fa<strong>br</strong>ication of secondary roof beams (purlins, <strong>br</strong>acings) 13 15 17<<strong>br</strong> />

10. Construction the base for hall floor plate 3 4 5<<strong>br</strong> />

11. Excavation of external installation ducts 3 4 5<<strong>br</strong> />

12. Making of transport route wearing course 1 2 3<<strong>br</strong> />

13. Concreting of spot footings and ground beams 8 10 12<<strong>br</strong> />

14. Transport and stockpiling of steel structure 1 3 4<<strong>br</strong> />

15. Erection of concrete columns and rain-water girders 2 3 4<<strong>br</strong> />

16. Construction of the hall floor slab with waterproofing 4 6 7<<strong>br</strong> />

17. Connecting the truss parts into a whole 1 2 3<<strong>br</strong> />

No 4, <strong>2011</strong>. 163<<strong>br</strong> />

MINING ENGINEERING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!