24.02.2013 Views

Rudarski radovi br 4 2011 - Institut za rudarstvo i metalurgiju Bor

Rudarski radovi br 4 2011 - Institut za rudarstvo i metalurgiju Bor

Rudarski radovi br 4 2011 - Institut za rudarstvo i metalurgiju Bor

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MINING AND METALLURGY INSTITUTE BOR YU ISSN: 1451-0162<<strong>br</strong> />

COMMITTEE OF UNDERGROUND EXPLOITATION OF THE MINERAL DEPOSITS UDK: 622<<strong>br</strong> />

UDK: 338.1:316.4:622(045)=20<<strong>br</strong> />

Radmilo Nikolic * , Nenad Vusovic * , Igor Svrkota * , Aleksandra Fedajev *<<strong>br</strong> />

BUSINESS ECONOMY OF RTB BOR IN TRANSITION PERIOD **<<strong>br</strong> />

Abstract<<strong>br</strong> />

RTB <strong>Bor</strong> is our known company for production of copper and precious metals. With a large<<strong>br</strong> />

number of employees, organized on a principle of production complex, it was a reputable business<<strong>br</strong> />

entity in the former Yugoslavia with a profitable business, especially in the area of export. At the<<strong>br</strong> />

same time, RTB was a backbone of economic development in the Timok region and beyond.<<strong>br</strong> />

In 90’s, the company fell into deep crisis due to a disintegration of the former Yugoslavia, civil<<strong>br</strong> />

wars in the neighborhood and tough economic sanctions by UN. It led to a drop of production,<<strong>br</strong> />

difficult export, reduced number of employees as well as their living standards. Investments were<<strong>br</strong> />

stopped and business losses became bigger and bigger.<<strong>br</strong> />

In order to improve the business efficiency, the company took several steps in its restructuring.<<strong>br</strong> />

Some down-stream factories were disported and only the base of copper production was kept. In<<strong>br</strong> />

the meantime, there were two attempts of company privati<strong>za</strong>tion, but both were unsuccessful, so<<strong>br</strong> />

the company is currently state-owned.<<strong>br</strong> />

Measures for improvement the company business economy are taken in the last couple of years.<<strong>br</strong> />

Some serious investments are in progress, such as reconstruction of the Smelter Plant and construction<<strong>br</strong> />

of the Sulfuric Acid Plant, procurement of mining equipment, infrastructural works, etc. Besides this,<<strong>br</strong> />

the production and export constantly increase and the company, after a long period of time, managed<<strong>br</strong> />

to finish 2010 with positive business results due to a favorable condition of the copper market.<<strong>br</strong> />

Key words: transition, economic crisis, restructuring, business economy<<strong>br</strong> />

INTRODUCTION<<strong>br</strong> />

Mining has a long tradition in the area<<strong>br</strong> />

of <strong>Bor</strong> and Majdanpek. First tones of copper<<strong>br</strong> />

ore were mined in 1903. It is a rich ore<<strong>br</strong> />

body Coka Dulkan. Namely, the first geological<<strong>br</strong> />

exploration of this area was carried<<strong>br</strong> />

out in 1897 in the area of Tilva Ros.<<strong>br</strong> />

RTB <strong>Bor</strong> was developed strongly after<<strong>br</strong> />

the World War II. During this period, several<<strong>br</strong> />

mines were opened along with<<strong>br</strong> />

processing and smelting plants. After years<<strong>br</strong> />

of growth, company became one of the largest<<strong>br</strong> />

producers of high quality cathode copper<<strong>br</strong> />

with over 20,000 employees.<<strong>br</strong> />

A review of the current situation of internal<<strong>br</strong> />

organi<strong>za</strong>tion is undergone. It aims to find<<strong>br</strong> />

an organi<strong>za</strong>tion model that will be based on<<strong>br</strong> />

the market principles and provide higher efficiency<<strong>br</strong> />

and profitability of the business.<<strong>br</strong> />

* University of Belgrade, Technical Faculty <strong>Bor</strong><<strong>br</strong> />

** This paper is the result of Project No. 33038, “Eksploitation and processing of copper ore technology<<strong>br</strong> />

development with monitoring of living and working enviroment in the RTB <strong>Bor</strong><<strong>br</strong> />

Group”, funded by the Ministry of Education and Science of the Republic of Serbia.<<strong>br</strong> />

No 4, <strong>2011</strong>. 139<<strong>br</strong> />

MINING ENGINEERING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!