Fig. 3. Technological scheme of laboratory process for smelter slag granulation<<strong>br</strong> />

4. PROCESS OF SLAG<<strong>br</strong> />

GRANULATION<<strong>br</strong> />

For laboratory experiment, the slag<<strong>br</strong> />

was used which was taken from the crushing<<strong>br</strong> />

plant from conveyor belt, before the<<strong>br</strong> />

tertiary crushing process. Slag was exposed<<strong>br</strong> />

to the weather conditions on a<<strong>br</strong> />

dump, so it contained the certain amount<<strong>br</strong> />

of moisture why it was pre-dried at room<<strong>br</strong> />

temperature. For characteri<strong>za</strong>tion of taken<<strong>br</strong> />

sample, the chemical analysis of slag was<<strong>br</strong> />

carried out and shown in Table 1.<<strong>br</strong> />

Table 1: Chemical composition of starting slag<<strong>br</strong> />

Compound–<<strong>br</strong> />

chemical element<<strong>br</strong> />

Cu Fe3O4 CaO S Fe FeO SiO2 Al2O3<<strong>br</strong> />

Content [%] 0.68 1.754 17.26 1.07 25.69 26.75 43.76 3.89<<strong>br</strong> />

Slag was then subjected to smelting in a<<strong>br</strong> />

laboratory induction furnace, power of 100<<strong>br</strong> />

kWh, in a pot, volume V = 10 l, ELING –<<strong>br</strong> />

Loznica manufacturer. The granulation was<<strong>br</strong> />

carried out in the laboratory conditions in a<<strong>br</strong> />

pot for slag cooling. During the experiment,<<strong>br</strong> />

25 kg of slag was melted and the temperature<<strong>br</strong> />

of slag pouring was t=1250 o C. Temperature<<strong>br</strong> />

measurement was performed by the<<strong>br</strong> />

slag immersion pyrometer.<<strong>br</strong> />

In this way, the primary sample of<<strong>br</strong> />

granulated slag was obtained where further<<strong>br</strong> />

investigation of grain-size distribution,<<strong>br</strong> />

chemical composition, etc. was conducted.<<strong>br</strong> />

So, in the laboratory conditions, a<<strong>br</strong> />

possibility of smelter slag granulation was<<strong>br</strong> />

confirmed and the preconditions were<<strong>br</strong> />

formed for construction of laboratory device<<strong>br</strong> />

for granulation. This new laboratory<<strong>br</strong> />

device should provide, as the first:<<strong>br</strong> />

No 4, <strong>2011</strong>. 103<<strong>br</strong> />

MINING ENGINEERING