CONTENT OF THE SIMPLIFIED<br />
MINING PROJECT<br />
Taking a technological sample have to<br />
be provided by the project of investigation,<br />
where their basic elements are also<br />
given – spatial position of testing bench,<br />
amounts that are mined as well as laboratory<br />
and other analyses to be done. Simplified<br />
Mining Project in accordance with<br />
the Article 43 of the Regulation on contents<br />
of mining projects (“Official Gazette<br />
of RS No. 27/97) contains the following<br />
parts:<br />
1. Project task with the consent of<br />
investors and appropriate bases for<br />
design,<br />
2. Technical solution with location<br />
data,<br />
3. Technical description on method of<br />
test bench development,<br />
4. Energy solution,<br />
5. Bill of quantities and calculation,<br />
6. Drawings and plans at the appropriate<br />
scale,<br />
7. Special protective measures.<br />
Project task should provide the basic<br />
guidelines and content of the project and<br />
the investor confirms the agreement<br />
signed by the responsible person and<br />
stamp of the company. Technical solution<br />
provides a description of sampling technology,<br />
prescribed quantity for sampling<br />
and the exact spatial position of test<br />
bench. Technical description has to show<br />
the technological process with all parameters<br />
of technological process of taking<br />
minerals, necessary to secure anticipated<br />
amount set aside from the massif. In the<br />
absence of basic parameters for design (in<br />
the first place of engineering- geological<br />
environmental conditions), it is required to<br />
limit the test bench itself to the lower<br />
heights (3 to 5m) in order to avoid possible<br />
uncontrolled landslides and sliding mass.<br />
Ministry of Mines and Energy issued<br />
the consent on defining the quantity of<br />
mineral raw material to the project that<br />
could be exploited and have to be within<br />
the prescribed limits by the act of Ministry.<br />
Validity of this solution coincides<br />
with the period of validity that is defined<br />
by the basic solution of geological prospecting<br />
works at this locality.<br />
The results obtained by the analyses of<br />
technological samples are shown in the<br />
project report on reserves of mineral raw<br />
materials.<br />
CONCLUSION<br />
Technological sampling and analyzing<br />
of technological efficiency is an important<br />
criterion, among others, for balancing the<br />
reserves of mineral raw materials.<br />
As we have seen, in recent years there<br />
has been intensification of mining in terms<br />
of technological tests in the locality. The<br />
exposed movements show that recovery<br />
came gradually in terms of higher demand<br />
for construction material.<br />
The movement of required approvals<br />
also presents not only a good indicator of<br />
interested investor in this type of investigation<br />
and for certain investments in this<br />
field of industry, but its very high sensitivity<br />
to the economic trends.<br />
For further analyses of this type, the<br />
comparative analyses of the obtained geological<br />
prospecting and analyses of SMP<br />
could be sued in future work as well as<br />
their comparison with a specific location,<br />
i.e. municipality. Also a comparison with<br />
the certified mineral raw materials in the<br />
same localities and their usage could give<br />
very interesting data.<br />
No 1,2010. 11<br />