24.02.2013 Views

Institut za rudarstvo i metalurgiju Bor

Institut za rudarstvo i metalurgiju Bor

Institut za rudarstvo i metalurgiju Bor

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

area is constantly increased. Figure 1<br />

gives the percentage representation of the<br />

SMP for technological samples within the<br />

30%<br />

25%<br />

20%<br />

15%<br />

10%<br />

5%<br />

0%<br />

prospecting works regarding the total<br />

number of approvals for the SMP for the<br />

certain year.<br />

2003 2004 2005 2006 2007 2008 2009<br />

A constant increase in the number of<br />

approvals can be seen on a diagram can be<br />

seen on a diagram with the exception of<br />

2004, where there was a small decline. The<br />

largest volume of investments in this type<br />

of investigations was in 2008, while their<br />

fall in 2009 can be explained by the<br />

Procentualni sadržaj URP po godinama<br />

Figure 1. The percentage content of the SMP per year<br />

socalled “economic crisis” and reduced volume<br />

of prospecting works in the country.<br />

Figure 2 presents a diagram of distribution<br />

the mineral raw materials for which the<br />

approvals for SMP were given for taking<br />

the technological samples during prospecting<br />

works for the period 2003 – 2009.<br />

No 1,2010. 9<br />

MINING ENGINEERING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!