Institut za rudarstvo i metalurgiju Bor
Institut za rudarstvo i metalurgiju Bor
Institut za rudarstvo i metalurgiju Bor
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
COMMITTEE OF UNDERGROUND EXPLOITATION OF YU ISSN: 1451-0162<br />
THE MINERAL DEPOSITS UDK: 622<br />
UDK: 550.8(045)=20<br />
Dejan Sokolović * , Dragana Erdeljan * , Petar Popović *<br />
TERMS AND METHOD OF SAMPLING FOR TECHNOLOGICAL<br />
SAMPLE IN DETAILED GEOLOGICAL PROSPECTING WORKS<br />
Abstract<br />
The Ministry of Mining and Energy (MME), as the competent ministry, in accordance with the<br />
Law on mining (''Official Gazette RS'' No. 44/95 and 34/08), issued the consent for taking samples<br />
for technology probe on the approved area of geological exploration. This paper presents the<br />
conditions for issuing permits for sampling the mineral raw materials for analyzing the technical<br />
and technological characteristics during the exploration works, the amount that can be taken as a<br />
technological sample, and analyses of compliances issued per years. The period of realized analyses<br />
is from 2003-2009.<br />
Key words: Ministry of Mining and Energy, simplified mining project, technological testing<br />
INTRODUCTION<br />
Addressing the requirements of companies<br />
interested in detailed geological<br />
investigations, the Ministry of Mining and<br />
Energy issued the approvals for execution<br />
the mining works for the aim of technological<br />
sampling. During reali<strong>za</strong>tion the<br />
detailed geological investigations, the<br />
works of technological sampling for industrial<br />
and semi- industrial testing are also<br />
provided. It is necessary to develop the<br />
Simplified Mining Project (SMP) for the<br />
works on technological sampling. This<br />
project specifies the quantity and technology<br />
of obtaining the raw materials.<br />
The taken period for review the previous<br />
approvals is from 2003 ending with<br />
2009. For the period before 2003, the data<br />
available to the MME are not reliable. In<br />
fact, since 2002 the all the documentation<br />
* Ministry of Mining and Energy<br />
has been recorded in a digital form and the<br />
data properly stored in the archive, while<br />
for the period before 2002, the track of<br />
documentation is harder or, for various<br />
reasons, it is unavailable.<br />
The approved quantities of material<br />
that should be taken as a technological<br />
sample are various and depend on the type<br />
of tested mineral raw material and its industrial<br />
use. Quantities also depend on the<br />
way of investigation the technological raw<br />
material; therefore it was necessary to determine<br />
accurately the required quantity of<br />
mineral raw material for implementation<br />
the technological investigations. MME has<br />
defined the exact quantities that are processed<br />
by the Simplified Mining Project<br />
and they are presented in Table 1.<br />
No 1,2010. 7<br />
MINING ENGINEERING