24.02.2013 Views

Institut za rudarstvo i metalurgiju Bor

Institut za rudarstvo i metalurgiju Bor

Institut za rudarstvo i metalurgiju Bor

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

COMMITTEE OF UNDERGROUND EXPLOITATION OF YU ISSN: 1451-0162<br />

THE MINERAL DEPOSITS UDK: 622<br />

UDK: 550.8(045)=20<br />

Dejan Sokolović * , Dragana Erdeljan * , Petar Popović *<br />

TERMS AND METHOD OF SAMPLING FOR TECHNOLOGICAL<br />

SAMPLE IN DETAILED GEOLOGICAL PROSPECTING WORKS<br />

Abstract<br />

The Ministry of Mining and Energy (MME), as the competent ministry, in accordance with the<br />

Law on mining (''Official Gazette RS'' No. 44/95 and 34/08), issued the consent for taking samples<br />

for technology probe on the approved area of geological exploration. This paper presents the<br />

conditions for issuing permits for sampling the mineral raw materials for analyzing the technical<br />

and technological characteristics during the exploration works, the amount that can be taken as a<br />

technological sample, and analyses of compliances issued per years. The period of realized analyses<br />

is from 2003-2009.<br />

Key words: Ministry of Mining and Energy, simplified mining project, technological testing<br />

INTRODUCTION<br />

Addressing the requirements of companies<br />

interested in detailed geological<br />

investigations, the Ministry of Mining and<br />

Energy issued the approvals for execution<br />

the mining works for the aim of technological<br />

sampling. During reali<strong>za</strong>tion the<br />

detailed geological investigations, the<br />

works of technological sampling for industrial<br />

and semi- industrial testing are also<br />

provided. It is necessary to develop the<br />

Simplified Mining Project (SMP) for the<br />

works on technological sampling. This<br />

project specifies the quantity and technology<br />

of obtaining the raw materials.<br />

The taken period for review the previous<br />

approvals is from 2003 ending with<br />

2009. For the period before 2003, the data<br />

available to the MME are not reliable. In<br />

fact, since 2002 the all the documentation<br />

* Ministry of Mining and Energy<br />

has been recorded in a digital form and the<br />

data properly stored in the archive, while<br />

for the period before 2002, the track of<br />

documentation is harder or, for various<br />

reasons, it is unavailable.<br />

The approved quantities of material<br />

that should be taken as a technological<br />

sample are various and depend on the type<br />

of tested mineral raw material and its industrial<br />

use. Quantities also depend on the<br />

way of investigation the technological raw<br />

material; therefore it was necessary to determine<br />

accurately the required quantity of<br />

mineral raw material for implementation<br />

the technological investigations. MME has<br />

defined the exact quantities that are processed<br />

by the Simplified Mining Project<br />

and they are presented in Table 1.<br />

No 1,2010. 7<br />

MINING ENGINEERING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!