c. The Certificate of Service Acceptance must be issued and signed by both the Contractor and the<br />

Contracting Authority after the serviced vehicle has been delivered back to the EULEX facilities.<br />

Article 32 Warranty<br />

32.1 The Contractor shall warrant that the supplies are new, unused, of the most recent models and<br />

incorporate all recent improvements in design and materials. The Contractor shall further warrant<br />

that none of the supplies have any defect arising from design, materials or workmanship. This<br />

warranty shall remain valid for 1 (one) year after provisional acceptance except for lot 5 and lot 6<br />

which is 6 (six) months after provisional acceptance.<br />

32.2 The commercial warranty as shown in the technical offer must be valid for 1 (one) year after<br />

provisional acceptance except for lot 5 and lot 6 which is 6 (six) months after provisional<br />

acceptance.<br />

Article 36 - Termination by the Contracting Authority<br />

1. The framework contract is of two years duration starting from its signature by both parties. In<br />

addition to the grounds for termination defined in the General Conditions, the Contracting<br />

Authority may terminate the contract after giving 30 days' notice to the Contractor, in case<br />

EULEX’s mandate was not to be prolonged and/or in case of budgetary issues affecting the<br />

financing of the project.<br />

2. In case of termination of the framework contract on such grounds, the Contractor shall NOT be<br />

entitled to claim any indemnity for loss suffered.<br />

3. The Contractor shall only be entitled to claim for sums owing to it for supplies already delivered<br />

and/or for supplies pending delivery following the receipt by the Contractor (before the date of<br />

notification of the termination of the framework contract) of a valid purchase order issued by the<br />

Contracting Authority.<br />

Article 40 Settlement of disputes<br />

40.1 Any disputes arising out of or relating to this contract which cannot be settled otherwise shall be<br />

referred to the exclusive jurisdiction of the Courts of Brussels (Belgium) , applying the Belgian<br />

Law.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!