25.2. All service and repair work must be approved by a EULEX Quality Control (QC) Inspector. Any<br />

unsatisfactory work as identified by the EULEX QC will be rectified by the Contractor at its own<br />

expenses.<br />

25.3. The Certificate of Provisional Acceptance must be issued and signed by both the contractor and<br />

the Contracting Authority after delivery of the spare parts to EULEX Transport HQ.<br />

25.4. For lots 1, 2, 3 and 4 EULEX has the right to independently test the spare parts provided by the<br />

contractor to ascertain they are vehicle’s Genuine Manufacturer’s parts and materails. For lots 5<br />

and 6, in case vehicle’s genuine manufacturer’s parts and materials are not available (e.g. for old<br />

dated vehicles), the contractor shall inform the project manager who may agree upon equivalent<br />

high standard parts as OEm (Original Equipment Manufacturer) to be installed, followed by a<br />

review and approval from EULEX technical experts. If an independent test reveals these<br />

standards are not met, EULEX has the right to request the removal of such spare-part and have<br />

them replaced at no cost to EULEX, including any transportation or handling costs.<br />

Article 26 Methods of payment<br />

26.1. Payments shall be made in EUROS.<br />

26.2. Payments shall be authorised and made by the Contracting Authority.<br />

26.3. No pre-financing payments shall be made.<br />

26.4. Request for payments shall only be made on the basis of the amount value of a valid Purchase<br />

Order issued by the contracting authority.<br />

26.5. In order to obtain payments, the Contractor must forward to the authority referred to in paragraph<br />

26.1 above, (in addition to the performance guarantee), the invoice(s) in triplicate following<br />

provisional acceptance of the supplies and/or ancillary services.<br />

26.6. Invoices will be paid on a monthly basis in arrears of the work being completed. Invoices should<br />

be submitted by the 5th of the following month. Each monthly bill should include the discount<br />

percentage from the Manufacturer’s price list as offered in the contract by the Contractor.<br />

26.7. Invoicing.<br />

i. All invoicing must include original and copy along with the purchase order number and all<br />

relevant back up paperwork.<br />

ii. Invoices shall clearly separate the spare parts from the Labour cost and must include (as applicable):<br />

� The complete list of parts that have been replaced<br />

� The cost of these parts, in accordance with the terms of article 3.1. of the draft framework<br />

contract, including the discount specified in the financial offer (annex II and III).<br />

� The total cost of labour.<br />

� Any other charges for services performed.<br />

� The cost of the pick up and drop off shall NOT be mentioned as a cost on the invoice, neither<br />

added to the number of hours of labor. I.e. the estimated unit-cost for the pick up and drop off<br />

shall be deemed to have been estimated by the contractor at the time of the submission of its<br />

financial offer and integrated into its financial proposals related to the unit price for the working<br />

hours, and/or for the spare parts.