22.02.2013 Views

Tsitsikamma Community Wind Farm Project - Nersa

Tsitsikamma Community Wind Farm Project - Nersa

Tsitsikamma Community Wind Farm Project - Nersa

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Tsitsikamma</strong><br />

<strong>Community</strong> <strong>Wind</strong><br />

<strong>Farm</strong> <strong>Project</strong><br />

NERSA Generation<br />

License Public<br />

Hearing.<br />

14 August 2012.


Agenda.<br />

• Introduction to Cennergi<br />

• <strong>Tsitsikamma</strong> <strong>Community</strong> <strong>Wind</strong> <strong>Farm</strong><br />

<strong>Project</strong><br />

– <strong>Project</strong> Overview<br />

– <strong>Project</strong> Location<br />

– Environmental Consent<br />

– Economic Development<br />

– <strong>Community</strong> Trusts<br />

• Questions


Cennergi aims to be the leading cleaner energy producer in Southern Africa.<br />

3<br />

Our VISION is to become the leading cleaner<br />

energy Independent Power Producer in<br />

Southern Africa, serving an expanding energy<br />

market<br />

+ =<br />

– a significant share of a planned<br />

16 GW by 2025<br />

Energy is<br />

everywhere.


Agenda.<br />

• Introduction to Cennergi<br />

• <strong>Tsitsikamma</strong> <strong>Community</strong> wind farm<br />

– <strong>Project</strong> Overview<br />

– <strong>Project</strong> Location<br />

– Environmental Consent<br />

– Economic Development<br />

– <strong>Community</strong> Trusts<br />

• Questions


<strong>Tsitsikamma</strong> community wind farm.<br />

• Technology: Onshore <strong>Wind</strong><br />

• Capacity: 95MW (31 wind turbines)<br />

• Location: Wittekleibosch <strong>Farm</strong> 787,<br />

<strong>Tsitsikamma</strong> Region, Eastern Cape<br />

• Substation: Melkhout (via Dieprivier)<br />

• <strong>Project</strong> Structure:<br />

75% Cennergi (Pty) Ltd,<br />

16% Watt Energy<br />

<strong>Project</strong> overview<br />

9% <strong>Tsitsikamma</strong> <strong>Community</strong> Trust<br />

• EPC and O&M Contractor<br />

Vestas Southern Africa<br />

• MLA: Nedbank Limited<br />

• Expected life of project: 20 years


Agenda.<br />

• Introduction to Cennergi<br />

• <strong>Tsitsikamma</strong> <strong>Community</strong> <strong>Wind</strong> <strong>Farm</strong><br />

– <strong>Project</strong> Overview<br />

– <strong>Project</strong> Location<br />

– Environmental Consent<br />

– Economic Development<br />

– <strong>Community</strong> Trusts<br />

• Questions


7<br />

<strong>Tsitsikamma</strong> <strong>Project</strong> Location


8<br />

<strong>Tsitsikamma</strong> <strong>Project</strong> Location<br />

• Located approximately 120 km northeast<br />

of Port Elizabeth on Portions 3 – 9<br />

of the <strong>Farm</strong> Wittekleibosch<br />

• The <strong>Project</strong> is being developed by a<br />

<strong>Project</strong> Consortium consisting of<br />

Cennergi, Watt Energy and the<br />

<strong>Tsitsikamma</strong> Development Trust<br />

• Construction Start Date – Q1 2013<br />

8


Agenda.<br />

• Introduction to Cennergi<br />

• <strong>Tsitsikamma</strong> <strong>Community</strong> wind farm<br />

– <strong>Project</strong> Overview<br />

– <strong>Project</strong> Location<br />

– Environmental Consent<br />

– Economic Development<br />

– <strong>Community</strong> Trusts<br />

• Questions


10<br />

Permitting milestones achieved<br />

Environmental Consent Details<br />

Environmental Authorization<br />

(<strong>Wind</strong> Monitoring Masts)<br />

Date: 1 st March 2011<br />

Civil Aviation Authority Consent Date: 15 April 2011<br />

Water Use License Submitted<br />

Rezoning Submitted<br />

Local Authority Consents Submitted<br />

Heritage Permits Date: 15 th December 2011<br />

Civil Aviation Consent Date: 14 th November 2011<br />

�<br />

�<br />

�<br />

�<br />

�<br />

�<br />


Agenda.<br />

• Introduction to Cennergi<br />

• <strong>Tsitsikamma</strong> <strong>Community</strong> wind farm<br />

– <strong>Project</strong> Overview<br />

– <strong>Project</strong> Location<br />

– Environmental Consent<br />

– Economic Development<br />

– <strong>Community</strong> Trusts<br />

• Questions


12<br />

Economic Development<br />

Component Status<br />

Direct Empowerment Black Ownership<br />

Black Management<br />

Black Female Management<br />

Human Resource Development Black Skilled Personnel<br />

Skills Development Programs<br />

Employment Equity<br />

Procurement from BEE Suppliers<br />

Enterprise Development<br />

Fostering rural development and<br />

involving communities<br />

�<br />

�<br />

�<br />

� �<br />

�<br />

�<br />

�<br />


Social and economic development.<br />

• With expertise, resolve and resources we strive to create benefit for all<br />

People<br />

Economy<br />

Environment<br />

Shareholders<br />

• Cennergi, making a positive difference in the communities we work with


Agenda.<br />

• Introduction to Cennergi<br />

• <strong>Tsitsikamma</strong> <strong>Community</strong> wind farm<br />

– <strong>Project</strong> Overview<br />

– <strong>Project</strong> Location<br />

– Environmental Consent<br />

– Economic Development<br />

– <strong>Community</strong> Trusts<br />

• Questions


15<br />

<strong>Community</strong> Trusts<br />

The <strong>Tsitsikamma</strong> Development Trust (“TDT”) was established in<br />

2006 as a mechanism to assist with the land distribution and<br />

development of the Amamfengu community who reside within a<br />

50km radius of the project site.<br />

A Bewind Trust has been created with the following principle<br />

objectives:<br />

• To act as the legal and commercial trading agent of the TDT;<br />

• As a 9% equity shareholder (of which 2.5% is free carry) in TCWF the TDT will receive<br />

income through dividend pay-outs once the wind farm is fully operational and revenue<br />

generating;<br />

• The dividends will be used to fund initiatives identified by registered beneficiaries.<br />

These initiatives will positively impact the socio-economic status of the Amamfengu<br />

community respectively, particularly with regards to land development and housing as<br />

stated in the TDT Trust Deed


Thank you<br />

• Introduction to Cennergi<br />

• <strong>Tsitsikamma</strong> <strong>Community</strong> wind farm<br />

– Introduction<br />

– <strong>Project</strong> Location<br />

– <strong>Project</strong> Overview<br />

– Environmental Consent<br />

– Economic Development<br />

– <strong>Community</strong> Trusts<br />

• Questions

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!