Barriers to the Deployment of <strong>District</strong> <strong>Heating</strong><br />

<strong>Biomass</strong> <strong>District</strong> <strong>Heating</strong><br />

The Good, the Bad and the Ugly.<br />

13.11.12 Lessons from the Past 1


Barriers to the Deployment of <strong>District</strong> <strong>Heating</strong><br />

Outline<br />

• Comments focus on <strong>Biomass</strong> DH systems in social housing projects<br />

• Examine 3 Case Studies of HA projects in the Highlands and Islands ie.<br />

Shore St. Campbeltown, Lynn Rd. Kirkwall and Ross Cr. <strong>Lochgilphead</strong><br />

• Problems can abound in key areas such as<br />

Project Facilitation / <strong>Heating</strong> Equip. / Fuel Supply Chain / O and M<br />

• Consider a Tool that links these key areas as an integrated process<br />

• Conclusions and Lessons to be Learned<br />

13.11.12 Lessons from the Past 2


Barriers to the Deployment of <strong>District</strong> <strong>Heating</strong><br />

Campbeltown <strong>Biomass</strong> <strong>District</strong> <strong>Heating</strong>…………………..Gone<br />

• Fyne Homes 2004 development of block of 14 flats<br />

• Capital cost of £124,500 ( SCHRI grant of £70,600)<br />

• 100kw Talbott biomass boiler, with 16 M3 chip store &<br />

fuel feed system, plus 100kw gas back-up boiler<br />

• Woodchip supply coming from waste slab-wood from<br />

local sawmill. Delivered in 1.5 M3 bulk bags.<br />

Problems found<br />

• Estimate of heat demand from houses too high<br />

• <strong>Biomass</strong> boiler was oversized,<br />

• <strong>Biomass</strong> boiler would not modulate for low demand<br />

• Kept going out needing on-site contractor visit to relight<br />

• Fuel store was not weatherproof. Rain ran in through<br />

roof loading hatches, and saturated woodfuel in hopper.<br />

• System ran 95% on gas back-up boiler<br />

• <strong>Biomass</strong> system removed completely in 2009<br />

13.11.12 Lessons from the Past 3


Barriers to the Deployment of <strong>District</strong> <strong>Heating</strong><br />

Orkney <strong>Biomass</strong> <strong>District</strong> <strong>Heating</strong>………………….……..Gone<br />

• Orkney HA 2003 development of 40 houses.<br />

• 350 kw LAKA biomass boiler, with 16 M3 chip store &<br />

underground chip blower, plus 250 kw oil back-up boiler<br />

• No trees or commercial forestry available on Orkney so<br />

chip supply coming from timber pallets shredded by<br />

Council, plus pilot scheme for SRC back-up supply.<br />

Problems found<br />

• Designer/ESCo folded before project completion.<br />

• Major problems with fuel supply – fuel very poor quality –<br />

caused regular blockages in augers ,stopping boiler.<br />

Nails etc. from pallets cause damage in boiler grate.<br />

• After 3 – 4 years major leaks from DH network. All u/g<br />

joints faulty as MS bolts used rather than SS bolts.<br />

• 240 new joints fitted costing approx. £40,000<br />

• <strong>Biomass</strong> system removed completely in 2010<br />

13.11.12 Lessons from the Past 4


Barriers to the Deployment of <strong>District</strong> <strong>Heating</strong><br />

<strong>Lochgilphead</strong> <strong>Biomass</strong> <strong>District</strong> <strong>Heating</strong>………………….Still Going<br />

• Fyne Homes HA 2002 development of 51 houses.<br />

• Designed, installed, plus O & M by Torren Energy ESCo.<br />

• 460 kw LAKA biomass boiler, with 35 M3 chip store &<br />

ground level chip blower, plus 300kw oil back-up boiler<br />

• Woodfuel supply & delivery from Our Power, Cairndow<br />

• Wins best project @ 2003 Scottish Green Energy Awards.<br />

Problems found<br />

• Torren Energy ESCo folded just after project completion.<br />

• No woodfuel supply for 8 months – running on oil boiler –<br />

Vital Energi agrees to support system as an ESCo, but<br />

with certain risks and costs transfer to Fyne Homes HA.<br />

• New smart card pre-payment system needed for tenants<br />

• 2006 – Disaster! Network now leaking up to 9.000<br />

litres/day. Joints faulty as MS bolts used and not SS bolts.<br />

360 new joints and new circuit valves fitted.<br />

13.11.12 Lessons from the Past 5


Barriers to the Deployment of <strong>District</strong> <strong>Heating</strong><br />

Design Considerations………Pieces of the <strong>District</strong> <strong>Heating</strong> Jigsaw<br />

Project Facilitation<br />

• Promotion and awareness raising (Demonstration site visits)<br />

• Technical Advice<br />

• Feasibility Studies<br />

• Funding and Financing<br />

<strong>Heating</strong> Equipment • Project Manager<br />

• Architect, Scheme design (Mechanical & Electrical)<br />

• Boilerhouse/Storage facility builder or manufacture<br />

• Boiler importers and manufacturers (plus ancilliary equipment)<br />

• Specialist installation teams (eg. DH network, HIU installers)<br />

Fuel Supply<br />

Operation and<br />

Maintenance<br />

• Forestry/Woodland/sawmill/farm/wood recovery/pellet makers<br />

• Fuel processing (chipping, drying, pelletising)<br />

• Bulk transport<br />

• Bulk storage<br />

• Local delivery<br />

• Metering and Billing<br />

• Annual Servicing<br />

• Parts, Supply and Troubleshooting<br />

• On- site maintenance<br />

13.11.12 Lessons from the Past 6


Barriers to the Deployment of <strong>District</strong> <strong>Heating</strong><br />

Design Considerations<br />

Fitting the Pieces of<br />

the Jigsaw together<br />

Publication –<br />

Woodfuel for Warmth<br />

Report on the issues surrounding the<br />

use of woodfuel for heat in Scotland<br />

Source -<br />

Sustainable Dev. Commission<br />

www.sd-commission.org.uk.<br />

13.11.12 Lessons from the Past 7


Barriers to the Deployment of <strong>District</strong> <strong>Heating</strong><br />

Some Conclusions<br />

• Woodfuel supply chain is still sparse & entails high transport cost<br />

• Issues if moisture cont. is high - emissions, low temp. chip removal<br />

• Need to improve supply chain infrastructure – storage & drying<br />

• Boiler spec should reflect quality of local biomass supply.<br />

• Poor design – the sum may not be as good as the parts<br />

• Evaluate existing installations to see what works. (and what doesn’t !)<br />

• Despite these caveats the future for biomass community energy is<br />

Beginning to burn a little brighter…… brighter……..<br />

..<br />

FIRE<br />

…but but yet to set SCOTLAND on FIRE<br />

13.11.12 Lessons from the Past 8


Barriers to the Deployment of <strong>District</strong> <strong>Heating</strong><br />

THANK<br />

S<br />

FOLKS<br />

13.11.12 Lessons from the Past 9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!