Master Plan Summary - Aerodrom Ljubljana
Master Plan Summary - Aerodrom Ljubljana
Master Plan Summary - Aerodrom Ljubljana
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Retail Outlet<br />
• Optimal position for a supermarket at the exit to the main airport road.<br />
• Passengers as well as meeters and greeters leaving the airport would pass by the<br />
outlet.<br />
• Employees working in the passenger terminals or within the airport technical zone<br />
could reach the supermarket within walking distance.<br />
• Development of the retail outlet is recommended in two phases starting with<br />
approximately 1,000 sqm sales area in 2015 and another 1,000 sqm sales area<br />
Hotel<br />
in 2023.<br />
• Construction of a 3*+ - 4* hotel building in front of new multi-story car park with<br />
assumed opening in 2015.<br />
• Covered walkway to Terminal 2 and link to the car park provide hotel guests with a<br />
convenient and short connection to these facilities.<br />
• To diversify the hotel offer at the airport a budget hotel has been planned (opening in<br />
2020) in wider geographical distance from the passenger terminal than the 3*+ - 4*<br />
hotel.<br />
Business Center<br />
• Location provides a fast access to Gorenjska motorway via the main airport road.<br />
• Passenger terminal facilities are reachable within walking distance.<br />
• To stimulate the market demand openings of buildings A and B are planned already<br />
in 2015 and 2017.<br />
• Buildings C and D would follow in 2021 and 2026 and building E in 2031.<br />
44 45