AIRPORT DEvELOPMENT CONCEPT (2040)<br />

8Key Components<br />

of the LJU<br />

<strong>Master</strong> <strong>Plan</strong><br />

Runway<br />

• The existing runway is sufficient to handle the traffic of up to 35 movements per<br />

peak hour during the planning horizon.<br />

Taxiways<br />

• Construction of Taxiway shoulders according to ICAO recommendations for code E<br />

in Phase 3.<br />

• Connecting taxiway between passenger apron and maintenance apron.<br />

• Additional connecting taxiways to the new apron areas.<br />

• Redesign of Taxiway G to a regular Rapid Exit Taxiway.<br />

Apron<br />

• Expansion of the passenger apron in north-west direction.<br />

• Expansion of the maintenance apron at the maintenance hangars.<br />

• Development of a new cargo apron south of the military<br />

and police area.<br />

• Development of a new Business / General Aviation apron<br />

at the south-east end of the airport.<br />