AIRPORT DEvELOPMENT CONCEPT (2040)<br />
8Key Components<br />
of the LJU<br />
<strong>Master</strong> <strong>Plan</strong><br />
Runway<br />
• The existing runway is sufficient to handle the traffic of up to 35 movements per<br />
peak hour during the planning horizon.<br />
Taxiways<br />
• Construction of Taxiway shoulders according to ICAO recommendations for code E<br />
in Phase 3.<br />
• Connecting taxiway between passenger apron and maintenance apron.<br />
• Additional connecting taxiways to the new apron areas.<br />
• Redesign of Taxiway G to a regular Rapid Exit Taxiway.<br />
Apron<br />
• Expansion of the passenger apron in north-west direction.<br />
• Expansion of the maintenance apron at the maintenance hangars.<br />
• Development of a new cargo apron south of the military<br />
and police area.<br />
• Development of a new Business / General Aviation apron<br />
at the south-east end of the airport.<br />
38 39