Annual report 2006-2007 - Taranaki Regional Council
Annual report 2006-2007 - Taranaki Regional Council
Annual report 2006-2007 - Taranaki Regional Council
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
85<br />
8.6.2 Environmental effects of exercise of consents<br />
No chemical sampling of stormwater discharges from the site was carried out in the<br />
monitoring period under review.<br />
Receiving water quality and biological monitoring detected no adverse effects on the<br />
tributary or Kahouri Stream as a result of the discharge of stormwater from the site<br />
during the low flow survey of the Kahouri Stream catchment.<br />
8.6.3 Evaluation of performance<br />
A tabular summary of the Company’s compliance record for the year under review is<br />
set out in Table 27.<br />
Table 27 Summary of performance for Consent 5026-1 to discharge stormwater and wash-water<br />
from a concrete batching plant into a tributary of the Kahouri Stream<br />
Condition requirement Means of monitoring during period under review Compliance achieved?<br />
1. No discharge of untreated<br />
stormwater or wastewater<br />
Inspections Yes<br />
2. Plant shall be contoured/bunded Inspections Yes<br />
3. Minimise amounts of silt<br />
contained in stormwater<br />
4. Maintain and operate silt control<br />
system; maximise treatment of<br />
stormwater<br />
5. Limits on effects after reasonable<br />
mixing<br />
Inspections Yes<br />
Inspections Yes<br />
Biological monitoring Yes<br />
6. Discharge contaminant limits Inspections, water quality monitoring Yes<br />
7. Fuel must be bunded Inspections Yes<br />
8. Optional review of consent Not exercised N/A<br />
N/A = not applicable<br />
During the year, the Company demonstrated a high level of environmental<br />
performance and compliance with the resource consents. During the year under<br />
review there were no incidents, and the site was well managed. Water quality<br />
monitoring indicated no adverse effects on biological communities as a result of the<br />
stormwater discharges from this site.<br />
8.6.4 Recommendations from the 2005-<strong>2006</strong> <strong>Annual</strong> Report<br />
In the 2005-<strong>2006</strong> <strong>Annual</strong> Report, it was recommended:<br />
1. THAT monitoring of discharges from Fletcher Concrete & Infrastructure<br />
Limited in the <strong>2006</strong>-<strong>2007</strong> year continue at the same level as in 2005-<strong>2006</strong>.<br />
These recommendations were implemented in the <strong>2006</strong>-<strong>2007</strong> monitoring year.