85<br />

8.6.2 Environmental effects of exercise of consents<br />

No chemical sampling of stormwater discharges from the site was carried out in the<br />

monitoring period under review.<br />

Receiving water quality and biological monitoring detected no adverse effects on the<br />

tributary or Kahouri Stream as a result of the discharge of stormwater from the site<br />

during the low flow survey of the Kahouri Stream catchment.<br />

8.6.3 Evaluation of performance<br />

A tabular summary of the Company’s compliance record for the year under review is<br />

set out in Table 27.<br />

Table 27 Summary of performance for Consent 5026-1 to discharge stormwater and wash-water<br />

from a concrete batching plant into a tributary of the Kahouri Stream<br />

Condition requirement Means of monitoring during period under review Compliance achieved?<br />

1. No discharge of untreated<br />

stormwater or wastewater<br />

Inspections Yes<br />

2. Plant shall be contoured/bunded Inspections Yes<br />

3. Minimise amounts of silt<br />

contained in stormwater<br />

4. Maintain and operate silt control<br />

system; maximise treatment of<br />

stormwater<br />

5. Limits on effects after reasonable<br />

mixing<br />

Inspections Yes<br />

Inspections Yes<br />

Biological monitoring Yes<br />

6. Discharge contaminant limits Inspections, water quality monitoring Yes<br />

7. Fuel must be bunded Inspections Yes<br />

8. Optional review of consent Not exercised N/A<br />

N/A = not applicable<br />

During the year, the Company demonstrated a high level of environmental<br />

performance and compliance with the resource consents. During the year under<br />

review there were no incidents, and the site was well managed. Water quality<br />

monitoring indicated no adverse effects on biological communities as a result of the<br />

stormwater discharges from this site.<br />

8.6.4 Recommendations from the 2005-<strong>2006</strong> <strong>Annual</strong> Report<br />

In the 2005-<strong>2006</strong> <strong>Annual</strong> Report, it was recommended:<br />

1. THAT monitoring of discharges from Fletcher Concrete & Infrastructure<br />

Limited in the <strong>2006</strong>-<strong>2007</strong> year continue at the same level as in 2005-<strong>2006</strong>.<br />

These recommendations were implemented in the <strong>2006</strong>-<strong>2007</strong> monitoring year.