22.02.2013 Views

Annual report 2006-2007 - Taranaki Regional Council

Annual report 2006-2007 - Taranaki Regional Council

Annual report 2006-2007 - Taranaki Regional Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

55<br />

acid soluble zinc concentration of 0.127 (g/m 3) and a dissolved zinc concentration of<br />

0.126 (g/m 3), both well above their respective medians. This high zinc content is due<br />

to a historical event, where <strong>Taranaki</strong> Galvanisers waste was disposed of at the<br />

tannery site.<br />

Zinc (g/m3)<br />

Zinc concentrations in Egmont Tanneries stormwater<br />

discharge (STW001022)<br />

0.2<br />

0.15<br />

0.1<br />

0.05<br />

0<br />

Oct-91<br />

Oct-92<br />

Oct-93<br />

Oct-94<br />

Oct-95<br />

Oct-96<br />

Oct-97<br />

Oct-98<br />

Oct-99<br />

Oct-00<br />

Oct-01<br />

Oct-02<br />

Oct-03<br />

Oct-04<br />

Oct-05<br />

Oct-06<br />

Zinc (acid soluble) Zinc (dissolved) Zinc (total)<br />

Figure 18 Zinc concentrations in the Egmont Tanneries stormwater discharge<br />

4.4.1.3 Results of receiving environment monitoring<br />

Consent condition 1 in resource consent 1816 states that after a mixing zone of 50m<br />

the discharge shall not give rise to the following effects in the receiving Kahouri<br />

Stream tributary:<br />

i) the production of any conspicuous oil or grease films, scums or foams, or floatable<br />

or suspended materials;<br />

ii) any conspicuous change in colour or visual clarity;<br />

iii) any emission of objectionable odour;<br />

iv) the rendering of freshwater unsuitable for consumption by farm animals; and<br />

v) any significant effects on aquatic life.<br />

Water chemistry and biological monitoring were conducted to assess compliance<br />

with the above.<br />

Water chemistry<br />

The chemical water quality survey for the summer low-flow period was performed<br />

on 18 April <strong>2007</strong> during fine weather. The results for all sites in the <strong>2007</strong> survey are<br />

presented in Table 4 (refer to section 2.4.2.2). One chemical monitoring site is located<br />

in the receiving waters downstream of the Egmont Tanneries discharge (site 6,<br />

KHI000369), which also encompasses discharges from Fletcher Concrete and<br />

<strong>Taranaki</strong> Galvanizers (Figure 1).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!