1. THAT monitoring of air emissions from <strong>Taranaki</strong> Abattoir Company (1992)<br />
Limited in the <strong>2006</strong>-<strong>2007</strong> year increases to 5 inspections. The Escort temperature<br />
monitoring of the biofilter is to be reinstated if the Company’s system proves to<br />
be inaccurate or otherwise unreliable. Further inspections may be conducted if<br />
performance in relation to air emissions does not improve.<br />
2. THAT monitoring of discharges to land and water from <strong>Taranaki</strong> Abattoir<br />
Company (1992) Limited in the <strong>2006</strong>-<strong>2007</strong> year continues at the same level as in<br />
the 2005-<strong>2006</strong> year, except for inspections, which are to be increased by one, to a<br />
total of five.<br />
These recommendations were implemented in the <strong>2006</strong>-<strong>2007</strong> monitoring year.<br />
2.6.5 Alterations to monitoring programmes for <strong>2007</strong>-2008<br />
In designing and implementing the monitoring programmes for air/water<br />
discharges in the region, the <strong>Taranaki</strong> <strong>Regional</strong> <strong>Council</strong> has taken into account the<br />
extent of information made available by previous authorities, its relevance under the<br />
Resource Management Act, the obligations of the Act in terms of monitoring<br />
emissions/discharges and effects, and subsequently <strong>report</strong>ing to the regional<br />
community, the scope of assessments required at the time of renewal of permits, and<br />
the need to maintain a sound understanding of industrial processes within <strong>Taranaki</strong><br />
emitting to the atmosphere/discharging to the environment.<br />
In the case of <strong>Taranaki</strong> Abattoir Company (1992) Limited, the programme for <strong>2006</strong>-<br />
<strong>2007</strong> was altered slightly from that for 2005-<strong>2006</strong>. It is now proposed that for <strong>2007</strong>-<br />
2008, an additional two macroinvertebrate samples are included in the biological<br />
survey. This is to assess the impact that the discharge is having in the unnamed<br />
tributary (the abattoir tributary) and to assess whether the impact on the Kahouri<br />
Stream is indeed due to the wastewater discharge. A recommendation to this effect is<br />
attached to this <strong>report</strong>.<br />
2.6.6 Exercise of optional review of consent<br />
Resource consent 6570 provides for an optional review of the consent in June 2008.<br />
Condition 16 allows the <strong>Council</strong> to review the consent, if there are grounds that the<br />
conditions are inadequate to deal with any adverse effects on the environment<br />
arising from the exercise of this resource consent, which were either not foreseen at<br />
the time of the application was considered or which it was not appropriate to deal<br />
with at the time.<br />
Based on the results of monitoring in the year under review, it is considered that<br />
there are no grounds that require a review to be pursued.<br />