Annual report 2006-2007 - Taranaki Regional Council
Annual report 2006-2007 - Taranaki Regional Council Annual report 2006-2007 - Taranaki Regional Council
Appendix I Resource consents held by industries in the Kahouri Stream Catchment (in alphabetical order)
- Page 64 and 65: 4. Egmont Tanneries Limited 4.1 Pro
- Page 66 and 67: permit was issued by the Taranaki R
- Page 68 and 69: 54 An additional inspection was und
- Page 70 and 71: 56 Table 16 Results of summer low-f
- Page 72 and 73: 58 In the 2006-2007 year, there was
- Page 74 and 75: Table 19 Summary of performance for
- Page 76 and 77: 62 In the case of Egmont Tanneries,
- Page 78 and 79: 5.3 Monitoring programme The monito
- Page 80 and 81: 66 Water chemistry The chemical wat
- Page 82 and 83: Table 22 Summary of performance for
- Page 84 and 85: 6. Contact Energy Limited (closed p
- Page 86 and 87: 72 not suggest that discharges from
- Page 88 and 89: 74 7. Contact Energy Limited (CCPS)
- Page 90 and 91: 7.3.2 Biomonitoring surveys 76 One
- Page 92 and 93: 78 Condition requirement Means of m
- Page 94 and 95: 8. Fletcher Concrete & Infrastructu
- Page 96 and 97: 8.3.2 Chemical sampling 82 The Tara
- Page 98 and 99: 84 The stream at this site had a cl
- Page 100 and 101: 8.6.5 Alterations to monitoring pro
- Page 102 and 103: 88 what effects the discharge shall
- Page 104 and 105: 90 Incidents may be alleged to be a
- Page 106 and 107: 10. Water quality in the Kahouri ca
- Page 108 and 109: 94 Most MCI scores were similar to
- Page 110 and 111: 96 12. Summary of recommendations 1
- Page 112 and 113: NH3 unionised ammonia, normally exp
Appendix I<br />
Resource consents held by<br />
industries in the Kahouri Stream Catchment<br />
(in alphabetical order)