22.02.2013 Views

MEMORANDUM FOR A1 - Air Force E-Publishing

MEMORANDUM FOR A1 - Air Force E-Publishing

MEMORANDUM FOR A1 - Air Force E-Publishing

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

AFI91-202 5 AUGUST 2011 83<br />

9.4.8.12. Installation support (Continental United States only) for Department of Energy<br />

(DOE) shipments (SAFE HAVEN and SAFE CONVOY). (See AFI 10-2501).<br />

9.4.8.13. Weapons safety training for unit personnel.<br />

9.4.8.14. Weapons test review process, if applicable.<br />

9.4.8.15. Explosives movement route.<br />

9.4.8.16. Hot Cargo Pads and Inspection Points for Explosives-Loaded Commercial<br />

Vehicles.<br />

9.4.9. Annually review installation explosives location map and provide changes and<br />

corrections to CES. Review must be documented and maintained by the safety office. CES<br />

published maps should be coordinated with logistics, operations and safety. The reviews can<br />

be documented on separate logs and should include but not be limited to the following<br />

applicable areas.<br />

9.4.9.1. Explosives safety ―clear zones‖ required around each location based on quantitydistance<br />

criteria.<br />

9.4.9.2. Primary and alternate explosives movement routes through the installation.<br />

9.4.9.3. Authorized flight line locations for conducting explosives operations to include<br />

concurrent servicing operations activities, explosives aircraft cargo on or off loading, and<br />

combat aircraft explosives loading.<br />

9.4.9.4. Locations for handling hung ordnance and gun-clearing operations.<br />

9.4.9.5. Arm and de-arm areas.<br />

9.4.9.6. Explosives support workplaces, such as flightline munitions holding areas.<br />

9.4.9.7. Base explosives prohibited zones (see AFMAN 91-201 and UFC 3-260-01).<br />

9.4.9.8. Vehicle inspection points and suspect vehicle areas.<br />

9.4.9.9. Parking spots for aircraft loaded with munitions or explosives identified in<br />

AFMAN 91-201.<br />

9.4.9.10. Potential electromagnetic radiation hazard zones that could affect munitions<br />

operations. After 100% evaluation, plot only those zones that actually impact munitions<br />

operations to include primary and alternate explosive routes. The review must be<br />

documented and maintained by Weapons Safety. The reviews can be documented on<br />

separate logs.<br />

9.4.10. With the assistance of Ground Safety, assign RACs to weapons safety hazards.<br />

9.5. Weapons Safety Program Requirements. Units that maintain explosives must:<br />

9.5.1. With the assistance of base civil engineering and safety, submit explosives site plans<br />

according to AFMAN 91-201. The installation safety office is the OPR for all explosives site<br />

plans.<br />

9.5.2. License facilities that store small quantities of explosives according to AFMAN 91-<br />

201.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!