AFI91-202 5 AUGUST 2011 71<br />

construction projects, the COS reviews the initial plan and follow-on plans for compliance with<br />

AFI 32-1023, Designing and Constructing Military Construction Projects, Unified Facilities<br />

Criteria (UFC) 3-260-01, <strong>Air</strong>field and Heliport Planning and Design, and attends the<br />

preconstruction conference or briefing to consider if it will affect unit operations.<br />

7.7.1. COS will participate in annual Chief of <strong>Air</strong>field Management review of airfield<br />

waivers per AFI 13-213, <strong>Air</strong>field Management.<br />

7.7.2. When able, COS should participate in risk analysis of items needing waivers and work<br />

to eliminate those items. Consider these factors:<br />

7.7.2.1. The inspection of areas before use.<br />

7.7.2.2. The impact of maintenance and construction on daily flying schedule and<br />

emergency situations.<br />

7.7.2.3. The communications between the tower and contractor and the availability of the<br />

contracting agent.<br />

7.7.2.4. Controlling vehicular traffic on the airfield and designating haul routes for<br />

contractor trucks.<br />

7.7.2.5. Briefing pilots and transient aircrews with updated information.<br />

7.7.2.6. Establishing the minimum allowable distance between equipment and the<br />

runway.<br />

7.7.2.7. Marking obstructions, controlling foreign objects and assigning hearing<br />

protection.<br />

7.7.2.8. Explosives safety criteria.<br />

7.7.2.9. The potential impact of construction on wildlife hazards to airfield operations.