Clear Zones, as well as apron areas and taxiways, regardless of their location. As a minimum,<br />

turf shall be maintained 500 feet outside the AMA boundary where able. Installations located in<br />

arid climates where growing grass is difficult may develop natural vegetation on the airfield to<br />

limit attractiveness to wildlife. These situations require comprehensive vegetation/wildlife<br />

hazard management and will be reviewed individually by HQ AFSEC/SEFW for approval.<br />

Installation safety offices may request a grass height restriction waiver from HQ AFSEC/SEFW<br />

after MAJCOM coordination.<br />

(Add) 7.3.1.5.10. Technical Assistance. Technical assistance is available through the USAF<br />

BASH Team, HQ AFSEC/SEFW, 9700 G Avenue, Suite 266, Kirtland AFB, NM 87117-5670.<br />

DSN: 246-5674/5848/5673 or Commercial: (505) 846-xxxx, and electronically by accessing the<br />

Safety Center web page. Obtain additional information on wildlife strike hazard reduction from<br />

AFPAM 91-212, Bird/Wildlife <strong>Air</strong>craft Strike Hazard (BASH) Management Techniques, and on<br />

wildlife strike reporting from AFI 91-204, Safety Investigations and Reports, and AFMAN 91-<br />

223, Aviation Safety Investigations and Reports.<br />

(Replace) 8.5.4. Assist supervisors in developing JSTO.<br />

(Replace) 8.7.4.1.5. Functional managers must train affected employees and employee<br />

representatives on approved variances, exemptions or any special procedures required and<br />

document training. Post copies in affected work areas until integrated into the JSTO.<br />

(Add) A3.8.3. Forward HATR summary information to AFSEC/SEFO when requested and/or if<br />

HAF level assistance is needed to mitigate hazards.<br />

(Delete) A.2.3.1.<br />

(Delete) A.2.3.2.<br />

(Delete) A.2.3.3.<br />

(Delete) A.2.3.4.<br />

(Delete) A.2.3.1..<br />

(Add) A2.3.1. The nomenclature, manufacturer and status of each equipment item for each<br />

Model Design Series.<br />

(Add) A2.3.2. If an update or procurement is in progress document the current configuration,<br />

the new configuration, its Initial Operational Capability (IOC) date and its expected completion<br />

date by Fiscal Year Quarter.<br />

(Add) A2.3.3. If an item is planned but not funded, do not report it. If an item is in source<br />

selection, report it as to be determined (TBD) and include estimated IOC and completion dates.