146 AFI91-202 5 AUGUST 2011<br />
<strong>A1</strong>5.2.5 What, if any, interim corrective action has already been taken to reduce risk (change in<br />
mission, operational restrictions, grounding, increased inspections, TCTO actions, etc.)? –<br />
Interim Risk<br />
<strong>A1</strong>5.2.6. What, if any, additional action has been recommended by the Material Safety Task<br />
Group, SSG, SSWG or other group? – Risk Mitigation Options<br />
<strong>A1</strong>5.2.7. What are the expected future mishap rate(s) (class A, B, C, etc.) to be caused by this<br />
deficiency if it is not corrected? – Risk Mitigation Options<br />
<strong>A1</strong>5.2.8. What are the affected fleet size and its expected future life exposure; for example (list<br />
average number of operationally available aircraft per year, years of operational life remaining,<br />
average programmed flying hours per year)? – Risk Mitigation Options<br />
<strong>A1</strong>5.2.9. What are the expected total future direct losses (and indirect losses) if the modification<br />
is not approved? If sufficient data exists to make these predictions, what is the current mishap<br />
severity, probability and frequency, and resulting mishap risk index values? – Risk Mitigation<br />
Options<br />
<strong>A1</strong>5.2.10. How will the proposed modification eliminate or control these losses? – Risk<br />
Mitigation Options<br />
<strong>A1</strong>5.2.11. How effective will the control of losses be? – Risk Mitigation Options<br />
<strong>A1</strong>5.2.12. If the modification is approved, what are the expected losses to be avoided, and any<br />
other quantitative or qualitative benefits? – Risk Mitigation Options<br />
<strong>A1</strong>5.2.13. Does the proposed modification create any new hazards for the system (consider<br />
mission and people, machine and environmental system elements)? – Risk Mitigation Options<br />
<strong>A1</strong>5.2.14. Why are other alternatives to risk reduction unacceptable (accept losses, preferred<br />
parts substitution, time change, training, procedural changes, increased inspections, etc.)? - Risk<br />
Mitigation Options<br />
<strong>A1</strong>5.2.15. If the modification is approved, what will be done to reduce risk until the<br />
modification is fully implemented? – Not Included