AFI91-202 5 AUGUST 2011 137<br />

<strong>A1</strong>0.4.2.7. Item 10 (Exposure). Enter the average number of personnel exposed to the<br />

hazard daily.<br />

<strong>A1</strong>0.4.2.8. Item 11 (Description). Give a word description of the hazard to illustrate its<br />

potential impact if not abated.<br />

<strong>A1</strong>0.4.3. Part II—Abatement Information:<br />

<strong>A1</strong>0.4.3.1. Item 12 (Description). Give a description of the permanent abatement action<br />

taken or programmed to eliminate or reduce the hazard.<br />

<strong>A1</strong>0.4.3.2. Item 13 (Method). List the work method or avenue by which the hazard is to<br />

be abated. Examples include self-help, civil engineering work order, contract and local<br />

purchase.<br />

<strong>A1</strong>0.4.3.3. Item 14 (Project Number). Include document numbers associated with work<br />

requests, work orders, job orders, or projects. Also include supply requisitions and<br />

maintenance work orders.<br />

<strong>A1</strong>0.4.3.4. Item 15 (Completion Date). If programmed in current fiscal year (FY),<br />

provide month and year. If programmed in future FY, indicate FY. If abatement has been<br />

completed, indicate actual completion date.<br />

<strong>A1</strong>0.4.3.5. Item 16 (Cost). Indicate whether estimated for unabated hazards or<br />

deficiencies or actual for completed abatement actions.<br />

<strong>A1</strong>0.4.3.6. Item 16a (Project Cost). Indicate total cost associated with project identified<br />

in item 14.<br />

<strong>A1</strong>0.4.3.7. Item 16b (Abatement Cost). If the cost to abate the hazard is not the total cost<br />

of the project, enter only the cost associated with correction of the hazard. For example, a<br />

$500,000 facility renovation project will correct hazardous electrical wiring estimated to<br />

cost $25,000. Item 16a would show $500,000 while item 16b would show $25,000.<br />

<strong>A1</strong>0.4.3.8. Item 17 (Status). Indicate status of project identified in item 14; include major<br />

milestones, reasons for delay, percent complete. Other examples include ―in design,‖ ―in<br />

procurement,‖ ―under construction,‖ ―awaiting materials,‖ and ―closed.‖<br />

<strong>A1</strong>0.4.3.9. Item 18 (Interim Control Measures). List temporary measures taken to reduce<br />

the risk associated with the hazard pending completion of permanent abatement action.<br />

Examples include issuance of personal protective equipment (specify type), termination<br />

of operations and work around procedures (specify).<br />

<strong>A1</strong>0.4.3.10. Items 19 through 21. (Functional Manager; Signature; Date). Selfexplanatory.<br />

<strong>A1</strong>0.4.3.11. Item 22 (Review Record). Use this area for functional manager and<br />

commander reviews.<br />

<strong>A1</strong>0.4.4. The qualified safety, fire protection or health official assigns a control number for<br />

new inputs and completes items 23 through 32 of AF Form 3 based on information furnished<br />

by the functional manager in Parts I and II. Once signed and completed retain one copy and<br />

send the second copy to the installation safety office to be included in the installation master<br />

hazard abatement plan.