22.02.2013 Views

MEMORANDUM FOR A1 - Air Force E-Publishing

MEMORANDUM FOR A1 - Air Force E-Publishing

MEMORANDUM FOR A1 - Air Force E-Publishing

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

AFI91-202 5 AUGUST 2011 135<br />

Attachment 9<br />

INSTRUCTIONS <strong>FOR</strong> COMPLETING AF <strong>FOR</strong>M 1118, NOTICE OF HAZARD<br />

A9.1. AF Form 1118. Qualified safety, fire protection, and health (Bioenvironmental<br />

Engineering, PH, flight surgeon and (or) occupational medicine physician) officials are the sole<br />

issuing authorities for AF Form 1118.<br />

A9.2. Control Number. The control number for the AF Form 1118 will be the agency code (S,<br />

F, H), date of hazard identification, and sequential number (Example: S-20061201-1). The<br />

numbering system will coincide with the corresponding Hazard Abatement Plan (AF Form 3).<br />

A9.3. Location. Note the building number, room number and function involved where the<br />

hazard is located, and nomenclature of the hazardous item or procedure (Example: Building 18,<br />

Room 217, Civil Engineering Carpenter Shop, Table Saw).<br />

A9.4. Hazardous Condition. Describe in detail the nature of the hazard, including a reference<br />

to the standard or requirement violated, if any.<br />

A9.5. Risk Assessment Code. List RAC, followed by RAC description. (Example: "1<br />

[Imminent Danger].")<br />

A9.6. Interim Control Measures. Identify temporary measures needed to reduce the degree of<br />

risk associated with the hazard to an "acceptable degree‖ until permanent corrective actions are<br />

implemented. Assigned RAC code will remain until completely abated even though interim<br />

control measures are in effect.<br />

A9.7. Permanent Corrective Action. List the action that will permanently eliminate the<br />

identified hazard. Include associated document number. Examples: Install new exhaust system;<br />

CE work order and project number.<br />

A9.8. Contact Point. Name, grade, office symbol and telephone number of individual<br />

responsible for elimination of the hazard.<br />

A9.9. Estimated Completion Date. Self-explanatory.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!