134 AFI91-202 5 AUGUST 2011<br />

Table<br />

A8.2.3. Step 3. Determine exposure (E). Assumption: The functional manager or supervisor<br />

determined that on an average day 25 people are exposed to the hazard.<br />

A8.2.4. Step 4. Determine the total cost of project (C). Assumption: The total cost of the<br />

project to abate the hazard as provided to the functional manager by Civil Engineering is<br />

$2,100.<br />

A8.2.5. Step 5. Determine CEI. CEI = C/ (M) (E); (M) (E) = 21x25, therefore CEI = 2100/<br />

(21) (25) = 4.<br />

A8.2.6. Step 6. Determine APN. APN will be (RAC) (CEI) = (2) (4).<br />

A8.2.7. Step 7. Determine relative priority. The APN will now be used to prioritize this<br />

project in relation to other RAC 2s for which APNs have been computed. A hypothetical<br />

priority listing containing this project is shown in table A8.2.<br />

RAC CEI APN Priority<br />

1 (3) 1(3) 1<br />

1 (113) 1(113) 2<br />

2 (4) 2(4) 3<br />

2 (15) 2(15) 4<br />

3 (96) 3(96) 5<br />

3 (11) 3(11) 6<br />

A8.2. Abatement Priority Number Index.<br />

NOTE: The APN system is not used to compare projects of two different RACs.