AFI91-202 5 AUGUST 2011 95<br />
11.2.7.1.6. Identifies and assesses safety hazards and risks throughout the program<br />
life. Ensures safety portions of PESHE are current and coordinated through the<br />
Center System Safety Manager (CSSM). Annually reports safety risk management<br />
policies, accepted mishap risks and those that require PEO or higher action for their<br />
program to the Center system safety manager IAW paragraph 11.2.7.2.7<br />
11.2.7.1.7. Incorporates safety requirements and design criteria into appropriate<br />
program documents.<br />
11.2.7.1.8. Works with System Engineering staff to provide System Safety risk<br />
assessments for program and technical reviews.<br />
11.2.7.1.9. Develops, recommends and oversees special tests to verify effectiveness<br />
of mitigation measures.<br />
11.2.7.1.10. Develops and implements tracking procedures for all identified hazards<br />
and mitigation measures. Documents management decisions for acceptance of mishap<br />
risks.<br />
11.2.7.1.11. When appropriate, develops operating limits and other safety risk<br />
mitigation measures in concert with the lead, using or operational commands. System<br />
Safety personnel must identify and document particular safety constraints as early as<br />
possible.<br />
11.2.7.1.12. Conducts SSGs/System Safety Working Groups (SSWGs), when<br />
required, for their program.<br />
11.2.7.1.13. Prepares formal risk assessment packages.<br />
11.2.7.1.14. Ensures System Safety requirements are clearly defined within the<br />
Systems Engineering process for their program.<br />
11.2.7.1.15. For AFMC managed systems and end-items, works with the assigned<br />
chief engineer in the assurance of system and or end-item’s Operational Safety,<br />
Suitability, and Effectiveness (OSS&E) baseline.<br />
11.2.7.1.16. As part of the preparations for fielding new or modified systems, ensures<br />
using commands are provided with a listing of all identified hazards, their mitigation<br />
measures, mishap risk assessments, residual hazards and risk acceptance<br />
documentation.<br />
11.2.7.1.17. Identify budget requirements that support mishap investigations and<br />
corrections of deficiencies in support of their program.<br />
11.2.7.1.18. Provides updates to the USAF Safety Equipment Database 30 calendar<br />
days prior to the close of each fiscal year to HQ AFMC/SES for forwarding to HQ<br />
AFSC/SEFE. Attachment 2 contains the required information and format.<br />
11.2.7.2. When assigned as a Center System Safety Manager (CSSM):<br />
11.2.7.2.1. HQ AFRL and each product and logistics center will have a trained fulltime<br />
CSSM in the center safety office, unless waived by HQ AFMC/SES.<br />
11.2.7.2.2. Each laboratory technical directorate and test center will have a trained<br />
SSM in the laboratory/test center safety office. (The laboratory/test CSSM can be a