22.02.2013 Views

wbt optic fiber ducting raceway - Yellowduct

wbt optic fiber ducting raceway - Yellowduct

wbt optic fiber ducting raceway - Yellowduct

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5. Draw plan<br />

www.warrenandbrown.com.au<br />

List all components required by part number and quantity from the following pages. Note: Ensure<br />

that all components including joiners, mounting hardware, end caps, convoluted tube etc. are<br />

included.<br />

We recommend including 10% more joiners and brackets.<br />

Designing a<br />

WBT Solutions<br />

Draw plan view of room/area where <strong>ducting</strong>~<strong>raceway</strong> is required. Include cabinet sizes and positions as well<br />

as ladder racks, cable trays or Air conditioning ducts. Denote duct size required in each area. Mark<br />

<strong>ducting</strong>~<strong>raceway</strong> support bracket locations. The recommended spacing for mounting brackets is 900mm or<br />

1.2 Metres maximum.<br />

For copper systems use 600mm spacing. Brackets should be mounted close to the<br />

joiners if possible. Draw a side view of all areas where the <strong>ducting</strong>~ <strong>raceway</strong> changes level or mounting<br />

system needs to change.<br />

6. Materials List<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!