material waste in the malaysian construction industry - ITChannel

material waste in the malaysian construction industry - ITChannel material waste in the malaysian construction industry - ITChannel

20.02.2013 Views

The International Conference on Administration and Business The International Conference on Economics and Administration, Faculty of Administration and Business, University of Bucharest, Romania ICEA – FAA Bucharest, 14-15 th November 2009 MATERIAL WASTE IN THE MALAYSIAN CONSTRUCTION INDUSTRY Abstract: Construction waste has a major impact on the environment. With the demands in implementing major infrastructure projects in Malaysia, together with many commercial building and housing development programmes, a large amount of construction waste is being produced by the construction sector. The construction industry is responsible for producing a whole variety of waste, the amount and type of which depends on factors, such as the stage of construction, type of construction work and practices on site. Thus, waste minimization is an important area of concern in the implementation of construction waste management in the construction industry of Malaysia. Extra construction materials are usually planned due to the lack of consideration given to waste reduction during the planning and design stage to minimize the generation of waste. The excessive wastage of raw materials, improper waste management and low awareness of the need for waste reduction are common in the local construction sites. This paper was presented an overview on this issue. As results, it has found out the importance of materials control that is materials storage management able to increase profitability, minimizing the wastage, improve working efficiency and others. � ICEA - FAA 2009 � 14 – 15 NOVEMBER 2009 � http://conference.faa.ro � The Faculty of Business and Administration University of Bucharest Teoh Su PING abdaziz@usm.my School of Housing, Building and Planning, Universiti Sains Malaysia, Malaysia Abdelnaser OMRAN naser_elamroni@yahoo.co.uk; School of Housing, Building and Planning, Universiti Sains Malaysia, Malaysia Abdul Hamid Kadir PAKIR naser_elamroni@yahoo.co.uk; School of Housing, Building and Planning, Universiti Sains Malaysia, Malaysia 257 Keywords: Material waste, storage, construction industry, Malaysia. 1. Introduction Since the environmental issue is in concern globally, waste generated by industrial operations need to be categorized in list of concern too as waste levels indicate the appreciation of use of environment natural resources. Among those industry operations, construction industry also contributes a significant waste to the overall waste volume annually for majority country. Construction waste can occur at every stage of the activities but most of those involved in the operation do not aware of that. Waste level for initial stage of construction activities can be low and the most significant waste level can be observed during the construction phase especially on site where most of the resources are being used in this stage. New concepts of waste control are being applied in many countries nowadays. Material Storage Management (MSM) is in great concern. These are all done to ensure the waste is being controlled as well as the environmental condition is being protected. It is no longer a new and hot issue in the current local construction trend, but yet not all of the local construction company practicing fully the scope of this management system. Theoretically, MSM approaches do contribute to work

The International Conference on Adm<strong>in</strong>istration and Bus<strong>in</strong>ess<br />

The International Conference on Economics and Adm<strong>in</strong>istration, Faculty of Adm<strong>in</strong>istration and<br />

Bus<strong>in</strong>ess, University of Bucharest, Romania<br />

ICEA – FAA Bucharest, 14-15 th November 2009<br />

MATERIAL WASTE IN THE MALAYSIAN CONSTRUCTION INDUSTRY<br />

Abstract:<br />

Construction <strong>waste</strong> has a major impact on<br />

<strong>the</strong> environment. With <strong>the</strong> demands <strong>in</strong><br />

implement<strong>in</strong>g major <strong>in</strong>frastructure projects<br />

<strong>in</strong> Malaysia, toge<strong>the</strong>r with many commercial<br />

build<strong>in</strong>g and hous<strong>in</strong>g development<br />

programmes, a large amount of <strong>construction</strong><br />

<strong>waste</strong> is be<strong>in</strong>g produced by <strong>the</strong> <strong>construction</strong><br />

sector. The <strong>construction</strong> <strong>in</strong>dustry is<br />

responsible for produc<strong>in</strong>g a whole variety of<br />

<strong>waste</strong>, <strong>the</strong> amount and type of which depends<br />

on factors, such as <strong>the</strong> stage of <strong>construction</strong>,<br />

type of <strong>construction</strong> work and practices on<br />

site. Thus, <strong>waste</strong> m<strong>in</strong>imization is an<br />

important area of concern <strong>in</strong> <strong>the</strong><br />

implementation of <strong>construction</strong> <strong>waste</strong><br />

management <strong>in</strong> <strong>the</strong> <strong>construction</strong> <strong>in</strong>dustry of<br />

Malaysia. Extra <strong>construction</strong> <strong>material</strong>s are<br />

usually planned due to <strong>the</strong> lack of<br />

consideration given to <strong>waste</strong> reduction<br />

dur<strong>in</strong>g <strong>the</strong> plann<strong>in</strong>g and design stage to<br />

m<strong>in</strong>imize <strong>the</strong> generation of <strong>waste</strong>. The<br />

excessive wastage of raw <strong>material</strong>s, improper<br />

<strong>waste</strong> management and low awareness of <strong>the</strong><br />

need for <strong>waste</strong> reduction are common <strong>in</strong> <strong>the</strong><br />

local <strong>construction</strong> sites. This paper was<br />

presented an overview on this issue. As<br />

results, it has found out <strong>the</strong> importance of<br />

<strong>material</strong>s control that is <strong>material</strong>s storage<br />

management able to <strong>in</strong>crease profitability,<br />

m<strong>in</strong>imiz<strong>in</strong>g <strong>the</strong> wastage, improve work<strong>in</strong>g<br />

efficiency and o<strong>the</strong>rs.<br />

� ICEA - FAA 2009 � 14 – 15 NOVEMBER 2009 � http://conference.faa.ro<br />

�<br />

The Faculty of Bus<strong>in</strong>ess and Adm<strong>in</strong>istration<br />

University of Bucharest<br />

Teoh Su PING<br />

abdaziz@usm.my<br />

School of Hous<strong>in</strong>g, Build<strong>in</strong>g and Plann<strong>in</strong>g,<br />

Universiti Sa<strong>in</strong>s Malaysia, Malaysia<br />

Abdelnaser OMRAN<br />

naser_elamroni@yahoo.co.uk;<br />

School of Hous<strong>in</strong>g, Build<strong>in</strong>g and Plann<strong>in</strong>g,<br />

Universiti Sa<strong>in</strong>s Malaysia, Malaysia<br />

Abdul Hamid Kadir PAKIR<br />

naser_elamroni@yahoo.co.uk;<br />

School of Hous<strong>in</strong>g, Build<strong>in</strong>g and Plann<strong>in</strong>g,<br />

Universiti Sa<strong>in</strong>s Malaysia, Malaysia<br />

257<br />

Keywords: Material <strong>waste</strong>, storage,<br />

<strong>construction</strong> <strong>in</strong>dustry, Malaysia.<br />

1. Introduction<br />

S<strong>in</strong>ce <strong>the</strong> environmental issue is <strong>in</strong> concern<br />

globally, <strong>waste</strong> generated by <strong>in</strong>dustrial<br />

operations need to be categorized <strong>in</strong> list of<br />

concern too as <strong>waste</strong> levels <strong>in</strong>dicate <strong>the</strong><br />

appreciation of use of environment natural<br />

resources. Among those <strong>in</strong>dustry operations,<br />

<strong>construction</strong> <strong>in</strong>dustry also contributes a<br />

significant <strong>waste</strong> to <strong>the</strong> overall <strong>waste</strong> volume<br />

annually for majority country. Construction<br />

<strong>waste</strong> can occur at every stage of <strong>the</strong><br />

activities but most of those <strong>in</strong>volved <strong>in</strong> <strong>the</strong><br />

operation do not aware of that. Waste level<br />

for <strong>in</strong>itial stage of <strong>construction</strong> activities can<br />

be low and <strong>the</strong> most significant <strong>waste</strong> level<br />

can be observed dur<strong>in</strong>g <strong>the</strong> <strong>construction</strong><br />

phase especially on site where most of <strong>the</strong><br />

resources are be<strong>in</strong>g used <strong>in</strong> this stage. New<br />

concepts of <strong>waste</strong> control are be<strong>in</strong>g applied<br />

<strong>in</strong> many countries nowadays. Material<br />

Storage Management (MSM) is <strong>in</strong> great<br />

concern. These are all done to ensure <strong>the</strong><br />

<strong>waste</strong> is be<strong>in</strong>g controlled as well as <strong>the</strong><br />

environmental condition is be<strong>in</strong>g protected.<br />

It is no longer a new and hot issue <strong>in</strong> <strong>the</strong><br />

current local <strong>construction</strong> trend, but yet not<br />

all of <strong>the</strong> local <strong>construction</strong> company<br />

practic<strong>in</strong>g fully <strong>the</strong> scope of this<br />

management system. Theoretically, MSM<br />

approaches do contribute to work


performance improvement and <strong>waste</strong><br />

reduction. However, <strong>the</strong> extent on how much<br />

have <strong>the</strong> local contractors follow on this aspect<br />

<strong>in</strong> controll<strong>in</strong>g <strong>the</strong>ir <strong>waste</strong>, it is really doubtful.<br />

S<strong>in</strong>ce this Material Storage Management with<br />

its aim to reduc<strong>in</strong>g <strong>waste</strong> and <strong>in</strong>creas<strong>in</strong>g<br />

performance production, this is an added<br />

advantage to <strong>the</strong> contractor <strong>in</strong> maximiz<strong>in</strong>g<br />

<strong>the</strong>ir profitability as <strong>waste</strong> can be reduced.<br />

Therefore, <strong>the</strong> focus will be aim<strong>in</strong>g <strong>in</strong><br />

clarify<strong>in</strong>g <strong>the</strong> advantages provided by<br />

implementation of Material Storage<br />

Management and also <strong>the</strong> effect on <strong>waste</strong><br />

m<strong>in</strong>imization. The extent of implementation<br />

can be <strong>in</strong>vestigated among <strong>the</strong> local<br />

<strong>construction</strong> companies. This paper<br />

emphasised on some of <strong>the</strong> items <strong>in</strong> <strong>the</strong><br />

<strong>material</strong> control system such as <strong>material</strong>s<br />

obta<strong>in</strong><strong>in</strong>g, <strong>material</strong>s plann<strong>in</strong>g, <strong>material</strong>s<br />

schedul<strong>in</strong>g, <strong>material</strong>s purchas<strong>in</strong>g, <strong>material</strong>s<br />

delivery and check<strong>in</strong>g, <strong>material</strong>s handl<strong>in</strong>g and<br />

<strong>material</strong>s storage. In order to provide a clear<br />

understand<strong>in</strong>g to <strong>the</strong> <strong>material</strong>s control, some<br />

details on this from literature reviews are<br />

provided <strong>in</strong> brief.<br />

2 Literature Review<br />

The International Conference on Adm<strong>in</strong>istration and Bus<strong>in</strong>ess<br />

2.1 Issue of Waste <strong>in</strong> Malaysia<br />

Some <strong>waste</strong> is unavoidable even under<br />

perfect conditions of design and <strong>construction</strong>.<br />

But excessive <strong>waste</strong> is common <strong>in</strong> <strong>the</strong><br />

<strong>construction</strong> process and has received lack<br />

consideration by contractors or <strong>the</strong> <strong>in</strong>dustry.<br />

� ICEA - FAA 2009 � 14 – 15 NOVEMBER 2009 � http://conference.faa.ro<br />

�<br />

The Faculty of Bus<strong>in</strong>ess and Adm<strong>in</strong>istration<br />

University of Bucharest<br />

The <strong>waste</strong> levels <strong>in</strong> Malaysia is considerably<br />

high and from <strong>the</strong> Malaysia Environmental<br />

Quality Report 2005 we may f<strong>in</strong>d that <strong>waste</strong><br />

may be generated and treated <strong>in</strong> many<br />

forms. “Based on notification received by <strong>the</strong><br />

Department of Environment (DOE), a total<br />

of 548,916.11 metric tonnes of scheduled<br />

<strong>waste</strong>s were generated <strong>in</strong> 2005 as compared<br />

to 469,584.07 metric tonnes <strong>in</strong> 2004. Oil and<br />

hydrocarbon, m<strong>in</strong>eral sludge and dross were<br />

<strong>the</strong> ma<strong>in</strong> categories of <strong>waste</strong> produced <strong>in</strong> <strong>the</strong><br />

country. The breakdown accord<strong>in</strong>g to <strong>waste</strong><br />

categories and <strong>in</strong>dustry types are given <strong>in</strong><br />

(Table 1, 2 and Figure1, 2 respectively). Of<br />

<strong>the</strong> total <strong>waste</strong>s produced; 85,734.92 metric<br />

tonnes (15.6%) were treated and disposed at<br />

Kualiti Alam Sdn. Bhd., 8,423.26 metric<br />

tonnes (1.5%) were treated and disposed at<br />

Tr<strong>in</strong>ekens (Sarawak) Sdn. Bhd., 17,650.01<br />

metric tonnes (3.2%) of cl<strong>in</strong>ical <strong>waste</strong>s were<br />

<strong>in</strong>c<strong>in</strong>erated at licensed off-site facilities,<br />

5,224.00 metric tonnes (1.0%) were exported<br />

for recovery purposes, 149,569.99 metric<br />

tones (27.2%) of scheduled <strong>waste</strong>s were<br />

recovered at off-site facilities, an estimated<br />

120,345.25 metric tonnes (21.9%) were<br />

treated on-site and 161,968.68 metric tones<br />

(29.5%) were stored onsite at <strong>waste</strong><br />

generators’ premises. Six land farms and 16<br />

on-site <strong>waste</strong> <strong>in</strong>c<strong>in</strong>erators had been licensed<br />

by DOE to allow for on-site treatment and<br />

<strong>in</strong>c<strong>in</strong>eration respectively.” (Malaysia<br />

environmental quality report, 2005).<br />

Table 1 DOE: Quantity of Scheduled Wastes Generated by Category, 2005<br />

258


The International Conference on Adm<strong>in</strong>istration and Bus<strong>in</strong>ess<br />

� ICEA - FAA 2009 � 14 – 15 NOVEMBER 2009 � http://conference.faa.ro<br />

�<br />

The Faculty of Bus<strong>in</strong>ess and Adm<strong>in</strong>istration<br />

University of Bucharest<br />

Table 2 DOE: Quantity of Scheduled Wastes Generated by Industry, 2005<br />

Figure 1. DOE: Quantity of Scheduled Wastes Generated by Category, 2005<br />

259


The International Conference on Adm<strong>in</strong>istration and Bus<strong>in</strong>ess<br />

Figure 2. DOE: Quantity of Scheduled Wastes Generated by Industry, 2005<br />

2.2 Material Waste<br />

Generally, <strong>material</strong> <strong>waste</strong> has usually been<br />

understood to be <strong>the</strong> “difference between <strong>the</strong><br />

<strong>material</strong> delivered to site and that placed or<br />

fixed properly <strong>in</strong> a build<strong>in</strong>g” (Englemere et<br />

al., 1980). Accord<strong>in</strong>g to De Silva and Vithana<br />

(2008) cited by Skoyles (1987) “Material<br />

wastage means <strong>the</strong> different between<br />

<strong>material</strong> delivered to site and those fixed or<br />

placed <strong>in</strong> <strong>the</strong> build<strong>in</strong>g”. Both statements<br />

above giv<strong>in</strong>g <strong>the</strong> same def<strong>in</strong>ition but <strong>the</strong>y<br />

are unsatisfactory as it does not take <strong>in</strong>to<br />

account of <strong>material</strong> <strong>waste</strong> before delivery or<br />

<strong>material</strong> not used for <strong>the</strong>ir <strong>in</strong>tended<br />

purposes or may be used at o<strong>the</strong>r parts of<br />

<strong>the</strong> work. They are not a total loss.<br />

Therefore, <strong>the</strong> result is over-estimates of <strong>the</strong><br />

true loss, for example, fac<strong>in</strong>g brick be<strong>in</strong>g<br />

used as common brick <strong>in</strong> brickwork. It also<br />

does not take account of subsequent or<br />

<strong>in</strong>efficiencies caused by <strong>waste</strong>, for example,<br />

delays and deterioration of work while<br />

damaged or miss<strong>in</strong>g <strong>material</strong>s are replaced.<br />

An acceptable def<strong>in</strong>ition of <strong>waste</strong> is “<strong>the</strong><br />

difference between <strong>the</strong> value of those<br />

<strong>material</strong>s delivered and accepted at site and<br />

those properly used as specified and<br />

accurately measured <strong>in</strong> <strong>the</strong> work, after<br />

deduct<strong>in</strong>g <strong>the</strong> cost sav<strong>in</strong>g of substituted<br />

<strong>material</strong>s and any <strong>material</strong>s transferred<br />

elsewhere (Englemere et al., 1980). It means<br />

� ICEA - FAA 2009 � 14 – 15 NOVEMBER 2009 � http://conference.faa.ro<br />

�<br />

The Faculty of Bus<strong>in</strong>ess and Adm<strong>in</strong>istration<br />

University of Bucharest<br />

260<br />

that by hav<strong>in</strong>g deducted for <strong>the</strong> quantity of<br />

<strong>material</strong>s delivered on site with <strong>the</strong> total<br />

<strong>material</strong> used for <strong>the</strong> <strong>construction</strong> activities<br />

with result<strong>in</strong>g <strong>the</strong> net wastage on site. Thus,<br />

it does not <strong>in</strong>clude <strong>the</strong> wastage that occurs<br />

before delivery except where improper i.e.<br />

damaged, deficient or wrong <strong>material</strong>s are<br />

accepted at <strong>the</strong> site. The loss is expressed as<br />

a percentage. It should be noted that <strong>the</strong><br />

above def<strong>in</strong>ition <strong>in</strong>cludes <strong>waste</strong> from <strong>the</strong><br />

“conversion” process but it does not <strong>in</strong>cludes<br />

<strong>waste</strong> occur before delivery except where<br />

improper <strong>material</strong>s are accepted at site, for<br />

example, damaged, deficient or wrong<br />

<strong>material</strong>s. It also does it <strong>in</strong>clude <strong>the</strong><br />

consequential and <strong>in</strong>direct cost aris<strong>in</strong>g from<br />

<strong>waste</strong>. This <strong>in</strong>direct <strong>waste</strong> is excluded from<br />

<strong>the</strong> def<strong>in</strong>ition because it is difficult to assess<br />

<strong>the</strong> true values of <strong>waste</strong>. Therefore, it is<br />

required to def<strong>in</strong>e o<strong>the</strong>r forms of <strong>waste</strong> so<br />

that <strong>the</strong>y can be accounted for, and <strong>the</strong><br />

<strong>in</strong>dustry’s true <strong>waste</strong> can be measured.<br />

Accord<strong>in</strong>g to <strong>the</strong> Institute of Civil Eng<strong>in</strong>eer,<br />

<strong>the</strong> <strong>construction</strong> <strong>in</strong>dustry is a major<br />

generator of <strong>waste</strong>, which generat<strong>in</strong>g more<br />

<strong>waste</strong> than <strong>the</strong> household sector. Waste<br />

occurs on site for a number of reasons,<br />

result<strong>in</strong>g from all build<strong>in</strong>g operations<br />

particularly from bad stack<strong>in</strong>g at <strong>the</strong> work<br />

place. Such like mis<strong>in</strong>terpretation of<br />

draw<strong>in</strong>gs, over estimat<strong>in</strong>g <strong>the</strong> quantity


The International Conference on Adm<strong>in</strong>istration and Bus<strong>in</strong>ess<br />

dur<strong>in</strong>g tak<strong>in</strong>g-off, faulty workmanship,<br />

carelessness <strong>in</strong> handl<strong>in</strong>g <strong>material</strong>, and etc.<br />

All <strong>the</strong>se events will subsequently caus<strong>in</strong>g<br />

<strong>waste</strong> <strong>in</strong> money; scarce resources as well as<br />

time spend for mak<strong>in</strong>g remedy and<br />

correction action.<br />

The Environmental Protection Act 1990 UK<br />

(EPA 90) Section 75 def<strong>in</strong>es <strong>waste</strong> as:<br />

1. Any substance which constitutes a scrap<br />

<strong>material</strong> or an effluent, or o<strong>the</strong>r unwanted<br />

surplus substance aris<strong>in</strong>g from <strong>the</strong><br />

application of any process.<br />

2. Any substance or article which requires to<br />

be disposed of as be<strong>in</strong>g broken, worn out,<br />

contam<strong>in</strong>ated or o<strong>the</strong>rwise spoiled, but does<br />

not <strong>in</strong>clude a substance which is an<br />

explosive.<br />

3. Anyth<strong>in</strong>g which is discarded or o<strong>the</strong>rwise<br />

dealt with as if it were <strong>waste</strong> shall be<br />

presumed to be <strong>waste</strong> unless <strong>the</strong> contrary is<br />

proved. From <strong>the</strong> po<strong>in</strong>t of view of <strong>the</strong><br />

contractors, wastage means <strong>the</strong> total loss of<br />

build<strong>in</strong>g <strong>material</strong>s or components aris<strong>in</strong>g<br />

from avoidable or unavoidable <strong>material</strong><br />

<strong>waste</strong> however caused. Any handl<strong>in</strong>g<br />

deficiencies, misuse of <strong>material</strong>s and etc,<br />

which will cause extra cost for replac<strong>in</strong>g <strong>the</strong><br />

particular <strong>material</strong>s, will consider as <strong>waste</strong>s.<br />

In any <strong>construction</strong> project, no matter it is<br />

commercial or residential, high rise or low<br />

rise, build<strong>in</strong>g work or civil work, <strong>the</strong> concern<br />

will be put <strong>in</strong>to how to m<strong>in</strong>imize <strong>the</strong> wastage<br />

as little as possible so to achieve <strong>the</strong><br />

optimum profit <strong>in</strong> return. However, this<br />

dissertation only covers <strong>the</strong> <strong>waste</strong> <strong>in</strong><br />

<strong>material</strong>s storage.<br />

2.3 Def<strong>in</strong>ition of Material Storage<br />

Management<br />

Material Management can be def<strong>in</strong>ed as<br />

<strong>in</strong>tegrated management system for<br />

plann<strong>in</strong>g, controll<strong>in</strong>g or redirect<strong>in</strong>g efforts to<br />

achieve a smooth, timely, efficient flow of<br />

<strong>material</strong>s to <strong>the</strong> project <strong>in</strong> <strong>the</strong> required<br />

quality, <strong>the</strong> required time, and at an<br />

acceptable price and quality (Strukhart,<br />

1995). Material Storage Management a sub<br />

part of Material Management. Accord<strong>in</strong>g to<br />

<strong>the</strong> American Production and Inventory<br />

Control Society (APICS), Material Storage<br />

Management is def<strong>in</strong>ed as <strong>the</strong> group<strong>in</strong>g of<br />

management functions support<strong>in</strong>g <strong>the</strong> cycle<br />

of <strong>material</strong>s flow, from <strong>material</strong> receipt,<br />

store, handl<strong>in</strong>g and distribute to po<strong>in</strong>t of<br />

use. Material Storage Management also can<br />

be def<strong>in</strong>ed as an organizational concept that<br />

� ICEA - FAA 2009 � 14 – 15 NOVEMBER 2009 � http://conference.faa.ro<br />

�<br />

The Faculty of Bus<strong>in</strong>ess and Adm<strong>in</strong>istration<br />

University of Bucharest<br />

261<br />

<strong>in</strong>cludes <strong>the</strong> plann<strong>in</strong>g, organiz<strong>in</strong>g,<br />

coord<strong>in</strong>at<strong>in</strong>g and controll<strong>in</strong>g <strong>the</strong> activities<br />

concerned with <strong>the</strong> flow of <strong>material</strong>s <strong>in</strong> <strong>the</strong><br />

storage process, which <strong>in</strong>cludes <strong>in</strong><br />

<strong>construction</strong>. With <strong>the</strong> reference to<br />

Crittenden& Kolaczkowski (1995)., <strong>the</strong>y<br />

def<strong>in</strong>ed Material Storage Management as<br />

“<strong>the</strong> total of all those tasks, function,<br />

activities and rout<strong>in</strong>es which concern <strong>the</strong><br />

transfer of external <strong>material</strong>s and services<br />

<strong>in</strong>to <strong>the</strong> organization and adm<strong>in</strong>istration of<br />

<strong>the</strong> same until <strong>the</strong>y are consumed or used <strong>in</strong><br />

<strong>the</strong> process of production, operations or<br />

sales.” Although this def<strong>in</strong>ition is def<strong>in</strong><strong>in</strong>g<br />

<strong>the</strong> general <strong>material</strong> management for <strong>the</strong><br />

sake of manufactur<strong>in</strong>g, not specify for<br />

<strong>construction</strong> <strong>in</strong>dustry. But <strong>the</strong> same concept<br />

can be relate to <strong>the</strong> <strong>construction</strong>, where it<br />

concern <strong>the</strong> guidel<strong>in</strong>es of all <strong>the</strong> activities<br />

that carry out on site for which <strong>in</strong>volv<strong>in</strong>g <strong>the</strong><br />

stor<strong>in</strong>g and transferr<strong>in</strong>g of <strong>material</strong>s <strong>in</strong>to<br />

<strong>the</strong> activities until <strong>the</strong> build<strong>in</strong>g has been<br />

properly built.<br />

3. Discussion<br />

Some <strong>waste</strong> is <strong>in</strong>evitable under ideal<br />

conditions of design and production. But<br />

excessive <strong>waste</strong> always occurs <strong>in</strong> <strong>the</strong><br />

<strong>construction</strong> process and has never received<br />

proper consideration by most constructors or<br />

<strong>the</strong> <strong>in</strong>dustry at large. Responsibility for<br />

<strong>waste</strong> concerns all members of <strong>the</strong> build<strong>in</strong>g<br />

team. It concern general management as<br />

well as site management, while any solution<br />

to <strong>the</strong> problem must <strong>in</strong>volve site practice, it<br />

<strong>in</strong>volve all managers <strong>in</strong> build<strong>in</strong>g<br />

organization, which is not only <strong>the</strong> site<br />

manager. Waste is not only a site problem; it<br />

extends to every part of <strong>the</strong> <strong>in</strong>dustry and <strong>in</strong><br />

some cases outside it. Considerable <strong>waste</strong><br />

occurs if <strong>the</strong> design <strong>in</strong>formation available is<br />

<strong>in</strong>adequate or <strong>in</strong>complete when <strong>construction</strong><br />

work has to beg<strong>in</strong> such a situation<br />

frequently occurs <strong>in</strong> <strong>the</strong> <strong>construction</strong><br />

<strong>in</strong>dustry. Waste on site is not always<br />

avoidable by those who engaged <strong>in</strong> site<br />

operations. It may be caused by <strong>the</strong> nature of<br />

<strong>the</strong> site, <strong>the</strong> design priorities, <strong>the</strong> forms of<br />

contract used, <strong>the</strong> various terms and<br />

conditions of contract documents, <strong>the</strong> design<br />

and packag<strong>in</strong>g priorities of <strong>the</strong><br />

manufacturers and suppliers and <strong>the</strong><br />

methods of <strong>material</strong>s handl<strong>in</strong>g provided.<br />

Therefore, <strong>the</strong> control of <strong>waste</strong> is vitally both<br />

on and off site. The designer and contractor<br />

can contribute towards a better


understand<strong>in</strong>g of <strong>the</strong> need for positive action<br />

and direction <strong>in</strong> <strong>the</strong> restra<strong>in</strong> of <strong>material</strong><br />

<strong>waste</strong>. The cause of <strong>waste</strong> is viewed and<br />

categorized under three stages <strong>in</strong> <strong>the</strong><br />

<strong>construction</strong> process, which is:<br />

Documentation stage, Pre-contract stage and<br />

Construction stage.<br />

4. Material Storage Management<br />

The International Conference on Adm<strong>in</strong>istration and Bus<strong>in</strong>ess<br />

The <strong>construction</strong> <strong>in</strong>dustry has changed<br />

considerably <strong>in</strong> recent years, <strong>in</strong>fluenc<strong>in</strong>g<br />

production rates, <strong>construction</strong> techniques<br />

and <strong>the</strong> total quantity of <strong>material</strong>s used each<br />

year. The more complicated <strong>the</strong> project, <strong>the</strong><br />

larger volume of <strong>material</strong>s is be<strong>in</strong>g used.<br />

Therefore, effective Materials Storage<br />

Management is essential to suit <strong>the</strong> current<br />

trend. Some of <strong>the</strong> <strong>construction</strong> management<br />

still does not fully appreciate that <strong>material</strong>s<br />

<strong>waste</strong> means f<strong>in</strong>ancial loss and unnecessary<br />

<strong>in</strong>crease <strong>the</strong> production price. Without an<br />

effective Materials Storage Management<br />

be<strong>in</strong>g practiced, <strong>the</strong> problems associated<br />

with poor <strong>material</strong>s handl<strong>in</strong>g, delivery,<br />

wastage and storage arise consequently. As<br />

a result, Material Storage Management is<br />

<strong>in</strong>deed deeded <strong>in</strong> <strong>construction</strong> <strong>in</strong>dustries as<br />

shown <strong>in</strong> <strong>the</strong> follow<strong>in</strong>g:<br />

a) Low profitability<br />

The profitability of a project can be<br />

<strong>in</strong>fluenced by <strong>the</strong> cost of <strong>material</strong>s. Large<br />

costs can be saved from <strong>the</strong> <strong>material</strong>s s<strong>in</strong>ce<br />

it contributes to a substantial value of a<br />

project. As a rule of thumb, <strong>the</strong> higher level<br />

of wastage, <strong>the</strong> lower profitability of <strong>the</strong><br />

project. Therefore, sound Material Storage<br />

Management is needed to maximize<br />

profitability of a project.<br />

b) Construction time delay<br />

The delay of <strong>construction</strong> work may occur<br />

when wrong types or quality of <strong>material</strong>s are<br />

used and <strong>the</strong> time spent for <strong>the</strong> re<strong>construction</strong><br />

and replacement for <strong>the</strong> goods.<br />

Ano<strong>the</strong>r cause of delays is damages dur<strong>in</strong>g<br />

<strong>the</strong> transit of <strong>material</strong>s, shortage of<br />

<strong>material</strong>s, and late delivery of <strong>material</strong>s and<br />

so on. Without proper plann<strong>in</strong>g <strong>in</strong> Material<br />

Storage Management, <strong>the</strong> project is likely to<br />

be delayed.<br />

c) Low productivity<br />

Poor Materials Storage Management will<br />

affect productivity. For example, a congested<br />

site with <strong>material</strong>s not properly allocated<br />

� ICEA - FAA 2009 � 14 – 15 NOVEMBER 2009 � http://conference.faa.ro<br />

�<br />

The Faculty of Bus<strong>in</strong>ess and Adm<strong>in</strong>istration<br />

University of Bucharest<br />

262<br />

will create a lot of double handl<strong>in</strong>g works<br />

and obstruct <strong>the</strong> operation works. The<br />

productivity of <strong>the</strong> work will be reduced with<br />

shortages and delay of <strong>material</strong>s supply that<br />

disrupt program.<br />

d) High level of <strong>material</strong>s wastage<br />

Due to poor storage system, <strong>material</strong>s are<br />

exposed to damage, loss, vandalism etc.<br />

Higher level of wastage may be occurr<strong>in</strong>g<br />

due to over order or under supply of<br />

<strong>material</strong>s. A lot of <strong>material</strong>s are be<strong>in</strong>g<br />

<strong>waste</strong>d due to poor handl<strong>in</strong>g system and<br />

poor workmanship.<br />

e) Poor <strong>material</strong>s storage<br />

When <strong>the</strong> <strong>material</strong>s are not <strong>in</strong> properly<br />

arranged, it may cause damage to <strong>material</strong>s<br />

and obstruct <strong>the</strong> handl<strong>in</strong>g of mechanical<br />

plant. Materials should be unloaded and<br />

stored near to <strong>the</strong> po<strong>in</strong>t of use to prevent<br />

double handl<strong>in</strong>g of work. Without proper<br />

plann<strong>in</strong>g a location of <strong>material</strong>s storage, <strong>the</strong><br />

site may be congested and affect site<br />

accessibility. There is always a tendency for<br />

some of <strong>material</strong>s to be stored <strong>in</strong> wrong<br />

place. For example small and valuable items<br />

like door closers and lockset, which are<br />

always stolen by workers or sub-contractors<br />

when stored <strong>in</strong> an open store.<br />

f) Materials shortage or excesses on<br />

site<br />

Without proper plann<strong>in</strong>g of order<strong>in</strong>g and<br />

deliver<strong>in</strong>g of <strong>material</strong>s, <strong>the</strong>re is a high<br />

tendency fac<strong>in</strong>g <strong>the</strong> shortage of <strong>material</strong>s <strong>in</strong><br />

site. Excess of <strong>material</strong>s delivered to site<br />

creates lot storage problems, if <strong>the</strong> <strong>material</strong>s<br />

are delivered too early on site; <strong>the</strong> risk of<br />

<strong>material</strong>s damaged by progress<strong>in</strong>g works is<br />

high.<br />

5. The Concept of Material Storage<br />

Management<br />

Nei<strong>the</strong>r <strong>the</strong> term<strong>in</strong>ology nor <strong>the</strong> concept of a<br />

totally <strong>in</strong>tegrated <strong>material</strong>s organization has<br />

so far been accepted by all bus<strong>in</strong>ess<br />

throughout <strong>the</strong> world. Companies use<br />

different names, such as “Materials Storage<br />

Management”, “Logistics” or “Physical<br />

Distribution” for similar orig<strong>in</strong>ations.<br />

Despite numerous names, <strong>the</strong> trend <strong>in</strong><br />

recent year shows that local companies tend<br />

to adopt <strong>the</strong> Materials Storage Management<br />

or Logistics Management titles. The<br />

Materials Storage Management concept


The International Conference on Adm<strong>in</strong>istration and Bus<strong>in</strong>ess<br />

<strong>in</strong>volves plann<strong>in</strong>g, purchas<strong>in</strong>g, storages or<br />

<strong>in</strong>ventory, distribution and transport. The<br />

organization and its staff have to consider<br />

<strong>the</strong>ir decisions <strong>in</strong> relation to <strong>the</strong> effects of<br />

Materials Storage Management. Materials<br />

contribute a significant portion of <strong>the</strong> total<br />

cost of good and services. Therefore,<br />

<strong>in</strong>creas<strong>in</strong>gly companies are recogniz<strong>in</strong>g <strong>the</strong><br />

need to implement effective Materials<br />

Storage Management <strong>in</strong> <strong>the</strong> organization to<br />

reduce wastage, maximize profits, establish<br />

needed controls and reduce costs. In a<br />

common Materials Storage Management<br />

concept <strong>the</strong>re are a few key <strong>in</strong>tegrated areas:<br />

a) Plann<strong>in</strong>g<br />

Short and long term plann<strong>in</strong>g strategies are<br />

vital to every company. The primary<br />

objective is to maximize <strong>the</strong> use of company<br />

resources and provide for future demand.<br />

b) Inventory Control<br />

Inventory control <strong>in</strong>cludes activities and<br />

techniques required to ma<strong>in</strong>ta<strong>in</strong> <strong>material</strong>s at<br />

desired levels.<br />

c) Purchas<strong>in</strong>g<br />

Purchas<strong>in</strong>g is responsible for procurement of<br />

<strong>material</strong>s from outside suppliers, <strong>in</strong><br />

accordance with purchase requisition<br />

requirements.<br />

d) Receiv<strong>in</strong>g and Stores<br />

Receiv<strong>in</strong>g and stores is responsible for<br />

activities related to receiv<strong>in</strong>g, stor<strong>in</strong>g,<br />

stor<strong>in</strong>g handl<strong>in</strong>g, issu<strong>in</strong>g and controll<strong>in</strong>g<br />

<strong>material</strong>s.<br />

e) Materials Handl<strong>in</strong>g<br />

Materials handl<strong>in</strong>g <strong>in</strong>volve physical<br />

movement. It is <strong>the</strong> function of develop<strong>in</strong>g<br />

and implement<strong>in</strong>g appropriate manual,<br />

mechanized and automated systems to<br />

provide movement of <strong>material</strong>s throughout<br />

<strong>the</strong> company’s various processes.<br />

g) Physical Distribution<br />

Physical distribut<strong>in</strong>g encompasses all <strong>the</strong><br />

operations <strong>in</strong>volved <strong>in</strong> <strong>the</strong> movement and<br />

flow of <strong>material</strong>s, from store yard to <strong>the</strong><br />

po<strong>in</strong>t of use. Materials Storage Management<br />

rely on close cooperation and coord<strong>in</strong>ation of<br />

all <strong>the</strong>se sub functions. If an <strong>in</strong>dividual subfunction<br />

fails or is <strong>in</strong>effective, <strong>the</strong><br />

effectiveness of <strong>the</strong> entire organization is<br />

tended reduced which mean bottleneck build<br />

up <strong>in</strong> <strong>the</strong> logistics cha<strong>in</strong>.<br />

� ICEA - FAA 2009 � 14 – 15 NOVEMBER 2009 � http://conference.faa.ro<br />

�<br />

The Faculty of Bus<strong>in</strong>ess and Adm<strong>in</strong>istration<br />

University of Bucharest<br />

263<br />

6. Conclusion<br />

Waste occurs throughout <strong>the</strong> <strong>in</strong>dustry<br />

irrespective of <strong>the</strong> size of <strong>the</strong> build<strong>in</strong>g<br />

organization, <strong>the</strong> value and duration of <strong>the</strong><br />

contract or <strong>the</strong> variety of build<strong>in</strong>g type.<br />

Waste is not always avoidable. Wellestablished<br />

<strong>waste</strong> m<strong>in</strong>imization model by<br />

<strong>construction</strong> companies and adoption of it<br />

will help much on it. It is difficult to<br />

determ<strong>in</strong>e <strong>the</strong> effectiveness of <strong>the</strong> <strong>material</strong>s<br />

control due to no best way to assess <strong>the</strong><br />

effectiveness of <strong>the</strong> <strong>material</strong>s control.<br />

However, on a general note <strong>the</strong> effectiveness<br />

of a Material Storage Management scheme<br />

can be enhanced greatly, if <strong>the</strong> overall<br />

program is reviewed <strong>in</strong> advance aga<strong>in</strong>st <strong>the</strong><br />

characteristics of <strong>the</strong> project. Materials<br />

storage management had been <strong>in</strong>troduced to<br />

<strong>in</strong>crease <strong>the</strong> profitability of a project by<br />

reduc<strong>in</strong>g <strong>the</strong> <strong>construction</strong> wastage. It<br />

<strong>in</strong>volves those activities such as plann<strong>in</strong>g,<br />

schedul<strong>in</strong>g, purchas<strong>in</strong>g, receiv<strong>in</strong>g and<br />

check<strong>in</strong>g, handl<strong>in</strong>g, stor<strong>in</strong>g, distribut<strong>in</strong>g and<br />

etc. Attention should be given to each of<br />

<strong>the</strong>se activities <strong>in</strong> order to m<strong>in</strong>imise <strong>the</strong><br />

<strong>construction</strong> wastage. Those <strong>in</strong>dividual<br />

activities <strong>in</strong> <strong>the</strong> <strong>material</strong>s control system<br />

shall co-operate with each o<strong>the</strong>r to make <strong>the</strong><br />

<strong>material</strong>s control successfully. There is<br />

seem<strong>in</strong>gly an endless variety of ways to<br />

organize and plan a project. We can only<br />

categories <strong>the</strong> approach adopted is good,<br />

better or best. Of course, <strong>the</strong> best system<br />

used can earned higher profits. Wastage is<br />

unavoidable <strong>in</strong> <strong>construction</strong> work, ow<strong>in</strong>g to<br />

<strong>material</strong>s contribute a major cost of a<br />

project; an effective control system of it.<br />

def<strong>in</strong>itely will <strong>in</strong>fluence <strong>the</strong> profit marg<strong>in</strong>.<br />

Especially, under <strong>the</strong> pressure of economic<br />

recession, a wisely approaches deal<strong>in</strong>g with<br />

<strong>material</strong>s costs and good management on<br />

<strong>the</strong>ir resources will affect <strong>the</strong> contractor<br />

status <strong>in</strong> this competitive environment.<br />

After carried out this research, it has found<br />

out <strong>the</strong> importance of <strong>material</strong>s control that<br />

is <strong>material</strong>s storage management able to<br />

<strong>in</strong>crease profitability, m<strong>in</strong>imiz<strong>in</strong>g <strong>the</strong><br />

wastage, improve work<strong>in</strong>g efficiency and<br />

o<strong>the</strong>rs. Through work<strong>in</strong>g efficiency,<br />

<strong>material</strong>s control system also can <strong>in</strong>crease<br />

productivity to be globally competitive with<br />

stable systems of rules, regulations and<br />

procedures <strong>in</strong> high level of <strong>in</strong>itiative.


References<br />

The International Conference on Adm<strong>in</strong>istration and Bus<strong>in</strong>ess<br />

1. Crittenden, B. & Kolaczkowski, S. T. (1995).<br />

Waste m<strong>in</strong>imization: a practical guide. Published by<br />

Institution of Chemical Eng<strong>in</strong>eers.<br />

2. De Silva, N. & Vithana, S.B.K.H. (2008). Use of<br />

PC elements for <strong>waste</strong> m<strong>in</strong>imization <strong>in</strong> <strong>the</strong> Sri<br />

Lankan <strong>construction</strong> <strong>in</strong>dustry, Emerald Group<br />

Publish<strong>in</strong>g Limited.<br />

3. Englemere, K<strong>in</strong>gs Ride, Ascot, Berkshire (1980).<br />

Materials Control and Waste <strong>in</strong> Build<strong>in</strong>g. Published<br />

by Chartered Institute of Build<strong>in</strong>g, pg 7.<br />

4. Environmental Protection Act (1990). <strong>in</strong>formation<br />

retrieved from<br />

http://www.opsi.gov.uk/acts/acts1990/Ukpga_199000<br />

43_en_1.htm on 16 Sept 2009.<br />

5. Malaysia environmental quality report (2005).<br />

Department of Environment M<strong>in</strong>istry of Natural<br />

Resources and Environment Malaysia<br />

Strukhart G. (1995). Construction Material<br />

Management, Marcel Dekker, INC.<br />

� ICEA - FAA 2009 � 14 – 15 NOVEMBER 2009 � http://conference.faa.ro<br />

�<br />

The Faculty of Bus<strong>in</strong>ess and Adm<strong>in</strong>istration<br />

University of Bucharest<br />

264