19.02.2013 Views

06 IMYB2011-CHHATTISGARH.pmd - Indian Bureau of Mines

06 IMYB2011-CHHATTISGARH.pmd - Indian Bureau of Mines

06 IMYB2011-CHHATTISGARH.pmd - Indian Bureau of Mines

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table - 3 (Contd.)<br />

STATE REVIEWS<br />

Agency/ Location Mapping Drilling Sampling Remarks<br />

Mineral/ Scale Area No. <strong>of</strong> Metreage Reserves/Resources estimated<br />

District (sq km) boreholes<br />

GSI<br />

Coal<br />

Surguja<br />

Korja<br />

-<br />

-<br />

-<br />

11-6-5<br />

-<br />

-<br />

Regional exploration under G-2 stage was<br />

taken up during FS 2010-12 in this Hasdo<br />

- Arand Coalfield to establish the<br />

developmental pattern and continuity<br />

<strong>of</strong> the regional Barakar coal seams<br />

established in previously explored<br />

Pendrakhi Block in the west, to assess<br />

coal resource potentiality <strong>of</strong> the area as<br />

well as to generate CBM baseline data.<br />

The formational contact between<br />

Barakar and Talchir Formations is<br />

recorded at the depth <strong>of</strong> 365.60m in<br />

borehole – 1. Four regional Barakar coal<br />

seams / zones (Seam III to VI in<br />

ascending order) have been intersected<br />

between depths <strong>of</strong> 97.10 m and 188.65<br />

m within Barakar Formation. Coal Seam<br />

/Zone IV and V are considered to be<br />

significant because <strong>of</strong> their cumulative<br />

coal thickness which ranges from 6.20<br />

m to 7.75 m. Seams/Zones IV and V are<br />

represented by Composite Section with<br />

coal split varying in thickness from 0.30<br />

m to 4.10 m. Four local coal seams (Seam<br />

L1 to Seam L4 in ascending order) have<br />

been recorded between depths <strong>of</strong> 258.95<br />

m and 341.85 m within Lower Member<br />

<strong>of</strong> Barakar Formation. Thickness <strong>of</strong><br />

individual split section varies from 0.15<br />

m to 4.10 m. The work is in progress.<br />

(Contd.)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!