Single Page Plan - Management-Tool zur Prozessvisualisierung<br />
1<br />
2<br />
Single Page Plan<br />
VSM Kaizen<br />
Date: 4/21/03 ->4/24/03<br />
Background<br />
• On-time delivery 32%<br />
• Yearly scrap cost $747k<br />
3,000,000<br />
2,500,000<br />
2,000,000<br />
1,500,000<br />
1,000,000<br />
500,000<br />
• Quality: green yield at 95.2%<br />
• Auto CVD represents 22% of plant<br />
Units<br />
-<br />
KN01<br />
MS01<br />
KN03<br />
KN02<br />
MS02<br />
MS03<br />
CA03<br />
KN04<br />
MS04<br />
CN05<br />
Auto CVD<br />
Top 4 represent<br />
85% of volume<br />
CA07<br />
CN01<br />
MS12<br />
CA09<br />
Components<br />
• Multitude of new high growth products introduced into plant<br />
Supplier<br />
Raw<br />
Purchase<br />
Daily<br />
Value Stream Mapping – Current State<br />
Press<br />
13<br />
Press<br />
6<br />
Press<br />
6<br />
S<br />
i<br />
n<br />
t<br />
e<br />
r<br />
6 week forecast<br />
Daily FAX<br />
S<br />
e<br />
p<br />
a<br />
r<br />
a<br />
t<br />
e<br />
Hone<br />
9<br />
Hone<br />
3<br />
T&B<br />
Grind<br />
7<br />
T&B<br />
Grind<br />
4<br />
T&B<br />
Grind<br />
4<br />
Periphery<br />
Grind<br />
34<br />
Sap<br />
Daily<br />
Production<br />
Scheduling<br />
Hone<br />
3<br />
PreCoat<br />
Vaqua<br />
1<br />
Electro<br />
Polish<br />
2<br />
Electro<br />
Polish<br />
1<br />
Forecast<br />
90/60/30<br />
Daily Order<br />
<strong>Lean</strong>Jet<br />
Wash<br />
1<br />
Crest<br />
Wash<br />
1<br />
Auto<br />
CVD<br />
1<br />
Furnace<br />
14<br />
PreCoat<br />
Vaqua<br />
1<br />
Berney<br />
Polish<br />
1<br />
CA02<br />
CA04<br />
CA13<br />
CA16<br />
CN04<br />
MS14<br />
MS10<br />
MS05<br />
OEM<br />
Mark<br />
Pack<br />
QC<br />
Ship<br />
CN03<br />
CA01<br />
CN08<br />
<strong>Kennametal</strong><br />
Distribution<br />
Daily<br />
Brush Branson<br />
T&B Periphery Hone<br />
Polish Wash<br />
Press<br />
Grind Grind 1<br />
2<br />
1<br />
2 Furnace 10<br />
3 34<br />
Separate 1<br />
7.8 days .3 d .4 d 1.5 d .4 d 2.2 d C.T. 420 s 1.1 d 1.9 d .4 d 3.3 d .1 d .6 d<br />
CT 10 s<br />
CT 61,200 s C.T. 1 s<br />
CT 180 s C.T. 120 s C.T. 120 s C.T. 180 s C.T. 960 s CT 1800 s<br />
CT 79,400 s C.T. 360 s C.T. 1800 s CT 78 s<br />
<strong>Lean</strong>Jet<br />
Wash<br />
1<br />
<strong>Lean</strong>Jet<br />
Wash<br />
1<br />
SMPL<br />
3 units<br />
Lead time 21.9 Days<br />
Cycle time 1.9 d<br />
Takt Time 3.78 s<br />
Supplier<br />
Raw<br />
Purchase Purchase<br />
Daily<br />
P<br />
l<br />
a<br />
n<br />
Value Value Stream Stream Mapping Mapping Mapping – Future State<br />
P<br />
r<br />
e<br />
s<br />
s<br />
F<br />
III<br />
F<br />
O<br />
S<br />
i<br />
n<br />
t<br />
e<br />
r<br />
Implementation Plan<br />
•Work details of Future State<br />
•Review lead-times & safety stock qty.<br />
•Level load high volume items<br />
•Establish inventory turns<br />
•Setup Reduction for Press operation<br />
•Establish FIFO lanes<br />
•Error Proof process<br />
•TPM process at customer critical points<br />
•Standard Work Kaizen on Auto CVD<br />
Furnaces and Top Coat Furnace<br />
Metrics<br />
F<br />
III<br />
F<br />
O<br />
H<br />
o<br />
n<br />
e<br />
F<br />
III<br />
F<br />
O<br />
WIP:<br />
Finished Goods :<br />
Scrap:<br />
Material:<br />
Floor Space:<br />
Setup Reduction:<br />
Cycle Time:<br />
Productivity:<br />
Administrative:<br />
6 week forecast forecast forecast<br />
Daily FAX<br />
E<br />
P<br />
l<br />
o<br />
e<br />
l<br />
c<br />
i<br />
t<br />
s<br />
r<br />
o<br />
h<br />
F<br />
III<br />
F<br />
O<br />
V<br />
B<br />
a<br />
l<br />
q<br />
a<br />
u<br />
s<br />
a<br />
t<br />
May 03<br />
Baseline<br />
Wash<br />
I I<br />
F<br />
III<br />
F<br />
F<br />
III<br />
O<br />
F<br />
O<br />
FIFO FIFO FIFO<br />
FIFO FIFO FIFO<br />
Ma y June July<br />
RESP<br />
2 9 16 23 30 7 1421285<br />
1219<br />
Staff<br />
Lgst<br />
Lgst<br />
Lgst<br />
KC8050 KC8050 KC8050<br />
KC9110 KC9110 KC9110<br />
KC9125 KC9125 KC9125<br />
KC9315 KC9315 KC9315<br />
KC9025 KC9025 KC9025<br />
KC9045 KC9045 KC9045<br />
KC9245 KC9245 KC9245<br />
KC9225 KC9225 KC9225<br />
KC9010 KC9010 KC9010<br />
KC990 KC990 KC990<br />
KC9120 KC9120 KC9120<br />
Mfg 1<br />
•Determine placement of FIFO lanes Mfg 1<br />
F<br />
III<br />
F<br />
O<br />
F<br />
III<br />
F<br />
O<br />
Sap<br />
Daily<br />
Production Production Production<br />
Scheduling Scheduling Scheduling<br />
Mfg 1<br />
Mfg 2<br />
Mfg 3<br />
Mfg 3<br />
6 month<br />
Projection<br />
140,000 pcs. 92,000 pcs.<br />
4.8% 2.0%<br />
NA NA<br />
Process Layout Product Layout<br />
1.9 days 1.9 days<br />
24 employees 21 employees<br />
FIFO FIFO FIFO<br />
Separ ate Ber ney<br />
MPL<br />
FIFO<br />
Forecast<br />
90/60/30<br />
Daily Order<br />
�� � Dedicated Dedicated Dedicated equipment equipment equipment by grade<br />
Separ Separ Separate ate<br />
FIFO FIFO FIFO<br />
FIFO<br />
OEM<br />
Br ush Polish<br />
Separate Separate Separate MPL<br />
5 days .3 d .4 d .5 d .4 d 2.2 d 1.1 d<br />
1.9 d .4 d 1.3 d .1 d .6 d<br />
CT 10 s<br />
CT 61,200 61,200 s<br />
C.T. 1 s CT 180 s C.T. 120 ss s<br />
C.T. 420 ss s CT 1800 1800 ss s<br />
C.T. 960 ss<br />
s<br />
CT 79,400 79,400 79,400 sss C.T. 360 sss CT 1800 sss C.T. 78 sss<br />
Total Savings<br />
$40,320<br />
$85,603<br />
-0-<br />
TBD<br />
28 min 21 min $35,119<br />
-0-<br />
$151,975<br />
NA NA -0-<br />
<strong>Kennametal</strong> <strong>Kennametal</strong> <strong>Kennametal</strong><br />
Distribution Distribution Distribution<br />
Lead time 16.9 Days<br />
Cycle Cycle Cycle time 1.9 d<br />
Takt Time 3.78 s<br />