Single Page Plan - Management-Tool zur Prozessvisualisierung<br />

1<br />

2<br />

Single Page Plan<br />

VSM Kaizen<br />

Date: 4/21/03 ->4/24/03<br />

Background<br />

• On-time delivery 32%<br />

• Yearly scrap cost $747k<br />

3,000,000<br />

2,500,000<br />

2,000,000<br />

1,500,000<br />

1,000,000<br />

500,000<br />

• Quality: green yield at 95.2%<br />

• Auto CVD represents 22% of plant<br />

Units<br />

-<br />

KN01<br />

MS01<br />

KN03<br />

KN02<br />

MS02<br />

MS03<br />

CA03<br />

KN04<br />

MS04<br />

CN05<br />

Auto CVD<br />

Top 4 represent<br />

85% of volume<br />

CA07<br />

CN01<br />

MS12<br />

CA09<br />

Components<br />

• Multitude of new high growth products introduced into plant<br />

Supplier<br />

Raw<br />

Purchase<br />

Daily<br />

Value Stream Mapping – Current State<br />

Press<br />

13<br />

Press<br />

6<br />

Press<br />

6<br />

S<br />

i<br />

n<br />

t<br />

e<br />

r<br />

6 week forecast<br />

Daily FAX<br />

S<br />

e<br />

p<br />

a<br />

r<br />

a<br />

t<br />

e<br />

Hone<br />

9<br />

Hone<br />

3<br />

T&B<br />

Grind<br />

7<br />

T&B<br />

Grind<br />

4<br />

T&B<br />

Grind<br />

4<br />

Periphery<br />

Grind<br />

34<br />

Sap<br />

Daily<br />

Production<br />

Scheduling<br />

Hone<br />

3<br />

PreCoat<br />

Vaqua<br />

1<br />

Electro<br />

Polish<br />

2<br />

Electro<br />

Polish<br />

1<br />

Forecast<br />

90/60/30<br />

Daily Order<br />

<strong>Lean</strong>Jet<br />

Wash<br />

1<br />

Crest<br />

Wash<br />

1<br />

Auto<br />

CVD<br />

1<br />

Furnace<br />

14<br />

PreCoat<br />

Vaqua<br />

1<br />

Berney<br />

Polish<br />

1<br />

CA02<br />

CA04<br />

CA13<br />

CA16<br />

CN04<br />

MS14<br />

MS10<br />

MS05<br />

OEM<br />

Mark<br />

Pack<br />

QC<br />

Ship<br />

CN03<br />

CA01<br />

CN08<br />

<strong>Kennametal</strong><br />

Distribution<br />

Daily<br />

Brush Branson<br />

T&B Periphery Hone<br />

Polish Wash<br />

Press<br />

Grind Grind 1<br />

2<br />

1<br />

2 Furnace 10<br />

3 34<br />

Separate 1<br />

7.8 days .3 d .4 d 1.5 d .4 d 2.2 d C.T. 420 s 1.1 d 1.9 d .4 d 3.3 d .1 d .6 d<br />

CT 10 s<br />

CT 61,200 s C.T. 1 s<br />

CT 180 s C.T. 120 s C.T. 120 s C.T. 180 s C.T. 960 s CT 1800 s<br />

CT 79,400 s C.T. 360 s C.T. 1800 s CT 78 s<br />

<strong>Lean</strong>Jet<br />

Wash<br />

1<br />

<strong>Lean</strong>Jet<br />

Wash<br />

1<br />

SMPL<br />

3 units<br />

Lead time 21.9 Days<br />

Cycle time 1.9 d<br />

Takt Time 3.78 s<br />

Supplier<br />

Raw<br />

Purchase Purchase<br />

Daily<br />

P<br />

l<br />

a<br />

n<br />

Value Value Stream Stream Mapping Mapping Mapping – Future State<br />

P<br />

r<br />

e<br />

s<br />

s<br />

F<br />

III<br />

F<br />

O<br />

S<br />

i<br />

n<br />

t<br />

e<br />

r<br />

Implementation Plan<br />

•Work details of Future State<br />

•Review lead-times & safety stock qty.<br />

•Level load high volume items<br />

•Establish inventory turns<br />

•Setup Reduction for Press operation<br />

•Establish FIFO lanes<br />

•Error Proof process<br />

•TPM process at customer critical points<br />

•Standard Work Kaizen on Auto CVD<br />

Furnaces and Top Coat Furnace<br />

Metrics<br />

F<br />

III<br />

F<br />

O<br />

H<br />

o<br />

n<br />

e<br />

F<br />

III<br />

F<br />

O<br />

WIP:<br />

Finished Goods :<br />

Scrap:<br />

Material:<br />

Floor Space:<br />

Setup Reduction:<br />

Cycle Time:<br />

Productivity:<br />

Administrative:<br />

6 week forecast forecast forecast<br />

Daily FAX<br />

E<br />

P<br />

l<br />

o<br />

e<br />

l<br />

c<br />

i<br />

t<br />

s<br />

r<br />

o<br />

h<br />

F<br />

III<br />

F<br />

O<br />

V<br />

B<br />

a<br />

l<br />

q<br />

a<br />

u<br />

s<br />

a<br />

t<br />

May 03<br />

Baseline<br />

Wash<br />

I I<br />

F<br />

III<br />

F<br />

F<br />

III<br />

O<br />

F<br />

O<br />

FIFO FIFO FIFO<br />

FIFO FIFO FIFO<br />

Ma y June July<br />

RESP<br />

2 9 16 23 30 7 1421285<br />

1219<br />

Staff<br />

Lgst<br />

Lgst<br />

Lgst<br />

KC8050 KC8050 KC8050<br />

KC9110 KC9110 KC9110<br />

KC9125 KC9125 KC9125<br />

KC9315 KC9315 KC9315<br />

KC9025 KC9025 KC9025<br />

KC9045 KC9045 KC9045<br />

KC9245 KC9245 KC9245<br />

KC9225 KC9225 KC9225<br />

KC9010 KC9010 KC9010<br />

KC990 KC990 KC990<br />

KC9120 KC9120 KC9120<br />

Mfg 1<br />

•Determine placement of FIFO lanes Mfg 1<br />

F<br />

III<br />

F<br />

O<br />

F<br />

III<br />

F<br />

O<br />

Sap<br />

Daily<br />

Production Production Production<br />

Scheduling Scheduling Scheduling<br />

Mfg 1<br />

Mfg 2<br />

Mfg 3<br />

Mfg 3<br />

6 month<br />

Projection<br />

140,000 pcs. 92,000 pcs.<br />

4.8% 2.0%<br />

NA NA<br />

Process Layout Product Layout<br />

1.9 days 1.9 days<br />

24 employees 21 employees<br />

FIFO FIFO FIFO<br />

Separ ate Ber ney<br />

MPL<br />

FIFO<br />

Forecast<br />

90/60/30<br />

Daily Order<br />

�� � Dedicated Dedicated Dedicated equipment equipment equipment by grade<br />

Separ Separ Separate ate<br />

FIFO FIFO FIFO<br />

FIFO<br />

OEM<br />

Br ush Polish<br />

Separate Separate Separate MPL<br />

5 days .3 d .4 d .5 d .4 d 2.2 d 1.1 d<br />

1.9 d .4 d 1.3 d .1 d .6 d<br />

CT 10 s<br />

CT 61,200 61,200 s<br />

C.T. 1 s CT 180 s C.T. 120 ss s<br />

C.T. 420 ss s CT 1800 1800 ss s<br />

C.T. 960 ss<br />

s<br />

CT 79,400 79,400 79,400 sss C.T. 360 sss CT 1800 sss C.T. 78 sss<br />

Total Savings<br />

$40,320<br />

$85,603<br />

-0-<br />

TBD<br />

28 min 21 min $35,119<br />

-0-<br />

$151,975<br />

NA NA -0-<br />

<strong>Kennametal</strong> <strong>Kennametal</strong> <strong>Kennametal</strong><br />

Distribution Distribution Distribution<br />

Lead time 16.9 Days<br />

Cycle Cycle Cycle time 1.9 d<br />

Takt Time 3.78 s<br />